HomeMy WebLinkAboutPermit Electrical 1994-12-27The tollowing project
zoning, and does not
approval.
SPFtIIGFtELD
as sr"rbmitted has
require opariiio land use
BIAffiRICAI PERUIT APPLICATTON
City Job |iJun[s;
3. COI{PI^ErE FEE SCESDULE BBLOg
A.
225 FTPTE STREET
SPRINGFIELD OREGON 9
UDL
,
TNSPBCTTON REQIIEST:
3759
47
Pt^OFPICE: 126-
1. LOCATTON
IJGAL DESCRIPTION
Nev Residential-Single orMulti-Family per av611ing unit.)ervlce Incl_uded:(- ?-2a77 /?+re,
L000 sq.ft. or less
Each additional 500sq. ft or portion
thereof
Each Manuf,d Home orModular DvelIing
Sertice or Feeder
B. Services or Feeders
Ins tallation, Alterationsor Relocation:
7 $1s.00 ad
$ 40.00
Cost Sum
$ es.00. #
$ s0.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
I tems
ts are on-ferable and ex pireif vork is not star ted vithin 180 daysof issuance or if vork i s-suspended for180 days.
2. CONTBACTOR INSTALI,ATION ONLY
ELectrical Contractor C:
Address Pd Sr>< tn{,1
Ci ty v\PhonelT-l,o -1303
Supervisor Licerlse Number Lblt 5
Expiration Date tol,lqr-,
constr contr. Number b5b6l
Expira
Signat,
tion Date 3 z*qlc
Address
ci Phone
OVNER INSTALI.,ATION
The installation is being made on
property I ovn vhich is not intended
for sa1e, lease or rent.
Orners Signature:
DATE:
c
200 amps or less
201 amps to 400 amps
Over 401 to 600 amps
5. SUBTOTAL OF ABOVE
5Z State Surcharge
3Z Administrative Fee
TOTAL
Temporary Services or FeedersInstallation, Alteration or Relocation
200 amps
201 arnps
401 amps
601 amps
0ver 1000
Reconnect
or lessto 199 amps
-to 600 amps
-to 1000 amps-
amps/volts
-0n1y
%P..f-
€c
I
$
40.00
5s.00
80.00tri$
D
Over 600 "rp" or 1000Ef[s see "Bn aEF
Branch Circui ts ; ..
Nev, Alteration or Extension Per Panel
One Circuit $ 35.00
Each Additional
Circuit or with Service
or Feeder Permit $ 2.00
E. Hisce.llaneous (Service/feeder not included)
-Each installation
Pump or irrigation $
Sign/0ut1ine Lighting- $
Limited Energy/Res
-
$Limited Energy/Comm $
40.00
40.00
20.00
36.00
//u?f,zf7,7'iffiRECEIVED
CITY OF