Loading...
HomeMy WebLinkAboutPermit Electrical 1994-12-27The tollowing project zoning, and does not approval. SPFtIIGFtELD as sr"rbmitted has require opariiio land use BIAffiRICAI PERUIT APPLICATTON City Job |iJun[s; 3. COI{PI^ErE FEE SCESDULE BBLOg A. 225 FTPTE STREET SPRINGFIELD OREGON 9 UDL , TNSPBCTTON REQIIEST: 3759 47 Pt^OFPICE: 126- 1. LOCATTON IJGAL DESCRIPTION Nev Residential-Single orMulti-Family per av611ing unit.)ervlce Incl_uded:(- ?-2a77 /?+re, L000 sq.ft. or less Each additional 500sq. ft or portion thereof Each Manuf,d Home orModular DvelIing Sertice or Feeder B. Services or Feeders Ins tallation, Alterationsor Relocation: 7 $1s.00 ad $ 40.00 Cost Sum $ es.00. # $ s0.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 I tems ts are on-ferable and ex pireif vork is not star ted vithin 180 daysof issuance or if vork i s-suspended for180 days. 2. CONTBACTOR INSTALI,ATION ONLY ELectrical Contractor C: Address Pd Sr>< tn{,1 Ci ty v\PhonelT-l,o -1303 Supervisor Licerlse Number Lblt 5 Expiration Date tol,lqr-, constr contr. Number b5b6l Expira Signat, tion Date 3 z*qlc Address ci Phone OVNER INSTALI.,ATION The installation is being made on property I ovn vhich is not intended for sa1e, lease or rent. Orners Signature: DATE: c 200 amps or less 201 amps to 400 amps Over 401 to 600 amps 5. SUBTOTAL OF ABOVE 5Z State Surcharge 3Z Administrative Fee TOTAL Temporary Services or FeedersInstallation, Alteration or Relocation 200 amps 201 arnps 401 amps 601 amps 0ver 1000 Reconnect or lessto 199 amps -to 600 amps -to 1000 amps- amps/volts -0n1y %P..f- €c I $ 40.00 5s.00 80.00tri$ D Over 600 "rp" or 1000Ef[s see "Bn aEF Branch Circui ts ; .. Nev, Alteration or Extension Per Panel One Circuit $ 35.00 Each Additional Circuit or with Service or Feeder Permit $ 2.00 E. Hisce.llaneous (Service/feeder not included) -Each installation Pump or irrigation $ Sign/0ut1ine Lighting- $ Limited Energy/Res - $Limited Energy/Comm $ 40.00 40.00 20.00 36.00 //u?f,zf7,7'iffiRECEIVED CITY OF