Loading...
HomeMy WebLinkAboutPermit Plumbing 1992-01-31lza tot 1bl - 1b6 t\o>q u) BLOCK: SPrr ELE, o /'..1 l*3- LOt TAX LOT: SUBDIVISION: JOB NUMBER LOCATION Of: PROPOSED WORK: ASSESSORS MAP: RESIDENTIAL PERMIT APPLICATION lnspections:726-3769 Off ice: 726-3759 225 Fifth Street Spring field, Oregon 97 477 PHONE S;=#<,"1 e(L ZIP:STATE ),4OWNER CITY: ADDRESS NEW - REMODEL ADDITION DEMOLISH OTHER {DESCRIBE WORK @tu 4qo^sbtlCu_ ADDRESS EXPIRES PHONE Dylee: ?Juubry w.PI.UMBINC CONTRACTOR'S NAME CENERAL: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # RANGE r OF BDRMS: - OFFICE USE - ZONING CODE: trLOOD PLAIN SECONDARY HEAT: WATEB HEATER QUAD AREA: , OF BLDGS CONSTR. TYPE HEAT SOURCE: LAND USE: # OF UNITS SQUARE FOOTAGE: OCCY GROUP: r OF STORIES: To request an inspection, you must call 726-3769. This is a24 hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested atlerT:OO a.m. will be made the following work day. REQUIRED INSPECTIONS Temporary Eleclric Rough Mechanical - Prior to cover. Final Plumbing - When all plurnbing worl< is complete. Site lnspection - To be made af ter excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover. Underslab Plumbing/ Electrical / Mechanical - Prior to cover. Eleclrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting. OtherFoundation - After forms are erected but prior to concrete placement. Underground Plumbing - Prior to filling trench. MOBILE HOME INSPECTIONS Underlloor Plumbing/ Mechanical - Prior to insulation or decking.Wood Stove - After installation Post and Beam - Prior to floor insulation or decking.lnsert - After flreplace approval and installation of unit. Blocking and Set-Up - When all blocking is complete. Floor lnsulalion - Prior to decki ng.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Conneclions - When home lras been connected to water and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Sidewalk & Driveway - After excavation is complete, {orms and sub-base material in place. Water Line - Prior to lilling trench. Fence - When completed. Slreet Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, clecks, and venting have lteen installec!. Rough Plumbing - Prior to cover. I 3 tl tl tl tl fl tl E E Storm Sewer - Prior to filling trench. [-l Fireptace - Prior to faclnglJ materials and framlng lnsp. l-_l Framing - Prior to cover. [_-l watttCeiling ]nsulation - Prior tot__-J cover. f_l Drywalt - Prior to taping. r tl r tl tlr Lot faces Lot sq. ftg. Lot coverage TopographY Total height Lot Typq -- lnterior - Corner =- Panhandle - Cul-de-sac Setba<;l<s P.L.HSE GAR ACC N E, IS THE PROPOSED WORK IN THE HISTORICAL DISTFIICT, OR ON THE HISTORICAL REGISTEB? - lf yes, lhis application must lle signed and approved bY t hc Fl i s torical Coordinator prior to pernlit issuance. APPROVED: BUTLDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is grante<i on the express conditiorl that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Cocle, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Receipt Number:=- Plans ReviewetJ By Date Plan Check Fee: Date Paid Received By VALUE (A) X $/SO. FT Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SO. FT. Main Garage Carport Systems Development Charge is due on all undeveloped properties within tlre City limits which are being improved. SYSTEMS DEVELOPMENT CHARGE (SDC) (B) ADDITIONAL COMMENTS ITEM Fixtures Residential Bath(s) Sanitaty Sewer Water Storm Sewer Mobile Home PLUMBING PERMIT FEE N0 4o.oo 40.Db L-&_ F-t FT. FT. (c)_4L.@ Plumbing Permit State Surcharge Total Clrarge Wood Stove/ lnsert/ Fireplace Uni t Dryor Vent (D) N0Vent Fan Mechatrical Pertrtit lssuance State Surcharge Total Permit MECHANICAL PERMIT Fu rnace Exhaust Flood By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information hereon is true and correct, and I Iurther certify that any and all work performed shall be done in accordance with the Ordinances of thc City of Springfield, and ttre Laws of the Statc of Orcl;cttt 1>crt;rining to thc worl< <lcscribr:d hcreirr, lrrrtl tlrat NO OCCtJt'1ANCY will br: ttt;ttlc of itrty structulc witllout pcrtrtission of tl-tc Building Safety Divisiotr. I further ccrtify th;rt or-rly contractors and ertployeos wl-to arc in cotnpliance witl't ORS 7O1.055 will bc usc<J on tltis proiect. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front Date re of the property, and the aPP roved set of plans will remain mes NS ",n"t ionon the site MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk -_- ft Curbcut -_ ft Demolition State Surcttarge Total Miscellaneous Permits (E) RECEIVED BY AMOUNT RECEIVED DATE PAID VALIDATION: RECEIPT NUMBER TOTAL AMOUNT DUE (excluding clectrical) (A, B, C, D, and E Combined) 4r 4t