Loading...
HomeMy WebLinkAboutPermit Building 1997-11-04RES'D ENI'A tPER|IITAPPL,CATION lnspec tions:726.3 769Office:726-3759 LOCATION OF PBOPOSED WORK: ASSESSOES MAP; LOI JOB NUtvIBER g ar 4 7/ 225 Fifth Street Sprlngfleld, Aregon 97427 BLOCK: 5 o b TAX LOT . SUBDIVISION: PHONE: O-,>eSTATE:ZIP: OWNER: ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH OTHER DESCRIBE WOFIK: ADDRESS5c EXPIRES .f PHONE CONTRACTOR'S NAME GENERAL: PLUMBING: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # SE-40y # OF BDRMS WATER HEATER: ZONING CODE: FLOOD PLAIN HEAT SOURCE: CONSTR. TY QUAD AREA: # OF BLDGS SECONDARY HEAT: SOUABF" FOOTAGE: OCCY GROUP: C OF STOBIES: toF To request an inspection, you must call 726-3769. Thls ls a24hour recording. All lnspections requested before 7:00 a.m. wlll be made the same worklng day, lnspections requested after 7:00 a.m. wlll be made the followlng work day. REQUIRED INSPECTIONS Temporary Electrlc Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing worl( is complete. Site Inspection - To be made after excavation, but prior to setting forms. Rough Electrlcal - Prior to Final Electrical - When all electrical work is complete.cover Underslab Plumblng/ Electrical / Mechanlcat - Prlor to cover. Electrlcal Service - Must be approved to obtain permanent electrlcal power. tl Final Mechanlcal - When all mechanlcal work ls complete. Foollng - After trenches are excavated.Flreplace - Prlor to faclng materlals and framing lnsp. Final Buildlng - When all required lnspectlons have been approved and building is completed,Masonry - Steel locatlon, bond beams, groutlng.Framlng - Prlor to cover. OtherFoundatlon - After forms are erected but prlor to concrete placement.WalltCelllng lnsulatlon - Prlor to cover. Underground Plumblng - Prior to fllling trench. MOBILE HOME INSPE TIONS Underlloor Plumblng/ Mechanlcal - Prior to lnsulatlon or decklng. Post and Beam - Prior to floor lnsulatlon or decking. Blocking and Set-Up - When all blocklng is complete. Floor lnsulation - Prior to decking.Curbcut & AJrproach - After forms are erected btlt Prior to placoment of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and Plumbing inspections have been apProved and the home is connected to the servlce panel. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is comPlete, forms and sub-base material in Place. [t7'Wut", Llne - Prlor to filling \ltrencn. Fence - When cciriPleted Rough Plumbing - Prlor to cover. Streel Trees - When all required trees are Planted. Final - After all required inspections are aPProved and porches, sklrting, decks, and ventlng have been installed' RANGE: tl E E E E E E tf E E E flE E fl E E l--l Drywall - Prlor to taplng. l-l Wood Stovo - After lnstallatlon.ll [-_l lnsert - After flreplace approval|J and installation ol unlt. tl E E E i,,r Lot taces Lot sq. ftg. Lot coverage TopographY Total height Lot Type - - lnterior _* Corner - Panhandle ! - Cul-de-sac P.L.HSE GAR ACC N S E_- r-\S THE PROPOSED VIORK \N THE . HISTORICAL DISTtr}CT,on oN THE HISTORICAL REGISTER? - lf yes, this application must be slgned and aPProved bY the H istorlcal Coordinator prior to permit issuance' APPROVED: VALUE (A) -,t MIT Total Value Building Permit Fee State Surcharge Total Fee FT. X $/SO. FT. BUILDING PER ITEM SO. Main Garage Carport This permit is granted on the cxpress condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordlnances. Plans Reviewed By Date Receipt Numbe BU ILDING AND BUIL EH KccLANLUE MR TDNPG Plan Check Fee: Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Moblle Home 51. *a FEE a,t*.u< (c) N0 PLUMBING PERMIT FT. Plumblng Permit State Surcharge 1, O7'la Total Charge . FT. ADDITIONAL COMMENTS By slgnature, I state and agree, that I have carefully examlnedthe completed application and do hereby certify that alllnformation hereon is true ancl correct, and I f urther cerflfy that any and ail work performed shail be done in accorrjance with the Ordinances of the City of Springfield, and the Lawsof the State of Oregon pertainlng to the work descrlbed herein, and that NO OCCUPANCy will be made of anystructure without perrnission of the Building Safety Division.I further certify that only contractors and employees whoare in compliance with OFIS 701.055 will be usect on thisproject. I further agree to ensure that all required inspections areuested at the proper time, that each address is readable m the street, that the permit card ls located at the frontthe property, and the approved set of plans will Date req lro of remalnon the site at I times duri constructl Signature Wood Stove/ lnsert/Flreplace Unit Dryer Vent MISCELLANEOUS PERMITS MECHANICAL PERMIT Total Miscellaneous pennits (E) (D) No Mechanical Permit lssuance State Surcharge Total Permit Mobile Home State lssuance state surcharge Sidewalk tt Curbcut -- ft Demolition State Surcharge Furnace Exhaust Hood Vent Fan TOTAL AMOUNT DUE (excluding electricat)(A, B, C, Q and E Combtned) tq'{aro--t.*-zzr- [>c.t- o DATE PAID q. 4C)AMOUNT RECEIVED BY VALIDATION: RECEIPT NUMBER #s.-il-&afi RESIDENTIAL PERMIT APPLICATION lnspections: 226.3769 Office: 726-gt59 LOCATION OF PROPOSED WOBK: ASSESSORS MAP; LOT To request an inspectlon, you made the same worklng day, n femporary Electric Site lnspectlon - To lre made after excavation, but prior to setting forms. Underslab Plumblng/ Electrical / Mechanlcat - Prlor to cover. Footlng - After trenches are excavated. Masonry - Steel locatlon, bond beams, groutlng. Foundatlon - After forms are erected but prlor to concrete placemont. Underground Plumbing - Prior to filllng trench. Underlloor Plumblng/ Mechanlcal - Prior to lnsulatlon or decklng. Post and Beam - Prior to floor lnsulation or decking. Rough Mechantcal - prior to cover. Rough Electrical - Prlor to cover. Electrical Service - Must be approved to obtaln permanent electrlcal power. Final Plumbing - When allplumbing work is complete. Final Electrlcal - When all electrical work is complete. Final Mechanical - When all mechanical work ls complete. Plumbing Connections - When home lras been connected to water and sewer. Electrical Connection - When blocking, set-up, and plumbing Inspections have been approved and the home ls connected to the service panel, Final - After all required inspectlons are approved and porches, skirtlng, decks, and ventlng have been lnstalled. FIE JOB NUtvIBER 225 Fifth Street Springfleld, Oregon 97477 <?/ TAX LOT:7<Or/ BLOCK:SUBDIVISION must call 726'3769. Thls ls a 24 hour recordlng. AII lnspections requested before 7:00 a.m. wiil belnspections requested after 7:00 a.m. wlI be made the foilowrng work day. REOUIRED INSPECTIONS [-l Flreplace - Prtor to faclng - materlals and framing lnsp, >--__J J25IJt'-lns - Prlor to cover. fA Final Building - When ail 'ru required lnspectlons have been approved and building is completecl. [-l Blocking and Ser.Up - When ail.4 blocking ls complete. WalllCelllng lnsutatlon - Prlor to cover. MOBILE HOME TNSPECTIONS Floor lnsulalion - Prior to decking. Sanitary Sewer - Prior to filling trench. Storm Sewer - Prlor to fllling trench. Water Llne - Prlor to filling trench. l-_-l Drywall - Prlor to taptng. l-_l Wood Stovo - After lnstailation. lnserl - After flreplace approvgl and lnstallation of unlt. Curbcut & Approach - After forms are erected but prior to placement of concrete. Sidewalk & Drlveway - After excavation ls complete, forms and sub-base material ln place. Fence - When ccr-rrpleted. OWNER: ADDFIESS: CITY: PHONE: ZIP:STATE: BEMODEL, t .DEMOLISH OTHERADDITION DESCRIBE WORK: NEW ._- ADD CONST. IRES ,' PHONE CONTRACTOB'S NAME MECHANICAL: ELECTRICAL: GENERAL: PLUMBING - OFFICE USE - LAND USE: , OF UNITS: ---- FLOOD PLAIN: ZONING CODE: , OF BDFIMS: -- WATER HEATER RANGE: QUAD AREA: * OF BLDGS: SECONDARY HEAT: SOUARE. FOOTAGE: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOURCE: tl Rough Plumblng - Prior to cover. E Other - Street Trees - When all requlred trees are planted. r E r Lot faces Lot sq. ftg. Lot coverage TopograPhY Total helght Lot TYP* - lnterior - Corner - Panhandle Ii - Cul-de'sac P.L.HSE GAR ACC N S W E IS THE PROPOSED WORK TN THE. HISTORICAL DISTRIC-I', OR ON THE HISTORICAL REGISTER? - lf yes, thls appllcatlon must be slgned and approved bY the Historlcal Coordinator prlor to permit issuance. ,APPROVED: This permit is granted on the express condition that the said construction shall, in all respects' conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordlnances' Plans Reviewed BY Date Recei pt Numbe BUILDI AND B1 KECcHLAN ITMPRLDNGU Plan Check Fee: Date Paid Fleceived By: VALUE Total Value Building Permit Fee State Surcharge Total Fee SQ. FT, X $/SQ. FT. BUTLDING PENNfrIT ITEM Main Garage Carport Systems Development Charge is due on all undeveloped properties within tlre City limits which are being improved. SYSTEMS DEVELOPMENT CHARGE (SDC) (B) ITEM Fixtures Residential Bath(s) Sanitary Sgwer Water Storm Sewer Moblle Home FEE (c) Nc FT. FT. PLUMBING PERMIT Plumblng Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/lnsert/Flreplace Unit Dryer Vent (D) NoVent Fan Mechanical Permit lssuance State Surcharge Total Permlt MECHANICAL PERMIT Furnace Exhaust Hood By slgnature, I state and agree, that I have caref ully examlned the completed application and do hereby certlfy that all lnformation hereon is true and correct, and I f urther certlfy that any and all work performed shall be done in accordance with the Ordinances of the City of Sprlngfield, and the Laws of the State of Oregon pertainlng to the work descrlbed herein, and that NO OCCUPANCY will be made of any structure without permission of the Buildirrg Safety Divislon. I further certify that only contractors and employees who are in compliance with ORS 701.055 wlll be used on thls proiect. I {urther agree to ensure that all reguired lnspections are requested at the proper tlme, that each address ls readable lrom the street, that the permlt card ls located at the front of the property, and the approved set of plans will remaln on the site at I times du Slg natu re Date constructlon. MISCELLANEOUS PERMITS Moblle Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Mlscellaneous Permits (E) TOTAL AMOUNT DUE (exctuding electricat) (A, B, C, Q and E Combtned) VALIDATION: RECEIPT NUMBER 276/3 / DATE PAII-) AMOUNT HECEIVED RECEIVED BY (A) t FT.