Loading...
HomeMy WebLinkAboutPermit Building 1991-08-01COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fiftn Street, Springfield, Oregon 97477 SPRINGFTELO JOB NUMBER ?' a INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK: ASSESSORS MAP: 4 TAX LOT:alzec t I ^ PHONE STATE:ZIP: -21 CITY: ADDRESS: OWNER: REMODEL ADDITION DEMOLISH OTHER VALUE: DESCRIPTION OF WORK: NEW X ADDRESS PHON E ADDR EXPIRES PHONEfra,CONTRACTOR'S NAME GENERAL: PLUMEING: MECHANICAL: ELECTBICAL: NAME ffi z/lrz4Br CONST. CONTRACTOR # PLU MBING NO.FEE CHARGE 4e Single Fixture 49A-* Relocated Bldg (new f ix. addtl) c/Water Service 26dt ?D,4 Sanitary Sewer lZart 4fu,a ,/-Storm Sewer zeaft.?2G Backf low Device TOTAL PERMIT 66a.e MECHANICAL NN trtrtr rrHA trAtr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater te Appliance Vent separate 4*/.c.-d Stationary evap. cooler /s Vent Fan/Single duct 74 <qaa Vent System apart from AC or htg. 6 Mechanical exhaust hood and duct /F 2?,e Permit lssuance $10.00 TOTAL PERMIT ,/d?_ "o kl Rea* l,r'kz _ OFFICE USE _ €/A:af - LAND USE: LIGHTING POWER BUDGET: * OF UNITS: HANDICAP ACCESS FLOOD PLAIN ZONING Z,_ WATER HEATER OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: $/so. FT.VALUE 627 a. X zoaTvTar- ?a*.xz- SQ. FT. SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER ira- /5 BYRCPTs 267/c/DATEPLAN CHECK FEE r/z ??. oo BUILDING PERMIT 4?e- sa PLUMBING /4,/4?. ao DEMOLITION 5% State Surcharoe .??.€>5% State Su rcharoe 4q- aa Z*zz.rfu,44,8 bvta* MECHANICAL /o?. ?,FENCE VALUE $A.Ee7Z?rlE :(-// B)7 5% State Surcharge f.yf,SIDEWALK2sr FI.4z-6s SUBTOTAL PERM ITS /ZI4ZZ PAVINGI t2,bx>9a.sa CURBCUTZ-ZA/ta*t.Sg-no SYSTEMS DEVELOPMENT 2,702.") z-boGs. TOTAL PERMIT FEES EXCLUDING ELECTRICAL e*'.?7/7? 6 ,- /" , dae tb tra? rorAL vALUE or paorcq ,14 ffi 4eaM 6-2a'Ti:'fr*r REQUIRED INSPECTIONS .V It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. )< > v SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. X cuRB AND APPRoAcH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be f urnished to the Building Division. STRUCTURAL WELDS: Performed on the job. (2722 t) During all bolt installation and ti ghteni ng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.l1 & Chapter 29) cLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-1011). STRUCTURAL MASONRY: (306 a.7) *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure. compliance with the Building, City or Development Code. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and STRUCTURAL CONCRETE: In excess of 2500 PS.l. (306 a.1) the rough electrical, plumbing HIGH STRENGTH BOLTING: CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUND: PIumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of f loor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or f loor sheathing. x 1' v vFLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with OFIS 701.055 will be used on this proiect. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from thestreet, that the permlt card is located at the front of the property, and the approved set of plans will remain on the site at alltimes during construction. Signature Date VALIDATION AMOUNT RECEIVED: RECEIPT *:RECEIVED BY: DATE PAID: v / { v FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT v .v SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: -- PLANS REVIEWED DATE q c "7.7 CO M M ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fitfi Street, Springfield, Oregon 97477 :iPRINGFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK ASSESSORS MAP: 4 TAX LOT:3fi6 t' ' -' PHONE: STATE: ai,4, CITY: ADDRESS: OWNER: NEW -)a REMoDEL ADDtloN DEMoLtsH orHER VALUE aoa DESCRIPTION OF WORK: MECHANICAL: ADDRESS PHONE EXPIBES PHONEA GENEBA ftr,CONTRACTOR'S NAME PLUMBING ELECTRICAL: NAME ,D 2,/&Br CONST. CONTBACTOR # PLUMBING NO.FEE CHARGE UQ Single Fixture 4ge.* Relocated Bldg. (new fix. addtl) t/Water Service 2eat.2d,4 Sanitary Sewer fZan.rkn a,/-Storm Sewer zbft.?2-b Backflow Device TOTAL PERMIT 66a€ MECHANICAL NO FFF EHA RGF Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater e Appliance Vent separate 4*/ -?--a Stationary evap. cooler 1s Vent Fan/Single duct 7*<qoo Vent f rom System apart AC or htg. 6 Mechanical exhausl hood and duct /5a -a al61./. Permit lssuance $10.00 TOTAL PERMIT /o?- o" 6 2- HANDICAP ACCESS:- OFFICE USE _ I OF UNITS: LIGHTING POWER BUDGET: FLOOD PLAIN ZONING: 1- WATER HEATER: OCCY GROUP: * OF STORIES: QUAD ABEA: r OF BLDGS: LAND USE: CONSTR. TYPE: HEAT SOURCE: $/so. FT. TOTAL VALUE OF PROJ VALUE X ,/ - , aac> X ZaaryTaa Pa^.2re7 - SQ. FT.a2ZaSQ. FTG MAIN SO. FTG ACCESS SQ. FTG OTHER ira- /5 BYDATE4-;t1r,PLAN CHECK FEE RCPT t ZO?/t/ /z??.oo BUILDING PERMIT {9e. ra PLUMBING A^,/4o.ao DEMOLITION 5% State Surcharge '??.<v 5% State Surcharoe 4q- od Ga>zr,*,Zals &-z*, MECHANICAL /2?. a,FENCE VALUE $.h--aO-- - ^-\-.(-t,/ B:7' 5% State Surcharoe f.yf,SIDEWALK2Cf Fr.42.6r SUBTOTAL PERM ITS /Z14ZZ PAVINGC l2,gat>9o-sa CURBCUT2-7D,zzztEt.Sg.no SYSTEMS DEVELOPMENT z,7d?.", /-Vo oFt4. TOTAL PERMIT FEES EXCLUDING ELECTRICAL OR zrp, ?yZ? z-/ Rez* k*z 4cs 2 @ X T i;- frz'ma REQUIRED INSPECTIONS It ls the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:O0 a.m. will be made the following work day. slTE INSPECTION: To be ,y RoucH PLUMBING, X pAVtNG: After gravet is in made after excavation, but ELECTRICAL & ' place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these )< > v x UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. {FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterlor, is in place but before any plastering is applied or before gypsum board lolnts and fasteners are taped and f inished. v STDE*ALK & DRTVEWAy: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. X cuRB AND AppRoAcH APRONS: After forms are erected but prior to placing concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: tn excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 tl HlGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFTNG: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.BC. STDS. 25-10J1). STRUCTU RAL MASONRy: (306 a.7) CONCRETE SLAB: To be made after all lnslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathlng. POST & BEAM: To be made prlor to installation of floor lnsulation, decking or floor sheathlng. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. { t v MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any constructlon work to ensure. compliance with the Buitding, Clty or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informationherein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCYwill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that prolect address is readable from thestreet, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at alltimes during constructlon. Signature Date VALIDATION AMOUNT RECEIVED BECEIPT *: DATE PAID: y FTNAL PLUMBTNG / F,NAL ELE.TRT.AL v FINAL MEcHANTcAL Y FINAL FtRE DEPARTMENT FINAL BUILDING: Requested after the final plumbing, electrical,mechanical and Fire Department inspections are made andapproved. No occupancy of the premises can be made until aCertificate.of Occupancy has been issued by the Building Divisionand posted on the premises. y SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wlsh lnspection. All project condliloni such aslandscaping, parking lot striping, etc. must be completed beforerequestlng this inspection. .v ADDITIONAL COMMENTS: PLANS REVIEWED DATE 7-7 -q/ v li r)RECEIVED BY: