HomeMy WebLinkAboutPermit Building 1991-08-01COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fiftn Street, Springfield, Oregon 97477
SPRINGFTELO JOB NUMBER ?' a
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:
4
TAX LOT:alzec t I ^
PHONE
STATE:ZIP:
-21
CITY:
ADDRESS:
OWNER:
REMODEL ADDITION DEMOLISH OTHER VALUE:
DESCRIPTION OF WORK:
NEW X
ADDRESS PHON E
ADDR EXPIRES PHONEfra,CONTRACTOR'S NAME
GENERAL:
PLUMEING:
MECHANICAL:
ELECTBICAL:
NAME
ffi z/lrz4Br
CONST.
CONTRACTOR #
PLU MBING
NO.FEE CHARGE
4e Single Fixture 49A-*
Relocated Bldg
(new f ix. addtl)
c/Water Service 26dt ?D,4
Sanitary Sewer lZart 4fu,a
,/-Storm Sewer zeaft.?2G
Backf low Device
TOTAL PERMIT 66a.e
MECHANICAL
NN trtrtr rrHA trAtr
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
te
Appliance Vent
separate 4*/.c.-d
Stationary evap.
cooler
/s Vent Fan/Single
duct 74 <qaa
Vent System apart
from AC or htg.
6 Mechanical exhaust
hood and duct /F 2?,e
Permit lssuance $10.00
TOTAL PERMIT ,/d?_ "o
kl
Rea* l,r'kz
_ OFFICE USE _
€/A:af -
LAND USE:
LIGHTING POWER BUDGET:
* OF UNITS:
HANDICAP ACCESS
FLOOD PLAIN
ZONING
Z,_ WATER HEATER
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
$/so. FT.VALUE
627 a.
X
zoaTvTar- ?a*.xz-
SQ. FT.
SQ. FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHER
ira- /5 BYRCPTs 267/c/DATEPLAN CHECK FEE
r/z ??. oo
BUILDING PERMIT 4?e- sa PLUMBING /4,/4?. ao DEMOLITION
5% State
Surcharoe .??.€>5% State
Su rcharoe 4q- aa Z*zz.rfu,44,8 bvta*
MECHANICAL /o?. ?,FENCE
VALUE $A.Ee7Z?rlE :(-// B)7
5% State
Surcharge f.yf,SIDEWALK2sr FI.4z-6s SUBTOTAL
PERM ITS /ZI4ZZ
PAVINGI t2,bx>9a.sa CURBCUTZ-ZA/ta*t.Sg-no SYSTEMS
DEVELOPMENT 2,702.")
z-boGs.
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
e*'.?7/7?
6
,-
/" , dae
tb tra?
rorAL vALUE or paorcq ,14 ffi
4eaM
6-2a'Ti:'fr*r
REQUIRED INSPECTIONS .V
It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
)<
>
v
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
X cuRB AND APPRoAcH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be f urnished to the Building Division.
STRUCTURAL WELDS:
Performed on the job. (2722 t)
During all bolt installation and
ti ghteni ng operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.l1 &
Chapter 29)
cLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-1011).
STRUCTURAL MASONRY: (306
a.7)
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure.
compliance with the Building,
City or Development Code.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
STRUCTURAL CONCRETE: In
excess of 2500 PS.l. (306 a.1)
the rough electrical, plumbing HIGH STRENGTH BOLTING:
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: PIumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
f loor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f loor
sheathing.
x
1'
v
vFLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with OFIS 701.055 will be used on this proiect.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from thestreet, that the permlt card is located at the front of the property, and the approved set of plans will remain on the site at alltimes during construction.
Signature Date
VALIDATION AMOUNT RECEIVED:
RECEIPT *:RECEIVED BY:
DATE PAID:
v
/
{
v
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
v
.v
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises.
ADDITIONAL COMMENTS:
--
PLANS REVIEWED DATE q
c
"7.7
CO M M ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Fitfi Street, Springfield, Oregon 97477
:iPRINGFIELO
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK
ASSESSORS MAP:
4
TAX LOT:3fi6 t' ' -'
PHONE:
STATE:
ai,4,
CITY:
ADDRESS:
OWNER:
NEW -)a REMoDEL ADDtloN DEMoLtsH orHER VALUE
aoa
DESCRIPTION OF WORK:
MECHANICAL:
ADDRESS PHONE
EXPIBES PHONEA
GENEBA
ftr,CONTRACTOR'S NAME
PLUMBING
ELECTRICAL:
NAME
,D 2,/&Br
CONST.
CONTBACTOR #
PLUMBING
NO.FEE CHARGE
UQ Single Fixture 4ge.*
Relocated Bldg.
(new fix. addtl)
t/Water Service 2eat.2d,4
Sanitary Sewer fZan.rkn
a,/-Storm Sewer zbft.?2-b
Backflow Device
TOTAL PERMIT 66a€
MECHANICAL
NO FFF EHA RGF
Furnace/burner & vent
<100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
e Appliance Vent
separate 4*/ -?--a
Stationary evap.
cooler
1s Vent Fan/Single
duct 7*<qoo
Vent
f rom
System apart
AC or htg.
6 Mechanical exhausl
hood and duct /5a -a
al61./.
Permit lssuance $10.00
TOTAL PERMIT /o?- o"
6
2-
HANDICAP ACCESS:- OFFICE USE _
I OF UNITS:
LIGHTING POWER BUDGET:
FLOOD PLAIN
ZONING:
1- WATER HEATER:
OCCY GROUP:
* OF STORIES:
QUAD ABEA:
r OF BLDGS:
LAND USE:
CONSTR. TYPE:
HEAT SOURCE:
$/so. FT.
TOTAL VALUE OF PROJ
VALUE
X
,/ - , aac>
X
ZaaryTaa Pa^.2re7 -
SQ. FT.a2ZaSQ. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
ira- /5 BYDATE4-;t1r,PLAN CHECK FEE RCPT t ZO?/t/
/z??.oo
BUILDING PERMIT {9e. ra PLUMBING A^,/4o.ao DEMOLITION
5% State
Surcharge '??.<v 5% State
Surcharoe 4q- od Ga>zr,*,Zals &-z*,
MECHANICAL /2?. a,FENCE
VALUE $.h--aO-- - ^-\-.(-t,/ B:7'
5% State
Surcharoe f.yf,SIDEWALK2Cf Fr.42.6r SUBTOTAL
PERM ITS /Z14ZZ
PAVINGC l2,gat>9o-sa CURBCUT2-7D,zzztEt.Sg.no SYSTEMS
DEVELOPMENT z,7d?.",
/-Vo oFt4.
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
OR zrp, ?yZ?
z-/
Rez* k*z
4cs 2
@
X
T i;- frz'ma
REQUIRED INSPECTIONS
It ls the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:O0 a.m. will be made
the following work day.
slTE INSPECTION: To be ,y RoucH PLUMBING, X pAVtNG: After gravet is in
made after excavation, but ELECTRICAL & ' place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
)<
>
v
x
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
{FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterlor, is in
place but before any
plastering is applied or before
gypsum board lolnts and
fasteners are taped and
f inished.
v STDE*ALK & DRTVEWAy:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
X cuRB AND AppRoAcH
APRONS: After forms are
erected but prior to placing
concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: tn
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 tl
HlGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFTNG: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25-10J1).
STRUCTU RAL MASONRy: (306
a.7)
CONCRETE SLAB: To be
made after all lnslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathlng.
POST & BEAM: To be made
prlor to installation of floor
lnsulation, decking or floor
sheathlng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
{
t
v
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
constructlon work to ensure.
compliance with the Buitding,
Clty or Development Code.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informationherein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCYwill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that prolect address is readable from thestreet, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at alltimes during constructlon.
Signature Date
VALIDATION AMOUNT RECEIVED
BECEIPT *:
DATE PAID:
y FTNAL PLUMBTNG
/ F,NAL ELE.TRT.AL
v FINAL MEcHANTcAL
Y FINAL FtRE DEPARTMENT
FINAL BUILDING: Requested after the final plumbing, electrical,mechanical and Fire Department inspections are made andapproved. No occupancy of the premises can be made until aCertificate.of Occupancy has been issued by the Building Divisionand posted on the premises.
y SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wlsh lnspection. All project condliloni such aslandscaping, parking lot striping, etc. must be completed beforerequestlng this inspection.
.v
ADDITIONAL COMMENTS:
PLANS REVIEWED DATE 7-7 -q/
v
li r)RECEIVED BY: