Loading...
HomeMy WebLinkAboutPermit Building 1993-07-26COM MERCIAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield' Oregon 97477 LOCATION OF PFIOPOSED ASSESSORS MAP: 03 N ,D ,h, il, JCB NUMBER INSPECTION LINE: 726'3769 OFFICE: 726-3759 TAX LOT: SPRINGFIELO PHONE: ztP'. r bLSTATE: .?-5q) t rhOWNER: ADDRESS CITY: VALUE *DESCRIPTION OF WORK NEW -- REMODEL ADDITION DEMOLISH OTHER PHONEADDRESSNAMEo,L -o7/3 ADDRESS- rI/*L t Zo.-1t 4 rtS f,cs ELECTRICAL: PHONEEXPI CONTRACTOR'S NAME ARCHITECT: MECHANICAL: CONST. CONTRACTOR # GENERAL: PLUMBING FEE I CHARGE.A)d)Single Fixture Relocated Bldg. (new f ix. addtl) Water ce fr. ewerit ary ft ft Backf low Device TOTAL PERMIT NO -lfE --CHARGEFurnace/burner & vent <100,000 BTUs Furnacelburner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater SE pp ance Stationary evaP. cooler Vent Fan/Single d uct Vent em apart f rom AC or ht Methanical exhaust hood and duct $10.00Per!'nit lssuance TOTAL PERMIT FFIC U R ZONING HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER LAND USE: CONSTR. TYPE: HEAT SOURCE: OUAD AREA: * OF BLDGS: VALUE$/sQ. FT.SO. FT, TOTAL VALUE CF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHEB RCPT#PLAN CHECK FEE BYDATE BUILDING PERMIT 44 PLUMBING ;mcc)DEI'./OLITION 5% State Su rch arg e 5% State Surc FENCE LUE S SIDEWALK FT. I OC MECHANICAL SUBTOTAL PERI',4iTS5% State Surch I*tY{K'nrLu-\ory CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL T]ERMIT FEES EXCLUDI I'ii: :LEC] RICAL I 7/a NO. n.L - Storm Sewer Vent hrY OCCY GROUP: * OF STORIES: REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. wlll be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UN DERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage Iines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or vertlcals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be f urnlshed to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 PS.l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRAOING, EXCAVATION AN D FILLING: During earthwork. (306 a.l1 & Chapter 29) cLU.LAM BEAMS: tnspection Certificate by an approved agency, f urnished to the City's Building Division before beams are placed. (2501 U.B,C. STDS. 25-10,11). STRUCTURAL MASONRy: (306 a.7) 'ln addition to the inspec. tions specif ied, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. DATE PAID BECEIVED VALIDAT N AMOUNT RECEIV RECEIPT S: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot stri pi ng, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested af ter the final plumbing, etectrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMM TS PLANS BEVIEWED BY DATE By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at t front of the property, and the approved set of plans will remain on the site at all times during DateSignature nstruc _g -.t-\0n ttl v SPnTNGFTEL(, IJGAL DESCN,IPTION DESCRTPTION Electrical Contractor he..rri 6l.J*,. Address oo G,l[. l'' Permits are non-transferable and expireif vork is not started vithin 180 daysof issuance or if vork is suspended for 180 days. 2. COMRACTOR TNSTALI.,ATION ONLY e-1 S oq.liro specilic ta;'u BLECTRICAL PERHIT APPLICATION Ci ty Job Number 131611 SCBEDULE BBLOS A. Nev Residential-Single or HuIti-FamiIy per dvelling unit. Service Included: Items Cost 1000 sq.ft. or less Each additional 500 sq. ft or portion thereo f Each Manuf,d Home or -Modular Dvelling Service or Feeder $ 8s.00 $ 1s.00 $ 40.00 B. Services or Feedersfnstallation, Alterations or Relocation: 0b 200 amps or less -$ 50. 201 amps to 400 amps $ OO. 401 amps to 600 amps - S1OO. :^.1 i 225 FIFTB STREET SPRINGFIELD, ORBGON INSPECTION RBQTIBST: 0FPICE: 726-3759 97477 726-376 D I.. LOCATION t1a1 il. ', ,, .. INSTALI,.A.TIONOP ,clh F.\ Sum fa-+d rrl Ci ty rt Q-Phone 6?8- 3o'to Supervisor License Number Expiration Date l0 ^l - ,16 8t1 601 amps to 1000 amps 0ver 1000 amps/volts Reconnect 0n1y D. Branch Circuits $ 130. $300. $ ao. 00 00 00 00 00 00 Constr Contr. Number 911?1 Expiration Date -l?- 11 Signature of Supervising ElectricianLA Ovners Name .ful Temporary Services or Feedersfnstallation, Alteration or Relocation 200 amps or less S 40.00201 amps to 4oo amps - $ 55.00over 401 to 6oo amps - S go.oo 0ver 600 amps or IOO0EITs see uB" aETf c OOdr."" . citv Faqs#: phone Ai/Z-5yZ OIINER TNSTALI..ATION The installation. is being made on E.property f own vhich is not intendedfor sale, Iease or rent. 0vners Signature: Nev, Alteration or Extension per panel One Circuit $ 35.00Each Addi rionalCircuit or vith Serviceor Feeder permi t ? $ Z. OO 4 Miscellaneous (Service/feeder not included)-Each installation Pump or irrigation S 4O.OO flq1o:.line Lighting- S ao.ool]rit"q Energy/Res - S 20.OO DATE: RECEI SUBTOTAL OF ABOVE 5Z State Surcharge TOTAL /.4 6A FlJ ?2a 6- za OREGO'UctfY RECEIVBD BY: 5 ^ =tz4_/1 ,- = cITY 0F srRIt{GFIELD sysTEl,rs_l)EyEl0p}rrr{T CHARGEWORKSHEET NAME OR COMPANY: LOCATION: DEYELOP}4ENT TYPE: BUILDING SIZE: I. STORM DRAINAGE ,b To Dete rmine Tota sIz F X $39.78 PER PFU PFU'S) t ) sQ. Ft. ru:5-H3:i,iai,I,*uffi,}I3il3fi5i.i$:[I;.,, SANITARY SEI.JER-CITY2 3 NO. OF PFU'S (See Reverse TRANSPORTATION NO OF UNITS X TRIP RATE X COST PER TRIP \y ADMINISTRATIVE FEES BASE CHARGE (SUBToTAL ABoVE) X .os 5. CREDITS x $401.0s $ x $401.05 $ $401 .05 srmjne Trip Rates) SUBToTAL (ADD ITEMS 1,2, & 3)s TOTAL-CITY SDC s s $13.62 PER PFU + $I0 M|'JMC ADMIN. FEE $ s ToTAL-MIIMC SDC x x See Atta( 4 5 IF DEVELOPMENT IS PROFESSIONAL OFFICES OR INDUSTRIAL: TOTAL-CITY SDC X (50%) = ADJUSTED CITY SDC SAN ITARY SEI.IER-MI.IMC NO. OF PFU'S (Use PFU Total From Item 2 Above) M[,1'1C CREDIT IF AppLICABLE (SEE REVERSE) Kip Burdick SDC Goordinator s ToTAL spc s \\ o\ 9tl I Unknown) s x c 'Ig\e FlxruRE uNtr cALcuLATloN TABLE: r'rumoer of New Fixtures-r Unit Equ)va)ent = Fixtuteun\ts (stoTE' For remodels, calculate only the NEI additional fixtures) NUMBER OF UNIT FI]IrURE NEW FI)CTURES EQUIVALENT UNITS FI)CTURE TYPE Bathtub... Drinking Fountain."" /Head 2 1 2 3 6 2 6 6 1 3 2 1 2 2 1 6 4 LL floor Drain. i nt*"piot" For G rease/Oil /Solids/Etc" " " " " " " "' i ni"t""'pt"tt For Sand/Auto Wash/Etc" " " " " " " " " Laurdry Tub/Clotheswasher" " " Clotheswasher - 3 Or More""" frloOif" Home Park Trap (1 Per Trailer)""'-' i"""ptot For Refri gerator//Vater Station /Etc" " " "'i"""Ftot For Commercial Sink/Dishwasher/Etc" 7 Shower, Single Stall..'......"" Shower, Gang.....'..... Sink, Bar, Commercial' Urinal, StallflVall... Wash Basin/kvatory,Single. Water Closet, Public I nstallation... Water Closet, Private........ Miscellaneous: TOTAL FI}iTURE UNITS cREDlr CALCUI-AT|oN TABLE: Based on assessed value. lf improvements occurred after annexation date in table' calculate credits Credit for Parcel or l-and Only lf Applicable X $ - (Rate X Assessed Value) lmprovement (if after annexation date)x$ (Rate X Assessed Value) GREDIT TOTAL = g Year Annexed Rate per $1,000 Assessed Value Year Annexed Bate per $1,000 Assessed Value 1979 or before 1980 1981 1982 1983 1984 $2.83 2.76 2.71 2.60 2.M 2.33 1985 1986 1987 1988 1989 1990 1991 $2.16 1.90 1.60 0.25 0.87 0.50 0.16 RUNOFF COEFFICIENTS FOR STORM DRAINAGE Residential.0.4 0.9 0.45 0.5 Commercial. lndustrial......... Governmental. lMPERVlous AREA = T.TAL Lor srzE x RUN.FF coEFFrcrENT