HomeMy WebLinkAboutPermit Building 1990-04-18..RESIP'NTIAL..
APPLICAT,JN/PERMTT
225 North Sth Street
SprLngfield" )r,egon 97477
Building Diuision
7 26-37 53
tlechanical
Su El-ec tr ic l an
I
Date:
lre
26-3769 (teeorden ) state yout, City designated job ntmber, job aCiz,ess,inspection,Contyactoz,s cr Antet's nc,ne cnd p;lnne nunber Pequestsafter 7:00 an viLL be nnde the nest wtking dag
SPFIINGHELI)-
Iour City Desigr,ated Job lhtmber Is
Plumb
Reouinoi Tnsnao
r^t is the responoibi-Lila oi tne penrit lrolder tD aee that alt iaspections ee made at the proper tine, that each cddress is teaC,rbie
f.ry-_t!|" at?ee-t, and ttat the-pezr,rit-c_ar.d ia Teated at the frctti of tlte goperty*suiUing Dioician ayproxed pLan shall venain on the Bualdnng site Zt aLL' ttmes.-
PROCEDUPE FOR JNSPEC?IOII R!1UEST:CALL 7
nequested and ahen ilou uiLL be ready foruiLL be nade the sane dcy, tequeste ncde
of inspec=icn
befcre 7:00 anq6
Blocking otd Set-ttp
Plunbing eonnections -- aa)ev qtd uater
Electtical Ccmnection - Blocking, eet-up
ard plwnbing eonnections rn;st be apprcaed
before requesting electrical inspectio:i
Accessory BuilCing
pcz,ckes, skit titrg, decks,Piral - After
etc. are c.omp
Page I of 2
Aesessore Map #
Job Locaticn:
^J
81\o
Tos Lot #
Subdioision:
Amer:
{t '(-7 lAdd.ress:Phone
1ci.
Describe llork:
O<ca7e
Value3Date of App Lieatian wq0
Additicn
RenoCel
/ tr.{o:
General
EJect
SI?E INSPECTION: To be rrude after
etcasation, but pr"iar tc set up of
UNDERSLAB PLUMBTNC, ELECTRTCAL &
WCHilITCAL: ?o be made before ang
r,totk is cotsered.
P)1TING & F)aNDA?fCN: To be np.Ceafter trenches are ezeaated and
forns an,e erected, but prior to
Wurtng ccncrete.
UNDERGROUIID PLT]MBING. SIIIER. W.4TER,
pBAf,lAlE: To be nade pt"ior to fil-
@-iF6nches.
UIIDERFLOOR PLUT,EING & IiECHANTCAL :
o7
floor insu1,ation or decking.
P1S? AND BEAI|: To be made prlot, toinstallaticn of floor insulation ot,
deckitrg
these inspections lnoe been
mad.e and approued..
INSULA?ION/VAPOR BARRTER IIISPECTIOII :
To be maCe after aLL insulaticn and
required uapor beriers @e in pl.a.ce
but before ozy Lath, Wpsun baarC oz,
rnLL coueting is cpplied, and beforeay insulation is concealed.
DRWALL IIISPECAION: ?c be nade
-.
after aLL dtyuall is in place,
but prior to ang tapittg.
Sanitaty seaer eapped at property Lir:e
Septic totk y"arped and filled ti,th gra;sel
linal - I(hen abctte itens are conpleted
and uhen Cemolr,tion is complete o" struc-
ture noued and. prenriaes cleaneC up.
Hcmes
E
I,IAS1NRI: Steel
beans, gYouting
accordstce tLth
241 5.
Location, bond
or oerticals in
U,B.C. Section
Vo1DSTOW:
et,7T;T;A.
After installatlon is
FT.OEPLACE:matai;C Py"Lor to placirq
and before franing
CURB & APPROACII APP.)N: After fonnsue etecteC but priot, to pouring
conc"ete.
SIDEHALK & DRflWAl: Eot aLL can-
ez,etenat fr-Affi stz,eet right-
of-txA, to be made aftet aLL ecea-
oating complete & forn tnrk & sub-
base nctet"ial in place.
IENCE: rarhen eomplete -- Prouide
gates or mooable sections tlwough
P. U. E.
ALL project conditions, such as the i.nstallation of street trees, ccnpletton of the
?equired Landsccpir-7, etc., tmtst be satisfied before the BUILDiliC FIIIAL can be requested.
ilNAL BUILDIN1: The ?inal Building fnspection mtst be requested aftet' the Fi.nal Plunbittg
Electnical, cnC Mecharieal fnspections haoe been made and approoeC.
facing
inepee-
tion.
FRAII|IIC: Ihtst be nequested after
@p"ooat of rough plttrbing, e-Lectri-
cal & necltanical. AL! roofiztg
btactng & chirnneys, etc. rrust be
eonpLeted. tlo ucrk is to be con-
. cealed until this inspeetton ltas'been made and appro"-ed.
FITIAL PLUYNIIG
PIIIAL I4ECHAIIICAL
FINAL ELECTRICAL
@r
*ALL I4ANHCLES AND CLEANOUTS MUST BE ACCESSTBLE, ADJUSTIIE\U TO BE \L4DE t? lt1 CCST T0 cITy
!
tr
r
E
n
l1 ,,ouorn ro ,
JOB NO.soLAR ACCESS REQ.-L-co d
Zone:
Lot Sq. Ptg.
% of Lct Couenage_
# of Stories
Total Height
?opogrcpby
Euilding PerwLt
State
Iotal Clnraes
TotaL
Building Volue & Permit
Crt
LOT ?WE
_ Iirtericr
Bedroons
Sources
Co"ner
Panhan.dle
Cul-de-sac
Fi
*
This pentn t is granted on the erpress cond.ition tha.t the satd eonstruction
sLaLL-, in all rbspects, confomn to the Cr&i.rwnce adopted 6y the City of
Springfield, incl,uding the Zoning CYdinance, r,egalating the ecnstructicn
qnl. use of buildin4s, and mey be suspended or reuokeC at cnA tine upon oic-
T,ation of anA prcoisions of said Ordir,ances.
Electricol Permit
Whet,e State La,t requiree th,at the electtical uork be done by an Eleetrical
Contraetor, the electrtcal portion of this permit shall not be oaliC unti.1.
the Label lne beett aig:ned by the EleetrLcal Contractor.
r:i'
D^^^
{-/B:?a
Dofe
I HAW CAREFULLy EXLUINED the eontpleted appli-cation for pennit, and do
hereby certify that aLL inforrnation hereon ie true and, corz,ect, cnd. f
further eertify that any ard aLL uork perfor.ned sVnLL be done in aecor-
dance rvLth the Ordinanees of the City of Spz.ingfield, and. the Laa of the* State of Aregcn pertaining to the wtk Cescribed hetein, end. tlu.t NO OCCU-
PANCY till be nad.e of any stz,ucture uithout permission of the Bui.T.ding DL-uision. I futthen eertifg that only eontractors and enplcyees uho are in
eanpliance dith ORS 701.055 uiLL be used on this project
Lat Faces -
Setbacks
Df House Caraqe Access
llot'th
South
llest
ITE14 x Value
Win
Gsace 612 //./o
Caroort
Accessorz,l
?az-1TOTAL VALUE
S.D.C. 1.5 x
,f,o
lc"in p"+a' ,-5.S/T"V( 1.4,os I
#:
=Signed
Plumbing Perrnit
No pe"eon slnlL construct, install., alter ot ehnnge atq ne?, cr etisting
plwnbing or'drainage sUstq-n in uhole or in patt, unless such person is the
Legal possessor of a oalid plwnber's License, eseept tlwt a pe"son nay do
plunbing uork to p"operty uhich is ooned, Leased or opetated bg the 6ppli-
efrrlt.
NO.FEE CHARGEITEM
Ei.stures
Residmtia.L (1 bath)
Seuer
Plunbing Perrrit
State
ITEI,l NO.FEE 7U A D^D
Res. So. ftq
Na,t/Ertend Ciraits 2.as t,*l 2-?-se
Ianpcrey Setoice
il 3?-ro
State
TotaL
FEE C!IARCE Mechqnicql Permit
bhanst Hood.
Hcodstote
Vent Pan
Petmtt fssuotce
MechaniceL Pervrit
-- ETICRCACHMENT --
Sec,tftty Deposit
Stgtage
l&aintenance
Permit
C'utbcu!
Sida,taLk
!enee
Electrical Label
Mobt|e Hone
'TCTAL AI4OUilT DUE:*/a/,?a
P1-an che,ek Fec: P SZ , q Z
*
Hate-t
?ctal Chanaes
.. RESIE NTIAL..
APPLICAT ION /PERIIIT
225 Noy,th Sth Street
Springfield, )regon 97477
Building Diuision
7 26-37 53
Reee"j,#
SPFIINGFIEI.D-.
General
Plumb
I,lechanic
It ia the responsibility of petnit to aee tlnt aLL inspections are nade at the
l,ocated, at the frctt of tlte orooeyht.
on tle Bunlding Site -at aLL' tlmes."
fnoot the LA
PR)CEDUPE= Fo4 IySPECTI1N .4_E)7ES?;CALL 726-3769 (recorder) state your Citg Cesigrated job
tequested and uhen gou uiLL be ready fo_t, inspection, Contraetors oi oumers ncme Lnd plnne'*iLL be nade the aane day, r'equests nad.e aftet, 7:00 on trLLL be nade the nest wtkiS day.
*Suildirq sVnLL remain
LF-
%0s80
Date:
res
prope? tine, that eceh addzees is readabie
, nlonbet,, iob alitess, type of inspec=i.cn
numbet. Requests receixed befcre 7:00 o-:t
Iour City Desigr,ated Job Number Is:
Job Locaticn:
Assessore Map #?c,,r Lot #
Subdiuision:
A,mer
Phone
City:zip:-1
Describe Wotk:
Additicnt-_l Sr-fo
t-t RemoCeL
0Date of AppL icaticn val-ue n cl
ra
Electr{
^\,51rP eryef,t;rz-11 Electr c lan
Page 1 of 2
ercantation, but pr"tor tc set up of
forms.
ANDERSLAB PLUMBING. ELECTRICAL &
l,ECHAilfCAL: Io be made before any
wtk i,s cooeted,
PA)TING & F)UNDATICN: To be rm.Ce;fi;; trenades a"e e&cauated and.
fornts ate ereeted, but pz,iot, to
pouz-Lng ccncrete.
UND1RGROUIID PLUMBING, SIWR, WA?ER,
DRAfilAcE: To be made pt"Lot to fil-Lir4 trenehee.
T]IIDERFLOOR PLUI,EING & MECHANTCAL :
oy
floor insul,ation or decking.
P1S? AND BEA!4: To be made prtor toTiitilTilGTof floor it*uLation or
decking.
these been
made and approted..
QTryT TIIQDD'frTAAI,To be nade after INSULA?IAN/VAPOR BARRTER IT\SPECTTON,
Io be made after aLL insulcticn a,-d.
required uapot bwz,ieys @e in place
Lat before ory Lath, gypswn baorC or
tnLL coueting is appLied, and beforeag insulation is concealed.
DRYWALL INSPEC?I)N: Tc be nade
aftez, aLL d.r'guall is in pl.ace,
but prior to any taping.
MASONRL Steel Location, bond
beons, gvoutirtg ot oertieals in
aecordorce Dith U.B.C. Section
24L5.
V00DST0'/E: After instalT.ation ie
anpLeted.
CURE ! 4PP8C4!H 4?.".9N: After fonnsee e?e.tAE ido" to pout"tng
concrete.
SID4WALK & DRf',EWAI: Poz, aLL eon-
creteia1rfu ;itiin street night-
of-tnA, to be made after aLL etea-
oating canplete & forn wrk & sub-
fuse materLal in place.
Sanitary seuer eapped et pt,operfi1 Lire
Septic tank punped and filled ttth gra;sel
Final - l,lhen abcue itens are eanpleted
and uhen Cenolition is eotnplete o? sttue-
tut,e noued and. g,arrtaes cleaneC up.
Le Hcmes
Bloeking otd Set-up
Plwnbing connectians -- aaie? otd. uater
Electrical Cc,nnection - Bloeking, set-up
and plunbing eonneetions m;st be apprct;ed
before request"Jng eleclrical inspeclion
Acceasory BuilCnng
Pinal - After pctckes, skirting, decks,
etc. ate eompleled.FTP.EPLACE:
tnat;nm;
tion.
FTNAL PLUMBIIIG
PINAL I4ECHAIIICAL
Pt Lor to placirq
and befot e froning
facing
i.nspee-
FRA-\.[NC: Wst be requested after
approual of rough plutrbing, eLectri-cal & meclwnical. AL! roofing
bracirq & chinrneys, ete. rrust be
eornpleted. Ito ucrk is to be con-
, eecled until this inspeetion has'been made anC appro"^ed.
ALL project eondt)tions, such as the "i.nstallation of street trees, conpletLon of the
required Land.secpir-9, etc., mtst be satisfied befote the BUILDTN? FfllAL ean be requested.
FINAL BUILDIN7: The Final Buildittg Inspection rmtet be requested after the Firnl Plwnbing
\_-/ Electrical, otd Mecharical fnspections have been nade atd approred.
Ff D^frofn^ ttuLv t ir! vhL
*ALL IIANHCLES AND CLEAN)UTS MUST BE ACCESSTBLE, ADJUSTIIENI TO BE !.|ADE !.! ilO CCST TC CI?y
tha.t
YENCE: h*ten complete -- ProuiCe
gatee or notsable sectians through nP.u.E. I I
I
Addtess:
JOB NO.
?otaL
SOLAR ACCESS REQ.-L-co c
BeCroons
Lot Faees -
l'La77
f EAW CAREFULLY EXLUINED the completed application for pernit, and do
hereby eertifg that aLL infotmation hereoi is ttae and. eorrect, cruC f
furtker'-certify that any arl aLL aork perfor"ned slnll be dote in accot-
dance vtth the Ordinane-es of the city of -Springfield, ard tha Las of the
State of 1r'egcn pertaintng to the uork Cescribed henein, end tlnt N0 OCCU-
P/.NCy utLL be rm.Ce of any stractu"e uithout pemission of the Suilding N-oision. I furthen eertify that otly eontz,aclors ard enplcyees uho arb incotpliance ui.th cRS 701.7ss uiLL be used on thie ptojeet
% cf Lct Ccuerage_
# of Stortes
LCT TWE
_ fntericn
_ Corner
Total lleight
Lot Sq. Ftg.
Iopography
PanhanLle
CuL-de-sac
DT House Access
-- Fees --
Ihis pentnt is granted on the etp?ess. eoltdition that the said-constzwction
slwll, in all respects, conforrn to the Crdirnnce adopted dy the City of
Springfield, inctuding the Zoning Crdinance, r'egulating the ccnstraettcn
utd use of buildings, otd may be suspend.ed or reuokeC at cny time upon oic-
Taiion of any prczsiaions of said 0t,dir,ances.
Value
?OTAL VALUE
F?G x Building Volue & Permit
s,D.c. L.5 c
ITEM
Main
Building Permit
?otal Charges
State Date Pa"Jd
Si.gned
Receipt #:
Plumbing Perrnit
No pereon slnll construct, instal!., altet' ot clunge dnA neu cz, eristing
plutrbirq or dtainage susts'n in uhole or in part, unless sueh person is the
Legal possessor of a oalid plumbezt's License, ercept that a pe?son mag do
plutnbing uork to propenty uhich is ourned, Leased on operated by the dppli-
cant.
NO.Dtl
*
Eistut es
Resil.enti.al (1 bath)
Sani Seuer
Plutnbing Pernit
State Sut,eh,ange
Electricql Permit
llhet,e State La requiz,es tlnt the eleetrical uork be done by an Electrieal
Contractor, the electrical porti.on of this permit sha.LL not be oaliC untdl
the Label lns been signed by the Eleetu'ical Conttactoz,.
o
IotaL
Na,t/Eatend. Circuits
Setoiee
rTEM FEE
*
Mecho nicol Permit
fu|mnst HooC
ilcodstooe
Vent Eol
PermLt fssuanee
Mec?wnical Pentrtt
-- ENCROACHMENT -.
SecarLtu Deposit
Stot,age
Maintenantce
Permit
Cutbcut
lence
Electz,ieal Label
Mobile Hone
TOTAL AIilOUNT DUE:*3q3 Signed Date
rTEM
llatet
?otal Clnrqes
SLdAnaLk
*