Loading...
HomeMy WebLinkAboutPermit Building 2004-04-14Building/Combination Permit Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-7 26-37 69 Inspection Line PERMIT NO: COM2004-00424ISSUED: 0411412004 APPLIEDT 0411412004EXPIREST 1011412004VALUE: $ 500.00 SITE ADDRESS: 568 S 5TH ST ASSESSOR'SPARCELNO.: 1703353405200 PROJECT DESCRIPTION: Install skylights Owner: WENDy SAMpSON Address: 568 S sTH ST SPRINGFIELD OR 97477 Springfield TYPE OF WORK: Single Family Residence TYPE OF USE: New Residential PhoneNumber: 541-746-6778 License Expiration Date PhoneContractor Type General Contractor OWI\ER CONTRACTOR INFORMATION )RMATION # of Units: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: SETBACKS Frontyard Setback: Side I Setback: Side 2 Setback: Rearyard Solar Street Storm Sewer Special Instruction: Notes: # of Stories: Height of Structure Type of Heat: Water Type: Range Type: Energy Path: Dist: Trees Rqd: Drive Rqd: Yo ofLot Coverage: $ Per Sq Ft Square Footage or multiplier or Bid Amount $1.00 500.00 Total Value of Project Pase I of2 Lot Size: Sq Ft lst Floor: Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport Sq Ft Other: Impervious Surface Area: R-3 YN {s' .o Type of Construction Use Bid Amount REQUIRED PARICNG Total: Handicapped: Compact: Hm$t},t$,lbffiiiffi,ffit"' Description Bid Amount Value $500.00 $500.00 Date Calculated 04fi4t2004 PUBLIC IMPROVEMENTS - Valuation Description I Building/C ombination Permit Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676Fax 541 -7 26-37 69 Inspection Line PERMIT NO: COM2004-00424ISSUED: 0411412004APPLIED: 0411412004EXPIRES: 1011412004VALUE: $ 500.00 f,'ees Paid Fee Description + l0o Administrative Fee + 77o State Surcharge Building Permit Total Amount Paid Amount Paid $4.50 $3.15 $45.00 $s2.6s Date Paid 4n4t04 4n4t04 4n4to4 Receipt Number 1200400000000000482 1200400000000000482 1200400000000000482 Plan Reviews To Request an inspection call the24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. 1 Framing Inspection: Prior to cover and after all rough in inspections have been approved. 2 Ceiling Insulation: Prior to cover. 3 Drywall: Prior to taping. red Insnections By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that onty contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during q.a Owner or Contractors Signature Date PaseZ of? Construction Contractors Board Permit*:C0uvtzoo . - OOUZT 700 Summer St IrtE Suite 300 PO Box 14140 Salem OR 97309-5052 Phone: 503-3784621 WebAddress:ryfu1!4[e.or.ug 568 5 s+L rAddress Issued by:\(Date:4-r 4-oV Statement: lnformation Notice to Property Owners About Construction Responsibilities Note: Oregon Law, ORS 701.055(4) requires residential construction permit applicants who are not licensed with the Construction Contractors Board to sign thefollowing statement before a building permit can be issued. Ihis statement is requiredfor residential building, electrical, mechanical and plumbing permits. Licensed architect and engineer applicants, exemptfrom licensing under ORS 701.010(7), need not submit this statement. This statement will befiled with the permit. Fill in the appropriate blanks and initial boxes I and2, and either box 3.A. or 38: ia r. ,,,R 2. I own, reside in, or will reside in the completed structure. I understand that I must become licensed as a construction contractor if the strucfure is sold or offered for sale before or on completion. 3A. My general contractor is (Name)(ccB #) I will instruct my general contactor that all subcontractors who work on the structure must be licensed with the Construction Contractors Board. OR 38. I will be my own general conhactor. If I hire subcontractors, I will hire only subcontractors licensed wittr the Construction Contractors Board. If I change my mind and hire a general contractor, I will contract with a contactor who is licensed with the CCB and will immediately notiff the office issuing this building permit of the name of the contractor. I hereby certify that above information is correct and that I have read and do understand the Information Notice to about Construction Responsibilities on the reverse side of this form. /4 o of applicant)(Date) (White copy to issuing agency perunilfile, pink copy to applicant.) Property_owner.doc 03/1 1/03 Acting as Your Own General Contractor? INFORMATION NOTICE TO PROPERTY OWNERS ABOUT CONSTRUCTION RESPONSIBILITIES NOIE: This lnformatian Notice to Propefty Owrers about Construcfion Responsrbi/ltr'es was develaped by the Construction Contractors Board in accardance with ARS 7A1.A55(5J, passed bythe 19Bg Oragan Legislature. If you are acting as your own contractor to construct a new home m make a substantial improvement to an existing structure, you can prevent many problems by being aware of the following responsibiiities and concerns. Employer Responsibilities You will, in most instances, be ruled to be an "employer" and the contractors you contract with will be "ernployees" if you use contractors not licensed with the Construction Contractors Board to do labor in constructing or to assist in the construction or irnprovement of a residential $tructure. As the employer, you must comply with the fotlowing: ()regon's Withholding Tax Law: As an employer, you must withhold income taxes from employee wages at the time employees are paid. You will be liable for the tax payments even if you don't actually withhold the tax &om your employees. For a State Business ID number, call the Business Informatipn Center at 503-985-2200. Unemployment Insurance Tax: As an employer, you are required to pay a tax for rmemployment insurance purpop6,. on the wages of all employees. For more information, call the Oregon Ernployment Departmentat 503-947-1488. -{- Workers' Compensation fnsurance: As an employer, you are subject to the Oregon Workers' Compensation Law, and must obtain workors' compensation insurance for your employees. If you fail to obtain workers' compensation insurance, you could be subject to penalties and be liable for all claim costs if one of your employees is injured on thejob. For more information, call the Workers' Compensation Division at the Department af Consumer and Business Services at 503-947-78i 5. U.S' Internal Revenue Service: As an employer, you mllst withhold federal income tax from employees' wages. You rvill be liable for the tax payment even if you didn't actually withhold the tax. For a Federal EIN number, call the IRS at 866-816-2065 or fax them at 801-620-7115 Other Responsibilities and Areas of Concerns Code Compliance: As the permit holder for this project, you are responsible for resolving any failure to meet code requirements that may be brought to your attention through inspections. Liability and Property Damage fnsurance: Contact your insurance agent to see if you have adequate insurance coverage for accidents and omissicns such as falling tools, paint over spray, wats damage &om pipe punctures, frre or work that must be redone. Time: Make sure you have sufficient time to supervise your employees. Expertise: Make sure you have the skills to act as your own general conffactor, to coordinate the work of rough-in and finish trades, and to notifu building officials as the appropriate times so they can itrform the required inspections. If you have additional questions call the Construction Contractors Board (503-3?8-4621) or write the agency at pO Box 14140, Salem, OR 97309-5052. Property_owner.doc 03ll I 103 225 Fifth Street Springfield, Oregon 97 477 547-726-3759 Phone 'ity of Springfield Official Receipt evelopment Services Department Public \ilorks Department RECEIPT #: 1200400000000000482 Date: 0411412004 2234:24PtYt Job/Journal Number coM2004-00424 coM2004-00424 coM2004-00424 Description + 1Yo State Surcharge + l0% Administrative Fee Building Permit Amount Due 3. l5 4.50 45.00 Item Total:$s2.6s Payments: Type of Payment Paid By Checl(Number Authorization Received By Batch Number Number How Received Amount Paid Check WENDY SAMPSON djb 573 In Person $52.65 Payment Total : -552 "6-f 411412004 Page I of I IH'FII} Deveropmen, . "1HT:JH:11community S ervices Division;u:i*B ilfg 541-726-3676Fax April20,2005 WENDY SAMPSON 568 S 5TH ST SPRINGFIELD, OR 97477 Date Permit Issued:411412004 PermitNumber:coM2004-00424 Location:568 S 5TH ST Project Description:Install skylights Dear Permit Holder: Recently, our office sent you a letter notifuing you that your permit(s) was about to expire. Because you did not contact us to request an inspection or to call us to veriff that progress has continued to be made on the project, your permit(s) has expired. This letter is a reminder that the above referenced permit(s) expired on 411412005. Please contact our office at Springfield CityHall,225Fifth Street, Springfield, Oregonbetween 8:00 a.m. andnoon orbetween 1:00 p.m. and 3:00 p.m. Monday through Friday, excluding holidays prior to continuing work on your project. There are additional permit fees that are due in order to complete your project. Sincerely, \rsu-, Lisa Hopper Building Safety Supervisor rsrrE*.flaFt51,tr City of Springfield 225 Fifth Street, Springfield, Ox_97477 ' 541-726-3759 Phone 541-:126-3676Fax March 16,2005 SAMPSON 568 S 5TH ST SPRINGFIELD Job Number: Location: WENDY oR 97477 coM2004-00424 568 S 5TH ST Project:Install skylights Dear Permit Holder: The Springfield Building Safety Code Administrative Code provides that in order for a permit to remain valid, the work which has been authorized by the permit must begin within t 80 days of the date of issuance, and an inspection must be requested at least every 180 days. According to our records, you obtained a permit for a project at 568 S 5TH ST which is set to expire on 411412005. Our records indicate that you have not requested an inspection within the past five (5) months. This letter is written to notiff you that your permit(s) will be expiring shortly. If you are ready to request an inspection for your project, please phone the inspection line at 541-726-3769. If you do not request an inspection prior to the expiration date, your permit(s) will expire and additional permit fees will be required in order to complete your project. If you have any questions, please feel free to phone me at 541-726-3790. Sincerely, Lisa Hopper Building S afety Supervisor I SPHIT*GF!EE.$ D EV EI-O P {* EI/T SEffi T/,CES fr E F4ARTILIENT May 14,2004 WendyL. Sampson 568 South 5th Street Springfield,OR 97477 RE: Composting Toilet Permit Request Dear Ms. Sampson, I have reviewed all your submitted information regarding the composting toilet and contacted the State Building Codes Division Plumbing Section regarding your proposal. Your request for the installation of a composting toilet in your residence cannot be approved for the following reasons: The Springfietd City Code, Section 3.350 requires a person erecting or maintaining a water closet, sink, bathtub, or drain in the city upon property within 300 feet of any public sanitary sewer shall connect the facility with the sewer at his own expense, in the manner and under regulations and supervision prescribed by the city. Also, Springfield City Code, Section 4.302 except as section 4.308 provides to the contrary, it shall be unlawful to install a septic tank or other private sewage disposal system within the city after the effective date of this code. (Recodified in November t997) Section 4.306 of the Springfield City Code states Except as Section 4.308 provides to the contrary, no person shall use or allow on premises under his control any privy other than a temporary one that is necessary for a construction project and is consffucted and maintained in accordance with standards of the Deparfrnent of Environmental Quality. I am attaching a copy of the above mentioned City Code Sections for your reference and information. Also, after speaking with the State Building Codes Division, it is their understanding that once a composting toilet is installed, a periodic inspection of the unit is required by either the State Plumbing lrspector or by the local jurisdiction where it is installed. The State inspector said they do not have the staff to perform periodic inspections of these units within local jwisdictions, only in rural areas. For the City to provide periodic inspection 225 FIFTH STNEET SPRINGFIELD, OR 97477 (541 ) 726-3753 FAX (541) 726-s689 www. ci. s ari n gf i eld. a r. u s 568 South 5s Street May 14,2004 Page2. services, an ongoing inspection fee would be required. The City's standard per hour inspection fee is $45.00. A minimum of trvo inspections per year would be required. If you have any questions or concerns, please call me 726-3665. Sincerely, Graham Plumbing Inspector attachments 3.304 Repair-Duty of City Council. The council, acting through the city manag- er, shall maintain in a state of good repair all sidewalks within the city, hfter the manager is notified of any repair needed upon an existing sidewalk in the city. The city manager shall not be deemed to have notice of a sidewalk needing repair until the needed repair has been made known to the manager in writing. 3.306 Repair-Duties and Liabilities of Property Owners. It shall be the duty of all property owners, including record own- ers and contract purchasers, or both, to keep all sidewalks in front of and abutting and ad- joining their property clean and in good repair. All property owners shall be required to keep the sidewalks abutting upon their property free and clear of any defects, obstructions, and hazardous materials. Failing in such duty, they shall be liable to any person injured thereby. 3.308 Repair-Notice to Owner of Abutting Property. Whenever the city manager has cognizance of any required sidewalk re- pair, he shall thereupon give notice in writing to the record owner of the real property adja- cent and abutting upon the sidewalk that re- quires repair, and a copy of such notice shall be sent by regular mail to the occupant of the premises located upon such property, if there be any, advising that the sidewalk must be repaired to the satisfaction of the public works director within l0 days from the date of the notice or within such additional time as the public works director specifies, and that if the property owner fails to repair such property within tan days, immediately following the notice aforernentioned, then the city manager shall cause the sidewalk to be repaired forth- with. 3.310 Repair-Collection of Costs. Each lot or part thereof or parcel of land sha[ be liable for the full cost of repair or recon- stnrction of any sidewalk in front of and abut- ting upon it. - Upon the completion of any sidewalk repair or reconstruction by the city as provided herein the city mimager shall present the billing therefore to the city councit ana the city council shall, by ordinance, assess upon each lot or parcel of land liable thercfore its appropriate share of such cost and direct that such assessment be entered as a lien on the docket of city liens in the manner provided by law. If the assessment is not paid within 30 days after notice thereof, which notice shall be made by the city finance director by regular mail to the same person or persons who were originally notified for the defective sidewalk, the council may proceed to levy upon such [ots or parts or parcel thereof liable for zuch as- sesiment, and cause the lien'thereof to be satisficd by execution ind sale in the manner provided by the charter and ordinances of the city, or by statute of the state for the collection of delinquent assessments for the improveruent of streets. SAI\ITARY SEWER^S 3.350 Sewer Connections. A person erecting or maintaining a water closet, sinh bathtub, or drain in the city upon property within 300 feet of any public sanitary sewer shall corurect the facility with the sewer at his own expense, in the manner and under rcgula- tions and supervision prescribed by the city. 3.352 Sewer Connections-Permits. No unauthorized person shall uncover, make any connection with, ope,n into, use, alter, or disturb any sanitary sewer without first obtaining a written permit from the city to do so. Springfield Code 3:17 city and for regional sewerage service. Provided, that from revenues derived from any increases in sewer user charge rates imposed after November 3, 1980, payment may be made for system extensions. Nothing herein shall prevent the accumulation of funds for operation, maintenance, or exten- sions if appropriate, in order to fund such activities which may require gre- ater resources than may be accumulated from revenues in said fund for such purposes, in any one year. (b) Payment thereafter of the principal and interest on the Sewage Collection and Treatment Facilitics Bonds issued by the city pursuant to authority therefore given by the elec- tors of the city at the election held on February 7, 1961.(c) [t is declared to be the purpose and intent of this section that the sewer charges called for in sections 4.002 to 4.094 shall be used and dis- bursed periodically as necessary for the purposes set forth herein and no other. 4.224 Sewer Charges-Liabilities. The lia- bility of any person for unpaid sewer fees charged to him under code or ordinance provisions of the city that have subsequently been repealed shall not be affected by the repeal of the provisions, nor shall the irrevo- cable pledge of net revenues for the previously issued sewage disposal plant and trunk sewer bonds be affected by the repeal. The liability shall continue as if the provisions had not been repealed. SEPTIC TANKS AND PRIVIES Springfield Code 4.300 Sewer Connections. Except as section 4.308 provides to the contrary, no building permit shall be issued by thc city after the effective date of this code unless the plans and specifications for such building, in the event that sewerage facilities are provided in it, provide that the same be connected to the public sewerage system of the city as required by section 3.350 of this code. 4.302 Septic Tanks-New. Except as section 4.308 provides to the contrary, it shall be unlawful to install a septic tank or other private sewage disposal'system within the city after the effective date of this code. 4.304 Septic Tanks-Existing. Exccpt as sections 4.306 to 4.308 provide to the contrary: (1) Where a public sanitary sewer is not available for a building and the sewer outlet for the building is connected to a septic tank at the time this code takes effect, the connection may be maintained and the septic tank may continue to serye the buildingl and (2) Nothing in this article shall apply to septic tanks or private sewage disposal systems in use at the time this code takes effect, except that the surme may not be replaced, and if the need therefor arisis, then theieplacement shall be by connection to the public sewerage sys- tem of the city. 4.306 Privies. Except as section 4.308 pro- vides to the c6ntrary, no person shall use or allow on premises under his control any prily other than a temporary onc that is ncccs- iaryfor a consEnrction project and is conshrct- ed'and maintained in'accordance with stan' dards of the Departrnent of Environmental Quality. ffi 4:27 Composting Toilet Rules 918-770-0080 Construction and Installation of Composting Toilets (1) Defrnition: "Compost toilet" means a permanent toilet receptacle used to receive and store human wastes, toilet paper, biodegradable domestic garbage, and other vegetative matter for the purpose of aerobic decomposition of materials received therein. (2) Product and Design Approval: (a) Before a manufactured or individually designed compost toilet is installed, approval must be obtained from the division with concurrence of the boardby an approved certifier to the approved standards in OAR 918-770-0050 to 918-770-0320; (b) Criteria used to evaluate the units includes, but is not limited to: (A) NSF Standard 41 (May 1983 revised); or @) Composting toilets listed byNSF Intemational to NSF Standard 41 (May 1983 revised) are approved. (3) Site Locations: Residential compost toilet installations shall be limited to areas where a grey water disposal system approved by the Department of Environmental Quality can be installed and used; or such grey water is discharged into a public sewage system. (4) Installation: (a) Prior to commencement of the installation of a composting toilet, a plumbing permit must be obtained from the authority having jurisdiction. A permit will be granted upon showing: (A) The site location is in accordance with these rules; and (B) The manufactured composting toilet or individual design has been approved by the division or listed with NSF International to Standard 4l (May 1983 revised). (b) Compost toilets shall be designed to provide a solid connection to the floor with corrosive-resi stant fasteners : (A) All suspended under-floor components shall be supported with non-corrosive hangers adequately designed to support the weight of the system. Hangers shall meet the approval of the authority having jurisdiction; (B) All under-floor components designed to set on a stable surface shall have footings adequately designed to support the weight of the system. (c) Vent pipes shall be sealed at all joints and insulated in a way to minimize condensation. The vent stack shall be insulated in a way to minimize condensation. The vent stack shall extend from each chamber or seat box to a point at least two feet above the highest elevation of any portion of the building within ten feet of the vent. Each vent shall be flashed and shall terminate not less than ten feet from or at least three feet above any window, door, opening, air intake, or vent shaft; nor less than three feet in every direction from any lot line, alleys and streets excepted; (d) All compost toilets shall be installed in an insulated area, or the chamber shall be insulated to maintain a proper temperature inside the chamber to keep a biological balance of the materials therein; (e) Where a compost toilet is installed in an existing dwelling, piping, fixhres or equipment shall be located to not interfere with normal use or normal operation and use of windows, doors, or other required facilities. (5) Inspections: (a) A11 installations shall be installed in a workmanship like manner and shall not be put into use until inspected and approved by the authority having jurisdiction; (b) Either the authority having jurisdiction or the division may conduct periodic inspections of any compost toilet in accordance with ORS 447.124. (6) Maintenance: (a) Humus from composting toilets may be used around ornamental shrubs, flowers, trees, or fruit trees and shall be buried under at least twelve inches of soil cover. Deposit of humus from any compost toilet around any edible vegetable or vegetation shall be prohibited; (b) The compost toilet system of any premises under the jurisdiction of the authority having jurisdiction shall be maintained in a sanitary and safe operation condition by the owner or by his agent. Whenever compliance with all of the provisions of these rules fails to eliminate or alleviate a nuisance or any dangerous or insanitary condition which may involve health hazards or safety hazards, the owner or the owner's agent shall install such additional plumbing and drainage facilities or shall make such repairs or alterations or removals as may be ordered by the authority having jwisdiction. [Publications: The publication(s) referenced in this rule are available from the agency.] Stat. Auth.: ORS 447.118 Stats. Implemented: ORS 447.118 Hist.: DC 12-1978, f. 4-5-78, ef. 4-15-78;DC 4-1979, f. l-24'79, ef. 1-25-79;DC 7- 1979,f.3-26-79,ef.4-l-79;DC 13-1981, f. 10-30-81, ef. 11-1-81;DC 1-1983, f. & ef. 1- 3-83; Renumbered from 814-021-0900; BCD 6-1998, f.3-2-98, cert. ef. 4-1-98, Renumbered from 918-790-0010;BCD 22-2000, f. 9-19-00, cert. ef. 10-1-00 a