Loading...
HomeMy WebLinkAboutPermit Plumbing 1996-12-23CO M M ERCIAL/ IN D UST RIAL PERMIT APPLICATION 225 Fitth Street, Springf ield, Oregon 97477 SPRINGFIELO %, LOCATION OF PROPOSE 1ASSESSORS MAP:TAX LOT: C OWNER:PHON E: I ADDRESS: OPCITY;STATE ztP DESCRIPTION OF RK NEW - REMODEL ADDITIO ICRD \J,)aQe, )--DEMOLISH OTHER VALUE NAME ADDRESS PHON E ARCHITECT: CONTRACTOR'S NAME ADDRESS CONST. CONTRACTOR ,EXPI RES PHONE GENERAL: PLUI'/BI MECHANICAL: ELECTRICAL: PLUMBING NO.FEE CHARG E Single Fixture Relocated Bldg (new f ix. addtl) Water Service fr Sanitary Sewer ft Storm Sewer fr Backflow Device TOTAL PERMIT M EC HA N ICAL NO trFtr CHA RG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap, cooler Vent Fan/Single duct Vent f rom Systern apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _HANDICAP ACCESS QUAD AREA: r OF BLDGS: LAND USE FLOOD PLAIN ZONING OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER: SO. FT.$/SQ. FT.VALUE SQ. FIG MAIN SQ. FTG ACCESS SQ. FTG OTHER x X TOTAL VALUE OF PROJECT PLAN CHECK FEE DATE BYRCPT# TOTAL PERMIT FEES EXCLUDING ELECTRICAL BUILDING PEBMIT PLUMBI NG /r .qq D EMO LITION 5% State Su rcharoe 5% State Su rcharge f.I MECHANICAL FENCE VALUE $ 5% State Su rcharqe SIDEWALK FT SUBTOTAL PEBM ITS PAVING CURBCUT FT. SYSTEMS D EVELO PM ENT JoB NUMBE- q \0\1D4 INSPECTION LINE: 726-3769 OFFICE: 726-3759 K: * OF UNITS: REQUIRED TNSPECTIONS V It is the responsibility of the permit holder to see that all inspections are made at the proper tirne. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravet is in made after excavation, but ELECTRICAL & place but priorlo placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC;AL INSpECTIONS: In accordance ELECTRICAL & and approved. Section 306 of the State Specialty CodeMECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & 5y the owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, all steet in ptace, but framing inspection srRUcruRAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (3OO a.1) coNcRETE SLAB: To be the roof' all framing, fire made arter ail insrab buirding 3l::5 3:.':fi 3i3:::t";,';;:r" BII:,.T"'f3l *YstT',rrr, ,,service equipment, conduit, and vents are complete andpiping, accessories and otheranciriry equipment items are :i..,;::ljiigi:,i, jJ;[3::: 3l?,xrTi:]*.T,|.BffI1Hx".in place but before any tightening operations. (306concrete is placed. INSULATTON & VAPOR a6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyEO ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall Covering isprior to covering or filling applied.trenches. evH,,vv. spEctAL GRADING, ,NDERFL..R: p,umbins [l?5,S",:'f;iA'J3[,Y]"' il:iIt'i[il.,1[',5Jh'i],"1 electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certif icate by an approved lathing and gypsum board, agency, furnished to the City's POST & BEAM: To be made interior and exterior, is in Building Division before prior to instattation of floor place but before any !9qT" are placed' (2501 U.Bc. insulation, decking or f loor plastering is applied or before STDS' 25'10,11)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 24'15. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. flnished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND ,APPROACH APRONS: After forms are erected but prior to placing concrete. .ln addition to the inspec. tions specified, the Buildlng Official may make or require other inspections of any construction work to ensure compliance with the Building, Clty or Development Code. a.7') By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certify that any and all work performed shall be dorre in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. tions are requested at the proper time, that project address is readable from the nt of the property, and the approved set of plans will remain on the site at all Si gnatu Date I further agree to ensure that all required inspe street, that the permit is located at the f times during constru on VALI DAT ON AMOUNT RECEIVED: RECEIPT #:RECEIVED BY: DATE PAID FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot stri pi ng, etc. must be completed beforerequesting this inspection. FINAL BUILDING: Requested af ter the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE