HomeMy WebLinkAboutPermit Building 1997-07-10CO M M ERCIAL/ IN DUSTRIAL
PERMIT APPLICATION
225 Fillh Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:
ASSESSORS MAP;
J.p4 ,s.,C.
INSPECTION LINE: 726-3769
OFFICE: 726-3759
SP;IINGFIELO
PHONE:
STATE:ztP
L e
rh y'e
>2
- -r?yv)yOWNER
ADDRESS
CITY:
VALUEEJY-iuADDITION DEMOLISH OTHER
DESCRIPTION OF WORK:
NEW
-
REMOD
NAME ADDRESS PHONE
ADDRESS EXPI RES PHON Ert o,ax?oLO@ //eR
CONTRACTOR'S NAME
ARCHITECT:
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #
G EN ERAL:
PLUMBING
PLU MBING
NO.FEE CHARGF
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backf low Device
TOTAL PERMIT
MECHANICAL
NO FFF aHA eGtr
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cool er
Vent FaniSingle
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE _
LAN
FO
tS NoT LTGHrtNG PowER BUDGET:
R WAIER HEATEB:--
FLOOD PLAIN
woRK zoNlNG
OCCY GROUP:
* OF STORIES:
QUAD ABEA:
g OF BLDGS:
HANDICAP ACCESS:
SQ. FT.VALUEANY 18ooau.BEBlou
TOTAL VALUE OF PROJ
x
x
x
SQ, FTG MAIN
SQ, FTG ACCESS
SO. FTG OTHER
,//n.Lf RCPT#DATEPLAN CHECK FEE BY
g /,o J-
BUILDING PERMIT zs4 PLUMBING DEMOLITION
5% State
Su rcharq e
/ Lttr?f 5% State
Surcharoe ilEztd-32 8o
MECHANICAL FENCE
VALUE $
(
5% State
Surcharoe
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
JoB NUMBE " 77lr /z-
rAX Lor: O L7 O-O
ro,?zr
ECTR
REQUIRED INSPECTIONS
It is the responslblllty of the permlt holderto see that all lnspections are made at the proper time. To request an lnspectlon, call
Z26.9Z69 (recorder), state your Clty designated job number, lob address, type of inspection requested and when you will be ready
for lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wlll be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
BING,PAVING: Atter gravel is in
No work is to
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Bullding Division.
STRUCTURAL CONCRETE: ln
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob. (2722 f)
HIGH STRENGTH BOUTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnlshed to the City's
Bullding Divlsion before
beams are placed. (2501 U.BC.
STDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
place but prior to placing
asphalt or concrete.
be covered until these
inspections have been made SpECIAL INSpECTIONS: ln accordance
and approved. Section 306 of the State Specialty Code
MECHANICAL: To be made
before any work is covered. ATTIC DRAFT STOPS &
CURTAIN WALLS
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all lnslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
ln place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage llnes. To be made
prior to covering or filling
trenches.
UNDERFLOOR: PIumbing,
electrical, mechanlcal. To be
made prior to installation of
floor insulatlon, decklng or
floor sheathlng.
POST & BEAM: To be made
prlor to lnstallatlon of floor
insulatlon, decklng or floor
sheathlng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prlor to lnstallation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams groutlng or
verticals ln accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prlor to installing
any roof covering.
FIREPLACE: Prior to placing
facing materials and before
framing lnspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chlmneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
F]RE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
Iathing and gypsum board,
interlor and exterior, is in
place but before any
plasterlng ls applled or before
gypsum board Jolnts and
fasteners are taped and
f inlshed.
#
SIDEWALK & DR]VEWAY:
Requlred for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
'ln addition to the inspec-
tlons speclfied, the Building
Official may make or require
other inspections of any
constructlon work to ensure
compliance with the Building,
Clty or Development Code.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUpANCy
lng Safety Divlsion. I further certify that only contractors and employees
this project.
requested at the proper time, that proiect address ls readable from the
e property, and the approved set of plans will remaln on the site at all
2'- /O -"7Signatu re
at I
Date
will be made of any structure without permission of the Bulld
who are in compliance with 701 us
I further agree to ens
street, that the pe
times during co
VALIDATION
RECEIPT *:BECEIVED BY:
DATE PAID 2
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project condltions such as
landscaping, parking lot stri ping, etc. must be completed before
requestlng thls i nspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanlcal and Flre Department inspections are made and
approved. No occupancy of the premises can be made until a
Certlficate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
AMouNr RECEIVED: 8/, O S
2-lz L
x #
ll/lo/e I [B:aE SE0t ?r0 S0B0 SPFI, DEV. EER.1gl003
Sum
d
Zonli14]_
Authoriuad Signature.
,-J
cPntilorleiD
225 rlrrE SrREm
SPRI}IGFIEI,D, ORPGOTI
INSPEGTION REQIIESTI
OPEICE: 726-3159
97471
(:t ETACIBICAI. PERIfIT APPIJCATION
726-37'5s1: \9,: ! -l Clty Job Ntrubei
1. Loca 0r ,ALI.ArION
JOB DESCRTPIION
Address 68 West "Q" Street
ct Spri ngf i el d, Phone747-6638
Permlts are non-transferable and explrelf vork Is not started'vtthln IB0 diysof _tssuance or lf .vork is susperid"A-for
180 days.
2. COIiITRACTOR IIISTALI..ATION ONLY
Electrlcal Contractor L.R. Brabham, Inc.
COI.{PI,g[E T8E SCEEDUI.E BEI.OS
Nev Besldentlel-Slngle orltultl-Psntly per dv;UlrA unlt.Servlce fncludedt "
Items
1000 sq.ft. or less
Each addltlonal 500sg. ft or portlon
thereof
Each Hanuf ,d Horue or _-
Hodular Dvelllng
Servlce or Feeder
Services or FeedersInstaIlatlon, Alteratlonsor Relocatlon;
200 anrps or less
201 anps to 1gg amps l--401 amps to 600_aurps :501 anrps to 1000 enps--
Over 1000 amps/volti
Reconnect only HI 4735
3.
A
c.
D.
E.
Cost
$ 85,00
$ 15.00
$ 40.00
B
$ 50.00
$ 60.00
s100.00
$130.00
$300.00
$ 40.00
,
Ovners
Address
cl
/dc,
Super,visor License Nunrber
Explratlon Date 1ol1/%
Conitr Contr. Number 08699
Explratlon Date 1Z/18/95
Slgna i,f Supervlslng Electricisn
Temporary Servlces or IeedersInstallatlon, Alteratlon or Relocatlon
200 anps or less S 40.00201 anps to 400 amps -- S 55.00Over 401 to 600 aurls
-
$ g0.OO
over 600 amps or 1000-il6Tts see uBi am
Branch Clrcults
Nev, Alteratlon or Extenslon per panel
one ctrcutt _{ $ 35.00 35*Each AddttlonalClrcutt or vlth Servlceor Peeder pernlt _ $ 2.00
Hlscellaneous (Servlce/feeder not lncluded)-Each tnstallatlon
funp or ltrlgatlon
pl gnl0u tllne - ltght t ng--!lolted Energy/ResLlolted Energy/Coma
-SUBTOTAT OF AEOVE
5Z State Surcharge
3Z AdsrlnlstrattvE pee
MTAI
LLo c
['hone
OVNER INSTALT,ATION
Ihe Installatlon ts belng made onproperty I oun vhlch ls not lntendedfor sale, lease or rent.-a
Oyners Elgnature:
$ 40.00
$ 40.00
$ 20.00
$ 36.00
5
DATE:
RBCEIVED
do
t
. I.EGAL DESCRIPTION
-h
(
-
.