Loading...
HomeMy WebLinkAboutPermit Mechanical 1998-02-10RESIDENTIAL PERMIT APPLICATION lnspections: 726-3769 Office: 726-3759 LOCATION OF PROPOSED WORK: ASSESSORS MAP: LOT: SPRIhlGFIELD ze JOB NUMBER ?got<a 225 Fifth Street SpringflelrJ, Oregon 97477 TAX LOT:O> SUBDIVISION: -- BLOCK: 4:, - zrp, ?)/2? naPHONE: STATE:CITY: ADDRESS: OWNER: NEW - REMODEL ADDITION DEMOLISH OTHER -- DESCRIBE WORK: ADDRESS EXPIRES ,11 PHONECONTRACTOR'S NAME GENERAL: PLUMBING: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR ,' - oFFtcE usE - WATER HEATER: FLOOD I)LAIN: RANGE: OUAD AREA: * OF BLDGS: SECONDARY HEAT: SQUABF. FOOTAGE: , OF BDRMS; - OCCY GROUP: I OF STORIES: ZONING CODE: CONSTR. TYPEr HEAT SOURCE: , OF UNITS: _- To request an Inspectlon, you must call 726-3769. Thls ts a24 hour recordlng. All lnspections requested before 7:00 a.m. wlll be made the same worklng day, lnspections requested after 7:00 a.m. wlll be made the followlng work day. REOUIRED INSPECTIONS l-l Temporary Electric t___J Rough Mechanlcal - Prior to cover. Flnal Plumbing - When att plumbing work ls complete. Slte lnspectlon - To be made after excavation, but prior to setting lorms. Rough Electrical - Prior to Flnal Electrlcal - When all electrical work is complete.cover. Underslab Plumblng/ Electrical / Mechanlcat - Prlor to cover.Electrical Servlce - Must be approved to obtain permanent electrlcal power. w Final Mechanlcal - When all mechanical work ls complete. Footlng - After trenches are excavated.[l Flreplace - Prlor to facing - materlals and framlng lnsp. Flnal Building - When all requlred lnspections have been approved and bulldlng is comp,eted.Masonry - Steel locatlon, bond beams, groutlng.Framlng - Prior to cover. Foundallon - After forms are erected but prlor to concrete placemont. Other Wall/Celling lnsulatton - Prlor to cover. Underground Plumblng - Prior to Illllng trench.Drywall - Prlor to taplng MOBILE HOME INSPECTIONS Underlloor Plumblng/ Mechanlcal - Prior to lnsulatlon or decking.Wood Stove - After lnstallation Post and Bsam - Prlor to floor lnsulation or decklng.lnsert - After flreplace approval and lnstallatlon o[ unlt. Blocking and Set.Up - When all blocklng ls complete. Floor lnsulation - Prior to decl<lng.Curbcut & Alrproach - After forms are erected but prior to placement of concrete. Plumbing Connectlons - When home lras been connected to water and sewer. Sanltary Sewer - Prior to fllling trench.Electrical Connection - When blocking, set-up, and plumbing lnspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & Drlveway - After excavation ls complete, forms and sub-base material in place. Water Llne - Prlor to filling trench.n Fence - When coiilpleted. Str€et Trees - When all requlred trees are planted. Final - After all required inspectlons are approved andporches, sklrting, decks, and ventlng have been lnstalled. E Rough Plumblng - Prior to cover. LAND USE: E E E E E E E E E P.L.HSE GAR ACC N S E Lot faces Lot sq. ftg. Lot coverage Topography Total helght Lot Type - - lnterlor - Corner - Panhandle ! - Cul-de-sac Set i.-1S THE PROPOSED WORK IN THE . HISTORICAL DISTRIC"T, OR ON THE HISTORICAL REGISTER? - ll yes, thls applicatlon must be slgned and approved by the Historlcal Coordinator prlor to permit issuance. APPROVED: VALUE (A) :; 't Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERfiiIT SQ. FT. X $/SQ. FT.ITEM Main Garage Carport This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any tlme upon violation of any provisions of said ordinances. Plans Reviewed By Date BUILDING AND BUIL E, PE LU D GN MR IT Date Paid Received By: Plan Check Fee: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within tlre City limits which are being improved. ITEM Flxtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Moblle Home FEE (c) FT. FT. N! FT. PLUMBING PERMIT Plumbing Permlt State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Flreplace Unit Dryer Vent MECHANICAL PERMIT (D)2Z-,2? E7 No /4,efr:B2r* /=.*Mechanical Permit lssuance State Surcharge Total Permit Furnace Exhaust Hood Vent Fan By slgnature, I state and agree, that I have carefully examlned the completed application and do hereby certlfy that all lnformatlon hereon is true and correct, and I f urther cerilfy that any and all work performed shall be done in accorrJance wlth the Ordinances of the City of Sprlngfield, and the Laws of the State of Oregon perlalnlng to the work descrlbed herein, and that NO OCCUPANCy will be made of any structure without perrnission of the Building Safety Divislon. I further certify that only contractors and employees who are in compliance with ORS 701.055 wlll be used on thls proiect. I further agree to ensure that all required inspections are requested at the proper time, that each address ls readable from tlre street, that the permlt card ls located at the front of the property, and the approved set of plans will remaln Date on the site at all times durin g constructio Slgnatu re MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Mlscellaneous Permits (E) ?,e DATE PAII) AMOUNT RECEIVED RECEIVED BY VALIDATION: RECEIPT NUMBER ,, . i .. ,i, Receipt Number:_ '|.PLAN CHECK TOTAL AMOUNT DUE (excluding electricat) _--- (4, B, C, Q and E Comblned) B2