Loading...
HomeMy WebLinkAboutPermit Building 1995-01-04COMM ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fif|h Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: lffi JOB NUMBER ?.*tuf, ASSESSORS MAP:/2e7- 35^ =/ INSPECTION LIN OFFICE: 726-3759 TAX LOT:A,fu5, ztPzSTATE: OWNER ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH OTHER VALUE: /?: - DESCRIPTION OF WORK: ot I rltotiln. EI EfrOIAAI NAME ADDFIESS PHONE AD EXPIRES PHONECONTRACTOR'S NAME ARCHITECT: MECHANICAL: GEN CONST. CONTBACTOR # PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg (new fix. addtl) Water Service f t. Sanitary Sewer ft. Storm Sewer ft Backf low Device MECHANICAL NO FFF l1}1A EG F Furnace/burner & vent <100,000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ ZONING* OF UNITS: HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER: LAND USE: OCCY GROUP: I OF STORIES: QUAD AREA: C OF BLDGS: CONSTR. TYPE: HEAT SOURCE: VALUE$/SQ. FT,SO. FT. TOTAL VALUE OF PROJ x X X SQ. FTG MAIN SO. FTG ACCESS SO. FTG OTHER RCPT#PLAN CHECK FEE BYDATE ,7.97 BUILDING PERMIT 5a. ra PLUMBI NG DEMOLITION 5% State Surcharqe Fft -7'12 5% State Su rc harge vECneNICAL ' -FENCE VALUE S 5% State Su rcharoe SIDEWALK SUBTOTAL PERMITS PAVING RBCUT SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL ?:r> PHoNE: ? /1^ /q-^ TOTAL PERMIT FT. FT. REQUIRED INSPECTIONS -' It ls the responslbility of the permit holder to see that all inspectlons are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all lnslab building service equipment, conduit, piping, accessories and other ancillary equipment items are ln place but before any concrete is placed. UNDERcROUND: ptumbing, electrlcal, gas, sanitary sewer, storm sewer, water and drainage lines. To be madeprior to covering or filling trenches. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspectlons have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspectlon. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all plpes, chimneys and vents are complete and FIRE & SEPARATION WALL: Located and constructed according to plans. LATH ANO/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, ls inplace but before anyplastering is applied or beforegypsum board joints and fasteners are taped and f inished. SIDEWALK & DRTVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. the rough electrical, ptumbing HlcH STRENGTH BOLTTNG:and mechanical are approved. During all bolt installation and SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 p.S.t. (306 a.l) STRUCTURAL WELDS: Performed on the job. (2722 t) tightening operations. (306 a.6) SPRAYED ON FIREPROOFTNG: U.B.C. Standards 43-9. PAVING: After gravel is in place but prior to placing asphalt or concrete. --- STR a.7) UCTURAL MASONRy: (306 x INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. UNDERFLOOR: ptumbing, electrlcal, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.11 &Chapter 29) cLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City'sBuilding Division before beams are placed. (2501 U.BC. STDS. 25-10,11). POST & BEAM: To be made prior to lnstallation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRTERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams groutlng or verticals ln accordance withuBc 2415. ROOF SHEATHING AND NAILING: Prlor to lnstalling any roof coverlng. 'ln addition to the inspec- tions specified, the BuildingOfficial may make or requl16 other inspections of anyconstruction work to ensure c_ompliance with the Building,City or Development Code. By signature' I state and agree' that I have caref ully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certify that any and all work performed shall be done in accordance with the ordinancesof the city of Springfield, and the Laws of the state of oregon p"it.intng to the work described herein, and that No occupANcywill be made of any structure wlthout permission of the Builiing'safeiy Dtvision. I further certify that only "onti""too and employeeswho are in compriance with oRS 701.055 wilr be used on tnis-project. Signatu Date cons I further agree to ensure that all required ins pections are requested at the proper time, that project address is readablestreet, that the permlt from theisldattfront of the property, and th e approved set of plans wlll remain on thetimes durin site at all VALIDATION AMOUNT RECEIVED: RECEIPT *:RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL F]NAL MECHANICAL FINAL FtRE DEPARTMENT ADDITIONAL COMMENTS: SITE 'LAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. Ail project "onoition's-such aslandscaping, parking rot striping, etc. must ue compieleo beforerequesting thls inspection. ( lltL BUtLDtNG: Requested after the final plumbing, etectricat,mechanlcal and Fire Department inspections are maEe andapproved. No occupancy of the premises ""n oe .J"- untir ,certrfrcate of occupancy has been issued bt G B;ir;iig Divisionand posted on the premises. PLANS REVIEWED BY DATE tffi-, ND.-4.ECG . U. [. CTASS A/St0pE RAitGE: 0, to 1/zo nailable deck APPUCAr,0it" THE R@F DECK Ehat, bo tirm. clsa. J and .6Mrh on^^^^, -L--^L: - , .. \ L{nJonery naiie6.';i f,r;'A"l?,lr,"iff1lffijt;,5lffi".jli,T:ln sharr be suppor,ed on ari edses THE O{NT STBIP Ehall b€ nsiled to the dock *irf, p-p.. Lngih ,;"hanicat ,ast€ne6 12,, o.c.coNBAsE w-, lv shar bo eppriad ar dghr ang,es to the ontiiuous Jornls of the surface ro be r@red cor !:s? w-l !V :h.flt be tapr€d'i, on giai ino 6; on il". -G; ;;;j r@ o, waro, is over or oaralet ro bur l1e-t a93i1"l' tho laFe. Tlrn uP 2' aloo top ol cant on all walls and v€rticat surfaces. Mechinrciir, i".r". g o.c. on laps and.Staggor lwo (2) rows lE' o.c. 12' dislanl rrom each edge. Atternatej uecrranriatty ia'sren w,.napprovgd stapldtapg mdthod. Rm o, tap€ whall b 12" o-c. stapte spic;ng shail comp,y wrrh minuiacr,re, s req uirsmonts. CONPLY AIV shall b€ ,appod so the tlolv o, tvaler is ovet ot pa'allel to, but nev€r against, lhe laps. All end laps shall bo at loast.l, and sdlacent end laps shall bo at least t2, apart. EMBED two (2) plias Conply AIV in shingle tashion, 'apping 19' with a 17" €xposur€. EMBEO tho tull width ot oach sh€€t in hot aspharl sppliad al a nominal rate of 30 lbs. per 100 sq. tt. ol rool arga. Each ply ghall b€ liohtly broomsd, using a modsratoly $tl commercial pueh b'oom, s it i5 aPPrieo. Arl prica .h.I tp-turnsd up e-- abovo rha cant aad shall be solid moppad to th€ cant and vertical wall. Buckles or lishmouths shall be cul and repairsd proporly. THE SURFACE to rocoivg coating shall b€ clean, unilorm, smooth, and dry All fishmouths. buckles or drr' laps shall be properly ropairod prior to applying coating. COAT THE ENTIRE SUBFACE with Concoat (plaln) emulsion appliod at a minimum rate o, nine (9) gallons per 'l0O sq. tt. ot rool araa. Chopp€d libsr glass ,oring shall b€ simultanoously 6mb6dded in the emulsion al a minimum rate ol thr6o (3) lbs. p€r 100 sq. tt. ALUMINUM COATING shall be applisd in strict complianco with manulacturer's recommendations and app rec al a minimum rato ot ong (1) gallon per 100 sq. ft. of roof aroa. VALLEYS/WATERWAYS shall roceive an oxtra la)€r of Conply A-lV which shall be at l6ast 36" wide ll shall er' tond at leagl 8' up incllnes out o, vallsy!. This ply shall bg laid on top ol base sheet prior lo applicalion ol othor plies. Embod the full width o, each shsel ln a cnitorm mopping ot hot Gphalt applied at a nomrnal rale ol 30 lbs. per 100 sq. ft. ol r@, s6a. ON SLOPES sxcsoding 1-%" per root hot asphalt shall bs applied at a nominal rate o, 25 lbs. per 1oo sq tl ol rool aroa. All BUh shall bo applied parallsl to ths slope ot dock. On slopes 2" par lool and greater the p ! sheots ghall b6 "back-nailsd" to the dock or wood nail€B (on insulatsd specifications) pe. the followrng 8chedulo: Ply Shcat! Nsll lhos. Ollt$ccs From Back.dge 2 18', s 12', 4 18" Concap shall bo.back nslled wlth two (2) rows nails staggered 3" o.c. OmION: The 6bove spocificatlon may be appllod wlth cold procoss adhesive by etl€cting the following substitutlon8: 1. Sulstituts 3 gsllon8 Conhssivo por tOO sq. ft. vs. 30 lbs. hot sphalt. 2. Substitulg Conbaso W'l lV I a pty sh€et whorover Conply AIV rs requirod ' Relol to soclion 2.15, pa€o 18, lor propsl malt point ol sphatt lor slope involvod' " ALL Spplication foquiremenE lrom tho "General Roqulrements" sadion are considered pad ol lhese spocilication8. ffEUY8COre6 c*r6c*o^ri.rx MATERIAT REOUIRED PER 1(l(l SOUABE FEET OF RO(IT AREA M6chanical Fasteners Conbase W.1 lV 1 ply Conply A-lV 2 plies Asphalt, plies Concoat Emulsion, 9 gal. Glass Fibers Conshield Aluminum Coating, 1 gal. Accessorigs and Flashing Materials as Required' As required 25 lbs. 22 lbs. 60 lbs. 72 lbs. 3 lbs. 8 lbs. QO!4 M ERCTAL/t N DUSTRTAL PERMIT APPLICATION 225 Fitlh Street, Springfietd, Oregon g?4tl INSPECTTON LtNE: 726-3769 OFFICE: ?26-3Z59 SPRINGFIELO LOCATION OF PRO ASSESSORS MAP: .l Vn JOB NUMBER TAX LOI OWN CITY: AD STATE: PHONE: ZIP: DEMOLISH HER VALUE OESCRIPTION OF WORK: "NEW BEMODEL ADD NAME ADDRESS PHONE ADDRESS EXPIRES PHONE ELECIRICAL: ARCHITECT CONTRACTOR'S NAME MECHANICAL: PLUMBING: GENERAL: CONST, CONTRACTOR # NO.FEE CHARGE Single Flxture Relocated Bldo.(new flx. addtl)- ce ft. Sanltary Sewer ft. rm ft.&sP Backf low Device TOTAL PERMIT NO FEE CHARGFrnacI&burner ve ntFu <1 1 F urnace/burner & vent Floor furnace and vent evanary p. coo ler an duct nt ex aust hood and duct ec Permit lssuance $10.00 TOTAL PERMIT HANDICAP ACCESS: _ FLOOD PLAIN: ZONING: LIGHTING POWER BUDGET: WATER HEATER:._--N OF STORIES: - OFFICE USE - OCCY GROUP: LAND USE:QUAD AREA: * OF BLDGS: CONSTB. TYPE: HEAT SOURCE: * OF UNITS: SQ. FT.$/so. FT.VALUE TOTAL VALUE OF PROJ x X x SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY BUILDING PERMIT PLUMBING COSP DEMOLITION 5% State Surcharoe 5% State Surcharoe /.as MECHANICAL FElr9f, A.Ay4nte+ r.-,tzr\. 0_\ 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT C)cTOTAL PERMIT FEES EXCLUDING ELECTRICAL Suspended wall oiiloor mounted unit heater Appliance Vent separate vent system apart lrom AC or htg. SITE INSPECTION: To be made after excavatlon, but Prior to setuP of forms' UNDERSLAB PLUMBING' ELECTRTCAL & MECHANICAL: To be made before any work is covered' FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel ln Place, but Prior to Placlng concrete' CONCBETE SLAB: To be made after all lnslab building servlce equlPment, condult' PlPing, accessories and other ancillary equiPment items are ln Place but belore anY concrete ls Placed. UNDERGROUND: Plumblng, electrlcal, gas, sanltarY sewer' storm sewer, water and dralnage llnes. To be made prlor to coverlng or f illlng trenches' It ls the resPonslbllltY of 7 26.91 69 (recorde r), state for lnsPectlon. Reguests the following work daY. UNDERFLOOR: Plumbing' electrlcal, mechanical' To be made Prlor to installation of floor insulatlon, decking or floor sheathlng. POST & BEAM: To be made prlor to lnstallatlon of floor lnsulatlon, decklng or floor sheathlng. FLOOR INSULATION & VAPOR BARRIERS: To be made Prlor to lnstallatlon of decklng or floor sheathlng. MASONRY: Steel locatlon, bond beams groutlng or vertlcals ln accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prlor to lnstalllng any roof coverlng. ROUGH PLUMBING' ELECTR]CAL & MECHANICAL: No work is to be covered until these insPections have been made and aPProved' ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to Placing facing materials and before framing lnsPection. FRAMING: To be made after the roof, all framlng, fire blocking and braclng are ln Place and all PlPes, chimneYs ind vents are comPlete and the rough electrical, Plumblng and mechanlcal are aPProved' INSULATION & VAPOR BARRIER: To be made after all insulation and required vaPor barrlers are ln Place but before any lath or gypsum board lnterlor wall covering is applied. F]RE & SEPARATION WALL: Located and constructed according to Plans. LATH AND'OR GYPSUM BOARD: To be made after all lathlng and gypsum board, lnterlor and exterlor, ls ln place but before anY plasterlng ls applied or before gYPSum board jolnts and fasteners are taPed and f inlshed. SIDEWALK & DRIVEWAY: Requlred for all concrete paving within street right of way, to be made after all excavatlng complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prlor to placing concrete. PAVING: After gravel is in Place but Prlor to Placlng asPhalt or concrete' SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code i special lnspector shall be employed bv the Owner/ Contractor during construction of the following work' A copy of the special testing reports shall be furnished to the Bullding Divislon. STRUCTURAL CONCRETE: IN excess of 2500 P.S'l' (306 al) STRUCTURAL WELDS: Performed on the lob. (2722 ll HlGH STRENGTH BOLTTNG: During all bolt installation and tightenlng operations' (306 a.6) REOUIRED INSPECTIONS the permit holder to see that all lnspectlons are made at the proper time. To request an inspection' call your city designated iot-nu-oer, lou aooresJ, ivpe ot inspeciion requested and when you will be ready received before 7:OO a.m. *irr u" mad6 the same worxing day' requesis made af ter 7:OO a'm' wlll be made SPRAYED ON FIREPROOFING: U.B.C. Standards 43'8. SPEC]AL GRADING, EXCAVATION AN D FILLING: Durlng earthwork. (306 a.11 & Chapter 29) GLU-LAM BEAMS: lnspectlon Certificate by an aPProved agency, furnlshed to the Clty's Bullding Dlvislon before beams are placed. (2501 U.BC. STDS. 25-10J1). STRUCTURAL MASONhY: (306 a.7l 'ln addltion to the lnspec- tions speclfied, the Bulldlng Offlclal may make or requlre other lnspectlons of any construction work to ensure compllance with the Bulldlng, Clty or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish lnspection. All project condltlons such as landscaplng, parking lot striping, etc. must be completed before requestlng thls inspection. FINAL BUILDING: Flequested after the final plumbing, electrical, mechanlcal and Flre Department inspectlons are made and approved. No occupancy of the premises can be made untll a Certlflcate of Occupancy has been issued by the Bullding Dlvlslon and posted on the premises. ADDITIONAL GOMMENTS: PLANS REVIEWED BY By slgnature, I state and agree, that I have carefully examlned the completed appllcatlon and do hereby certlfy that all lnformatlon hereln is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordlnances of the Clty of Sprlngfleld, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCY will be made of any structure wlthout permission of the Bulldlng Safety Dlvlslon. I f urther certify that only contractors and employees who are in compllance with ORS 701.055 will be used on this project. I further agree to ensure that all requlred inspections are requested at the proper time, that project address is readable from theat the permlt card ls located at the front ff the property, and the approved set of plans wlll remaln on the slte at allng constructlon Date AMOUNT RECEIVED:DATE PAID: RECEIVED st 'toN: RECEIPT *: I JZ DATE