Loading...
HomeMy WebLinkAboutPermit Building 2001-05-08Job# 00-01170-01 RESIDENTIAL PERMIT City Of Springfield Gommunity Services Division Building Safety Page 1 of4 SPIIINGFIELD I i\nlIL,lf un!L,= 225 North Fifth Street Springfield, OR97477 Location Of Proposed Site: 2615 00003rd St Spr AssessorsMap#: 17032334 Lot: Block: Addition: Job Number: 00-01 170-01 Office:726-3759 lnspection Line: 726-3769 Tax Lot #: 04400 Subdivision: v Owner: Tracy and Bonnie Smith Phone Number: 541-741-0042 Address: 2615 3rd Street City/State/Zip: Springfield, OR97477 Scope Of Work: Family Room Addition Value: $68,580 Garage conversion, addition and new attached garage Resubmitted new plan on January B, 2001 3l22l11- Snlittino oroiect into two ohases - to add new oaraoe laterwhen existino drainaoe Contractor Type Contractor Registration # Expiration Date Phone General Contr Tracy and Bonnie Smith 541-74'l-0042 2615 3rd Street, Springfield, OR97477 Electrical Contr Tracy and Bonnie Smith 541-741-0042 2615 3rd Street, Springfield, OR97477 Mechanical Contr Tracy and Bonnie Smith 541-741-0042 2615 3rd Street, Springfield, OR97477 Plumbing Contr Tracy and Bonnie Smith 541-741-0042 2615 3rd Street, Springfield, OR97477 office use - Quad Area: # Of Units: Constr. Type: Water Heater: 5RNW (VN) Wood Frame Land Use: Zoning Code: Bedrooms: Range: # Of Buildings: 1 Occupancy Group: Dwelling Heat Source: Baseboard Electric Sq. Footage: 682 ctTY oF SPR7NGFIELD, OREGON To request an inspection call the 24 hour recording at726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Required Inspections Footing Foundation Post and Beam Floor lnsulation Ceiling lnsulation Shear Wall Nailing Framing Walllnsulation Drywall auilalnrAmTleH: -After trenches are excavated. ilitii ;: Etil-,11T .qHALL EXPIRE lF THE WoRK -After forms are erected but prior tXg+erflp,B$ffiqffiH THIS pERMIT l$ NCr -Priortofloor insulation ordecking/{i'}lr" :ircr'L' v''": ... -\ F^-' -Prior to decking. .. --.. . - - :-', lii lS i'[I:i]: " : i '-' '{ -Prior to cover. -Before covering sheathing with finish materials - Prior to cover. - Prior to Cover -Prior to taping. lA numberforthe Job# 00-01170-01 Page 2 of 4 Required lnspections Buildi -When all required inspections have been approved and the building is complete. Electrical -Prior to cover. -When all electrical work is complete. -Priortoinrrtrtioffi - Prior to cover or placement of concrete. - Prior to cover. - Prior to filling trench. -When all plumbing work is complete. Mechanica! - Prior to cover. -When all mechanicalwork is complete. Public Works -After forms are erected but prior to placement of concrete -After forms are erected but prior to placement of concrete Sidewalk Type: Additional ROW? Size Of Line (in): Downspouts/Drains: Enchroachment Permit: San Sewer Tee (in): 00/00/0000 00:00 AM Bond End DateTime: 00/00/0000 00:00 AM Roof drains to curb or canal. ln UGB and has private septic system. No Types Of Warning Devices Reqd. r Final Building Rough Electrica! Final Electrical Underfloor Plumbing Underfloor Drain Rough Plumbing Storm Sewer Line FinalPlumbing Rough Mechanical Final Mechanical CC-Close & Replace GG-Standard Street lmprovement: Curb Cut?[ San Sewer Depth (Ft): Storm Sewer Available? SpecialReq.: Security Required: Bond Begin DateTime: Special lnstructions: Other Utilities: Project Supervisor: AC Mat lmprovement Agr.? Zoning: LDR FloodPlain? [ Wetlands? [ Journal numbers 1: 2: Comments: Planner: AlWard Urban Growth Boundary?f Quantity Of Fill: Supplier: Drainage: Floodway FEMA: n/a Overlay District: # of Street Trees: Glenwood Area? Land Use: Single Family Dwelling Pave Driveway? E 3: Additional Requirements Required Attachments: Source Locn: Material: Flood Plain FEMA:nla l Construction Types(VN) Wood Frame Occupancy Groups: Dwelling # Of Buildings: 1 # Of Bedrooms: Handicap Access? Area (Sq. Main: 682 Accessory572 Job# 00-01170-01 Accessory Structure # Of Stories: 1 Height (feet): 14 Current Units:1 Proposed Units: Census Gode:Does not apply Total:1254 Page 3 of 4 Fee Paid On Receipt# Value/Quantity Fee Amount Plan Check Residential Plan Check Additional Plan Check Total Plan Check 0712812000 05/08/2001 2707 5223 34,472 81 $140.08 $80.92 $221.00 Building Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building 05/08/2001 05/08/2001 05t08t2001 5223 5223 5223 68,580 $340.00 $23.80 $10.20 $374.00 Electrical Branch Circuits WO Feeder or Service State Surcharge - Electrical Administrative Fee - Electrical Total Electrical 05/08/2001 05/08/2001 05/08/2001 5223 5223 5223 9 $51.00 $3.57 $1.53 $56.10 Plumbing Minimum Plumbing Permit Fee Number of Fixtures State Surcharge - Plumbing Administrative Fee - Plumbing Total Plumbing 05/08/2001 05/08/2001 05/08/2001 05/08/2001 5223 5223 5223 5223 $.00 $50.00 $3.50 $1.50 $5s.00 Mechanical Minimum Mechanical Permit Administrative Fee - Mechanical Vent Fan to One Duct Dryer Vent Mechanical lssuance State Surcharge - Mechanical Total Mechanical 0st08t2001 05/08/2001 05/08/2001 05/08/2001 05/08/2001 05/08/2001 5223 5223 5223 5223 5223 5223 2 2 $3.00 $.45 $6.00 $6.00 $10.00 $1.05 $26.50 Public Works New Curbcut Curbcut Repair Total Public Works 05/08/2001 05/08/2001 5223 5223 00 00 00 $60. $30. $e0. Develo Residential- Single Family - Storm SDC Administrative Fee Total System Development 05/08/2001 05/08/2001 5223 5223 $212.46 $10.62 $223.08 Comment 784 $1,045.68Grand Total Plan Check Type lnitial Review-Res Checked By Lisa Hopper Date Completed 07t3112000 5 1 1 Plan Check Type lnitial Review-Res Engineering-Res Engineering-Res Planning-Res Planning-Res Structural-Res Structural-Res Signatu re Checked By Wendy Stanley Dennis Ernst Steve Templin AlWard Ruth Klein Wendy Stanley Don Moore Job# 00-01170-01 Date Completed 0110812001 08t04t2000 03t23t2001 0B/09/2000 03t27t2001 0B/1 5/2000 03t28t2001 05/08/2001 Page 4 of 4 Comment 2nd submittal 2nd submittal Planning approval for conversion of garage to family room. 2nd Submittal - Phase I only. not including the new garage until existing drainage easement is vacated. 2nd Submittal - OK for Phase l, not including new garage structure. Phase ll - (Garage/Rec.Rm.) OKs'oB'o r Date