HomeMy WebLinkAboutPermit Building 1995-12-29OF SPilNGFIELD,
SPRINGFIELD
225 North Fifth Street
Springfield, OR 97477
Location of Proposed Work: 1893 N 2DID ST
Assessors lutap #: L7032624
COMMERCIAI,/ INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD ilob Number:
COMMT'NITY SERVICES DTVISION
BUII,DING SAFETY
office:
Inspection Line:
Page 1
9517488
726 -37 59
726 -37 69
Tax LoL #: 01000
Owner: ROY GRAY ,fR
Address: L379 SUNNY DRIVE
Description Of Work
Phone #: 688-6795
City/state/ztp: EUGENE, oREGoN 97404
NEW Value:0.00
--- PLU}TBING ---
No
2
Fee Charge
20.00
20.00
Single Fixture
TOTAL PER}IIT
--- MECIIANTCAL ---
No
1
Fee Charge
3.00
10.00
25.00
Vent Fan/Sing]e Duct
Permit Issuance
TOTAI. PERMIT
-- OFFICE USE --
HAND]CAP ACCESS: Y
Item
Sq. Ftg Main
SITE IMPROVEMENTS
TOTAL VALUE OF PRO,JECT
Square Feet
24600
x $/Square Feet Vafue
410, 418 . 00
115, 582 . 00
525, 000 . 00
Pl-an Check Fee 736.29 Rec #: 19500 Date: tL/03/95 Rec By: LoRNE PLEGER
BUILDING
Surcharge/admin
MECHANICAL
Surcharge/admin
PAVING VALUE
PLUMBING
Surcharge/admin
FENCE VALUE
SIDEWALK
CURBCUT
SUBTOTAL PERMTTS
115, 582.00
I ,1,32 .7 5
90.62 ,
25.00 '
L.20 '
459.00 .
20.00 '
1.60 .
5.00 r
40.90 .
15.30 -
t , 802 .37
L,802 .37
t 2)q7732
TOTAL PERMIT FEES EXCI,UDING EI,ECTRICAL
lDCI>
D?7//-
1, 550 . 00
I frz)4;ac1
SPR!NGFIELD
,Job Number: 951748B
OTT OF SPilNGFTELD, ONEGON
Page 2
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, cal-l 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspeclion. Requests
received before 7:00 a.m. will be made the same working day, requesus made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with Section 305 of the State Specialty Code
a special inspector shall be employed by the Owner/Contract.or during
consEruction of any following ",t" work. A copy of the special testing reports
shall be furnished to Building Safety.
In addition to the inspections specified, the Building Official may make or
reguire other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
FOOTING - After trenches are excavated.
FOITNDATION - After forms are erected buE prior to concrete placement.
SLAB - To be made after all inslab building service equipmenE, conduit
piping, and other equipment items are in place but prior to concreEe
ROUGH PLUIIBfNG - Prior to cover.
ROUGH IIECIiAI{ICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRADIfNG - Prior to cover.
INSULATION - FLoor; prior to decking wa11/Ceiling; Prior to cover
DRYWALL - Prior to taping.
FINAL PLUIIBING - When all plumbing work is complete.
FINAL MECIIAI{ICAL - When all mechanical work is compleEe.
FINAL ETECTRICAL - When all electrical work j-s complete.
FINAL FIRE - When all Fire Department reguirements have been met.
been met.
CURBCUT - After forms are erected but prior to placement of concrete.
SfDEWALK - After excavation is complete, forms and sub-base material
in p1ace.
ROUGH GRADING - After gravel is in place but prior to placing concrete
FINAT SITE PLAtiI - After aII requirements have been met for Minimum
Development Standards or from the Development Agreement.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAI, COMMEMTS
,JOURNAL 95-02-30, GARY KARP PLANNER
SITE UTILITIES UNDER EARLIER PERMIT
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By:
Date: L2/20/95
CITY OF ONEGON
SPRINGFTELD
.Iob Number: 95L7488 Page 3
By signaEure, I stsate and agree, that I have carefully examined the completed
applj-cation and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the ordinances of the City of Springfield, and Ehe Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure wiLhout permission of the
Community Services Division, Building Safety. I furt.her certify that only
contractors and employees who are in compliance with oRS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans wiII remain on the siEe at all times during construcLion.
C./Ll I>7 rr
Signature Date
--- VAI,IDATTON ---
/?92GReceipt Number:
Date Paid:
Amount Received:
Received By:
/2-*-29
2
Page 1
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: ROY GRAY ,JR
Location: 1893 N 2ND ST
Developement Tlpe: C Building Size:
Job No. : 951-748
Lot Size:Sq Ft
1. STORM DP.AINAGE
Impervious Sq Ft 1.0 X 464L0
2. SA}IITARY SEWER - CITY
Number Of PFUS 1.0 X 7
(see Page 2)
3. TRANSPORTATION
Number Of Units
1.0 x 24.5 X
x Trip Rate
o.260 x
Transportation Total
4. SANITARY SEWER - MVIMC
Number Of PFUs
0
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
X 0.210 Per Sq Ft =
X 43.43 Per PFU =
x Cost Per Tri-p
437.93
x
Y
Per PFU + MWMC Admin Fee
18.7s0
$2,801.00
$9 ,7 45 .1-O
$304.01
$2,801.00
$o. oo
$o. oo
$0.00
$12,851.11
$642 . s6
5. ADMINISTR,ilTIVE FEES
Base Charge (Subtotal Above)x 0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER Date: L2/04/95
iL3 ,493 .67
rTob Number ; g5l7 4g
FTXTURE T'NTT CAI,CULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
fnLerceptors For Grease/oil_/Solids/BtcInteceptors For Sand/Auto Wash,/EtcLaundry Tub/Clotheswasher
Cl-otheswasher _ 3 Or MoreReceptor For Refrj_gerator/Water Statlon/ftcReceptor for Commercial- Sink/Dishwasher,/EtcShower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential_ KitchenUrinal , Sta11,/Wal1
Wash Basin/Lavatory, SingleWater Cl_oset, public InstallationWater Cl_oset, private
Miscellaneous
TOTAL FIXTIIRE UNTTS =
Number of
New Fi_xture
Unit
Equivalent
Page 2
Fixture
Units
0
0
0
0
0
0
U
0
0
0
0
n
1
6
U
0
2
1
a
3
R
2
6
1
3
-
2
2
1
6
4
U
U
0
n
0
0
0
0
n
U
0
1
1
0
0
7
CREDTT CALCULATfON
Credit. For parcef Or Land Only If Applicable:
fmprovement (if after annexation date):
TABLE: Based on assessed val_ue. ff improvements occuredafter annexation date, credi_ts are cal_cul-ated separately(cal-culations are by gIOOO)Year Annexed: lg73
0 x 3.47 =
0 x 3.47 =
CREDfT TOTAL =(rf land value is multiplied by 1 then the parcel/Iand credit is not
0.00
0.00
$0.00
accurate. )
SPF!NGFIELD
CO}TMERCIAL / IIIDUSTRIAIJ PERITIIT AP PI'I CAT I ON
CITY OF SPRINGFIELD
COMMI'NITY SERVTCES DIVISION
BUIIJDTNG SAFETY
Page 1
ilob Nurnber: 95L7 48
225 North Fifth Street
Springfield, OR 97477
Location of Proposed Work: L893 N 2ND ST
Assessors Map #: 17032524
Office:
Inspection Line:
725 -37 59
726-3769
Tax Lot #: 01000
CITY OF SPruNGFIELT', ONEGON
Owner: ROY GRAY iIR
Address : 1,379 SUNNY DRfVE
Description Of Work: MINf STORAGE
Phone #: 688-6795
Citylstate/Zip: EUGENE, OREGON 97404
NEW VaLue:0.00
Name
BRANCH
Address PhoneArchitect.:
General:
Plumbing:
Elect.rical:
ContracEor
ConEt,.
Contractor #Expires
0t/L6/e7
os/04/e6
02/07/9s
Fee
Phone
238 -3772
256 - 5437
699-48L1_
LORNE PLEGER
--- PLT'MBTNG ---No
Sing1e Fixture
Sanitary Sewer
Water Service
Storm Sewer
BACKFLOW DEVICE
45
229
520
ft
fr
fr
Charge
20 .00
25 .00
s5.00
100.00
10.00
210.00
Val-ue
0.00
TOTAL PERMTT
QUAD AREA: 1CNW
__ oFFICE USE __
LAND USE: 53OO
ftem Sguare Feet x $/Square peet
TOTAL VALUE OF PRO,JECT
PIan Check Fee 73G.29 Rec #: 19500 Date: tL/03/95 Rec By:
Surcharge/Admin
MECHANICAL 0.00
0.00
MEGA PACIFIC 0063108
PO Box 82186 portland OR 972B2OLB6
JRT MECIANICAL OO988O81L711 NE 99th St Ste 910 Vancouver
TNFINTTY ELECTR OO966L2
SPFINGFIELO
,.fob Number: 951748
qTT OF SPruNGFIELI', ONEGON
Page 3
Receipt Number:
Date Paid:
Amount Received:
Received By:
--- VALIDATION ---
/"-/q2,
?22,a?aZ--*s
.//"
SPRI]l.GFIELD
Job Number : 951-7 48
CITY OF SPruNGFIELD, ONEGON
Page 2
Surcharge/aamin
PLUMBING
Surcharge/admin
SDC'S WILL BE PAID
WITH NEXT PHASE OF
PERMfT
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
0
2LO
l_5
0
0
0
00
00
BO
00
00
00
frFafuzry*7,226 . BO
LU4$J,#)??6.#TOTAL PERIIIT FEES EXCLITDING ELECTRICAL
--- REQUTRED TNSPECTTONS ---
It is the responsibility of the permit holder to see that al-I inspections are
made at the proper time. To request an inspection, call 726-3759
(recorder), staUe your City designated job number, job address, type of
inspection requested and when you wiLl- be ready for inspection. Requests
received before 7:00 a.m. wil-l- be made the same working day, requests made after
7:00 a.m wil-l- be made the following work day.
Special Inspections: In accordance wj-th Section 305 of the State Specialty Code
a special inspector shall be employed by the Owner/Contractor during
constructj-on of any following'r*r' work. A copy of the special testing reports
shal-l- be furnished to Building Safety.
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, CiEy or Development Code.
WATER LINE - Prior to fifling trench.
SA.I{ITARY SEUIER LINE - Prior to filling tsrench
STORM SEWER LINE - Prior to fil-ling trench.
I --- A.DDITIONAI. COMMENTS ---
PLANNER IS GARY KARP
THIS PERMIT FOR INSTAI,LATION OF STORM, SANITARY AND WATER SERVICE PIP]NG ONLY
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 1,2/1,4/95
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that al-I information hereon is true and
correct, and f furLher certify that any and all work performed shaI1 be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permissj-on of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that Lhe
permit card is located at the front of the property, and the approved set
of plans on the site at all times during construction
tq 0s\ qt
Signature
1l- rema
Dat.e