Loading...
HomeMy WebLinkAboutPermit Building 1995-12-29OF SPilNGFIELD, SPRINGFIELD 225 North Fifth Street Springfield, OR 97477 Location of Proposed Work: 1893 N 2DID ST Assessors lutap #: L7032624 COMMERCIAI,/ INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD ilob Number: COMMT'NITY SERVICES DTVISION BUII,DING SAFETY office: Inspection Line: Page 1 9517488 726 -37 59 726 -37 69 Tax LoL #: 01000 Owner: ROY GRAY ,fR Address: L379 SUNNY DRIVE Description Of Work Phone #: 688-6795 City/state/ztp: EUGENE, oREGoN 97404 NEW Value:0.00 --- PLU}TBING --- No 2 Fee Charge 20.00 20.00 Single Fixture TOTAL PER}IIT --- MECIIANTCAL --- No 1 Fee Charge 3.00 10.00 25.00 Vent Fan/Sing]e Duct Permit Issuance TOTAI. PERMIT -- OFFICE USE -- HAND]CAP ACCESS: Y Item Sq. Ftg Main SITE IMPROVEMENTS TOTAL VALUE OF PRO,JECT Square Feet 24600 x $/Square Feet Vafue 410, 418 . 00 115, 582 . 00 525, 000 . 00 Pl-an Check Fee 736.29 Rec #: 19500 Date: tL/03/95 Rec By: LoRNE PLEGER BUILDING Surcharge/admin MECHANICAL Surcharge/admin PAVING VALUE PLUMBING Surcharge/admin FENCE VALUE SIDEWALK CURBCUT SUBTOTAL PERMTTS 115, 582.00 I ,1,32 .7 5 90.62 , 25.00 ' L.20 ' 459.00 . 20.00 ' 1.60 . 5.00 r 40.90 . 15.30 - t , 802 .37 L,802 .37 t 2)q7732 TOTAL PERMIT FEES EXCI,UDING EI,ECTRICAL lDCI> D?7//- 1, 550 . 00 I frz)4;ac1 SPR!NGFIELD ,Job Number: 951748B OTT OF SPilNGFTELD, ONEGON Page 2 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, cal-l 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspeclion. Requests received before 7:00 a.m. will be made the same working day, requesus made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with Section 305 of the State Specialty Code a special inspector shall be employed by the Owner/Contract.or during consEruction of any following ",t" work. A copy of the special testing reports shall be furnished to Building Safety. In addition to the inspections specified, the Building Official may make or reguire other inspections of any construction work to ensure compliance with the Building, City or Development Code. FOOTING - After trenches are excavated. FOITNDATION - After forms are erected buE prior to concrete placement. SLAB - To be made after all inslab building service equipmenE, conduit piping, and other equipment items are in place but prior to concreEe ROUGH PLUIIBfNG - Prior to cover. ROUGH IIECIiAI{ICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power. FRADIfNG - Prior to cover. INSULATION - FLoor; prior to decking wa11/Ceiling; Prior to cover DRYWALL - Prior to taping. FINAL PLUIIBING - When all plumbing work is complete. FINAL MECIIAI{ICAL - When all mechanical work is compleEe. FINAL ETECTRICAL - When all electrical work j-s complete. FINAL FIRE - When all Fire Department reguirements have been met. been met. CURBCUT - After forms are erected but prior to placement of concrete. SfDEWALK - After excavation is complete, forms and sub-base material in p1ace. ROUGH GRADING - After gravel is in place but prior to placing concrete FINAT SITE PLAtiI - After aII requirements have been met for Minimum Development Standards or from the Development Agreement. FINAL BUILDING - When all required inspections have been approved and the building is complete. --- ADDITIONAI, COMMEMTS ,JOURNAL 95-02-30, GARY KARP PLANNER SITE UTILITIES UNDER EARLIER PERMIT Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: Date: L2/20/95 CITY OF ONEGON SPRINGFTELD .Iob Number: 95L7488 Page 3 By signaEure, I stsate and agree, that I have carefully examined the completed applj-cation and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the ordinances of the City of Springfield, and Ehe Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure wiLhout permission of the Community Services Division, Building Safety. I furt.her certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans wiII remain on the siEe at all times during construcLion. C./Ll I>7 rr Signature Date --- VAI,IDATTON --- /?92GReceipt Number: Date Paid: Amount Received: Received By: /2-*-29 2 Page 1 CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: ROY GRAY ,JR Location: 1893 N 2ND ST Developement Tlpe: C Building Size: Job No. : 951-748 Lot Size:Sq Ft 1. STORM DP.AINAGE Impervious Sq Ft 1.0 X 464L0 2. SA}IITARY SEWER - CITY Number Of PFUS 1.0 X 7 (see Page 2) 3. TRANSPORTATION Number Of Units 1.0 x 24.5 X x Trip Rate o.260 x Transportation Total 4. SANITARY SEWER - MVIMC Number Of PFUs 0 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) X 0.210 Per Sq Ft = X 43.43 Per PFU = x Cost Per Tri-p 437.93 x Y Per PFU + MWMC Admin Fee 18.7s0 $2,801.00 $9 ,7 45 .1-O $304.01 $2,801.00 $o. oo $o. oo $0.00 $12,851.11 $642 . s6 5. ADMINISTR,ilTIVE FEES Base Charge (Subtotal Above)x 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: L2/04/95 iL3 ,493 .67 rTob Number ; g5l7 4g FTXTURE T'NTT CAI,CULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain fnLerceptors For Grease/oil_/Solids/BtcInteceptors For Sand/Auto Wash,/EtcLaundry Tub/Clotheswasher Cl-otheswasher _ 3 Or MoreReceptor For Refrj_gerator/Water Statlon/ftcReceptor for Commercial- Sink/Dishwasher,/EtcShower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential_ KitchenUrinal , Sta11,/Wal1 Wash Basin/Lavatory, SingleWater Cl_oset, public InstallationWater Cl_oset, private Miscellaneous TOTAL FIXTIIRE UNTTS = Number of New Fi_xture Unit Equivalent Page 2 Fixture Units 0 0 0 0 0 0 U 0 0 0 0 n 1 6 U 0 2 1 a 3 R 2 6 1 3 - 2 2 1 6 4 U U 0 n 0 0 0 0 n U 0 1 1 0 0 7 CREDTT CALCULATfON Credit. For parcef Or Land Only If Applicable: fmprovement (if after annexation date): TABLE: Based on assessed val_ue. ff improvements occuredafter annexation date, credi_ts are cal_cul-ated separately(cal-culations are by gIOOO)Year Annexed: lg73 0 x 3.47 = 0 x 3.47 = CREDfT TOTAL =(rf land value is multiplied by 1 then the parcel/Iand credit is not 0.00 0.00 $0.00 accurate. ) SPF!NGFIELD CO}TMERCIAL / IIIDUSTRIAIJ PERITIIT AP PI'I CAT I ON CITY OF SPRINGFIELD COMMI'NITY SERVTCES DIVISION BUIIJDTNG SAFETY Page 1 ilob Nurnber: 95L7 48 225 North Fifth Street Springfield, OR 97477 Location of Proposed Work: L893 N 2ND ST Assessors Map #: 17032524 Office: Inspection Line: 725 -37 59 726-3769 Tax Lot #: 01000 CITY OF SPruNGFIELT', ONEGON Owner: ROY GRAY iIR Address : 1,379 SUNNY DRfVE Description Of Work: MINf STORAGE Phone #: 688-6795 Citylstate/Zip: EUGENE, OREGON 97404 NEW VaLue:0.00 Name BRANCH Address PhoneArchitect.: General: Plumbing: Elect.rical: ContracEor ConEt,. Contractor #Expires 0t/L6/e7 os/04/e6 02/07/9s Fee Phone 238 -3772 256 - 5437 699-48L1_ LORNE PLEGER --- PLT'MBTNG ---No Sing1e Fixture Sanitary Sewer Water Service Storm Sewer BACKFLOW DEVICE 45 229 520 ft fr fr Charge 20 .00 25 .00 s5.00 100.00 10.00 210.00 Val-ue 0.00 TOTAL PERMTT QUAD AREA: 1CNW __ oFFICE USE __ LAND USE: 53OO ftem Sguare Feet x $/Square peet TOTAL VALUE OF PRO,JECT PIan Check Fee 73G.29 Rec #: 19500 Date: tL/03/95 Rec By: Surcharge/Admin MECHANICAL 0.00 0.00 MEGA PACIFIC 0063108 PO Box 82186 portland OR 972B2OLB6 JRT MECIANICAL OO988O81L711 NE 99th St Ste 910 Vancouver TNFINTTY ELECTR OO966L2 SPFINGFIELO ,.fob Number: 951748 qTT OF SPruNGFIELI', ONEGON Page 3 Receipt Number: Date Paid: Amount Received: Received By: --- VALIDATION --- /"-/q2, ?22,a?aZ--*s .//" SPRI]l.GFIELD Job Number : 951-7 48 CITY OF SPruNGFIELD, ONEGON Page 2 Surcharge/aamin PLUMBING Surcharge/admin SDC'S WILL BE PAID WITH NEXT PHASE OF PERMfT SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 0 2LO l_5 0 0 0 00 00 BO 00 00 00 frFafuzry*7,226 . BO LU4$J,#)??6.#TOTAL PERIIIT FEES EXCLITDING ELECTRICAL --- REQUTRED TNSPECTTONS --- It is the responsibility of the permit holder to see that al-I inspections are made at the proper time. To request an inspection, call 726-3759 (recorder), staUe your City designated job number, job address, type of inspection requested and when you wiLl- be ready for inspection. Requests received before 7:00 a.m. wil-l- be made the same working day, requests made after 7:00 a.m wil-l- be made the following work day. Special Inspections: In accordance wj-th Section 305 of the State Specialty Code a special inspector shall be employed by the Owner/Contractor during constructj-on of any following'r*r' work. A copy of the special testing reports shal-l- be furnished to Building Safety. In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, CiEy or Development Code. WATER LINE - Prior to fifling trench. SA.I{ITARY SEUIER LINE - Prior to filling tsrench STORM SEWER LINE - Prior to fil-ling trench. I --- A.DDITIONAI. COMMENTS --- PLANNER IS GARY KARP THIS PERMIT FOR INSTAI,LATION OF STORM, SANITARY AND WATER SERVICE PIP]NG ONLY Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 1,2/1,4/95 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that al-I information hereon is true and correct, and f furLher certify that any and all work performed shaI1 be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permissj-on of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that Lhe permit card is located at the front of the property, and the approved set of plans on the site at all times during construction tq 0s\ qt Signature 1l- rema Dat.e