Loading...
HomeMy WebLinkAboutPermit Mechanical 1991-08-26IELE, ESID ENTIAL RM IT APPL ICATION Off ice:Qfi, 225 Fifth Street Springfield, Oregon 97 JOB NUMBER R P 477 LOCATION OF PROPOSED WORK: ASSESSORS MAP TAX LOT:ad SUBDIVISION: ons: 7 PHON ztP"STATE:CITY: ADDFIESS: OWNER: NEW - REMODEL ADDITION DEMOLISH OTHER IDESCRIBE WORK: CONST. TRACTOR #EXPIRES PHONECONTRACTO,SN RESS€.rsZ G EN ERAL: PLUMBING MECHANICAL: - ELECTRICAL: - _ OFFICE USE _ QUAD AREA: C OF BLDGS: LAND USE:FLOOD PLAIN ZONING CODE: # OF BDRMS Final Electrical - When all electrical work is complete. * OF UNITS: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOURCE: WATER HEATER RANGE: SECONDARY HEAT: SQUARE FOOTAGE: To request an inspection, you must call 726-3769. This is a24 hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS f_l remporary Electric Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Underslab Plumbing/ Electrical/ Mechanical - Prior to cover. Footing - After trenches are excavated. Masonry - Steel location, bond beams, grouting. Foundalion - After forms are erected but prior to concrete placement. Underground Plumbing - Prior to filling trench. Underf loor Plumbing/ Mechanical - Prior to insulation or decking. PosI and Beam - Prior to floor insulation or decking. Floor lnsulation - Prior to decki ng. Sanitary Sewer - Prior to filling trench. Storm Sewer - Prior to filling trench. Water Line - Prior to filling trench. Rough Plumbing - Prior to cover. Rough Eleclrical - Prior to cover. Electrical Service - Must be approved to obtain permanent electrical power. Fireplace - Prior to facing materials and framing lnsp. Framing - Prior to cover. Wall/Ceiling lnsulation - Prior to cover. Drywall - Prior to taping Wood Stove - After installation lnsert - After fireplace approval and installation of unit. Curbcut & Approach - After forms are erected but prior to placement of concrete. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. I--l Fence - When completed Street Trees - When all required trees are planted. Final Mechanical - When all mechanical work is complete. Final Building - When all required inspections have been approved and building is completed. Other MOBILE HOME INSPECTIONS Blocking and Set-Up - When all blocking is complete. Plumbing Connections - When home has been connected to water and sewer. Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. B r r E r E E E E E E E r E r E E r E Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type vV - lnterior - Corner - Panhandle - Cul-de-sac Set PL.HSE GAR ACC N S E _,- E PFOPOSED WORK tN THE HIS-FORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? - lf yes, this application must be signedand approved by the Historical Coordinator prior to permit issuance. APPROVED: VALUE (A) X $/SQ. FT. Main Carport Garage Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SQ. FT. BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinanceadopted by the City of Springfield, including the Development Code, regulating the construction and use ofbuildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Receipt Number:_ Plans Reviewed By Date PIan Check Fee Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City Iimits which are being improved. ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (c) N0 FT. FT. FT. PLUMBING PERMIT Plumbing Permit State Su rcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Fireplace Unit Dryer Vent N0 /V/,7 ?G-2'(D) 4.n4rfra=. MECHANICAL PERMIT aa Fu rnace Ex-baus+-++eed- Vent Fan Mechanical Permit lssuance State Surcharge Total Permit By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I f urther certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain 7/ times during q on the site at al Sig natu re Date on. MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) .Z DATE PAID .€-?e-3 / EIVED VALIDATION: RECEIPT NUMBER AMOUNT REC RECEIVED BY Z ltta