HomeMy WebLinkAboutPermit Building 1999-03-31SPRINGF!ELD
RESIDENTIAL PERMIT APPLICATION
CTTY OF SPRINGFIELD
COMMI'NITY SERVICES DIVISION
BUILDING SAFETY
a
Page 1
Job Nurnber: 990325
225 North Fifth Street
Springfield, OR 974'77
Location of Proposed Work: 3491 WATER ILARK ST
Assessors Map #: L7021943
Lot : 4'7 Block:
Office
Inspection Line
7 26 -37 59
726 -37 69
Tax Lot #:
Subdivision:
o47 00
AMBLESIDE
SPilNGETEIT',
Owner: QUALITY HOMES
Address: P.O.BOX 22201
Describe Work: S/F RESfDENCE
Phone #: 543-5333
City/State/zip: EUGENE OR, 974O2
NEW
General
Mechanical
Electrical
ConEractor
QUALITY HOMES
7155 LAWNRIDGE ST
HOME COMFORT
705 OSCAR STREET
CROW VALLEY
Const.
Contractor #
EUGENE
PO BOX 2220L EUGENE OR
0a2201,8
NE KEIZER OR 9730
o0841-64
oR 97403000
009s910
97 4020000
Expires
04/25/eB
06/25/e8
01,/06/eB
Phone
393 -3171,
345-2838
129 - 51,08
QUAD AREA: 3RNC
OCCY GROUP: R3
HEAT SOIIRCE: G
OFFICE USE --
LAND USE: 1111
CONSTR. TYPE: VN
INSUL PATH: P1
# OF BLDGS:
# OF BDRMS:
SQ FOOTAGE:
1
3
1895
To request an inspection, call the 24 hour recording aL 725-3759.
A11 inspections requested before 7:00 a.m. will be made the same working day,
inspections requested after 7:00 a.m. will be made the following work day.
--- REQUTRED TNSPECTTONS ---
FOOTING - After trenches are excavated.
FOITNDATION - After forms are erected but prior to concrete placement.
ITNDERFIJOOR PLITMBING - Prior to insulation or decki-ng.
ITNDERFLOOR MECHANICAL - Prior to insulaLion or decking.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
IINDERFIJOOR DRAIN - Prior to cover or placement of concrete.
POST AIiID BEAI,I - Pri-or to f loor insulation or decking.
INSULATION - Floor,' prior to decking Wall/Ceiling; Prior to cover
STORM SEWER LINE - Prior to fil-l-ing trench.
SANITARY SEVIER LINE - Prior to filling Lrench.
WATER LINE - Prior to filfing trench.
ROUGH MECHANTCAL _ Prior To Cover.
ROUGH PLITUBING - Prior to cover.
ROUGH EI,ECTRICAI, - Prior To cover.
SHEAR WALL NAILING - Before covering sheathing with finish material-s.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking Wal-1/Ceiling; Prior to cover
DRYWATL - Prior to taping.
SIDEWALK - After excavation is complete, forms and sub-base material
in place.
CURBCUT - After forms are erected but pri-or to placement of concrete.
GAS SERVICE - After line is installed and l-ine has been connected to a
minimum of one appliance. Pressure test done at this point.
SPIIINGFIELE,
,Job Number: 990325
CITY SPruNGFIEIT',a
Page 2
FINAL PLIIMBING - When aJ_1 plumbing work is complete.
FINAL ELECTRICAL - When afl electrical work is compleLe.
FINAL MECHANfCAL - When all mechanical work is complete.
FrNAL BUTLDTNG - when all required i-nspections have been approved and
the buil-dj-ng is complete.
Lot Faces: N
House
Garage
Tot,al Height: 25
Setbacks
SWE
t2 1-4
Sol-ar Approved: Y
N
1B
ftem
Main
Garage
Total Val-ue
Building Permit Fee
Surcharge/admin
TOTAI, FEE
--- BUILDING PERMIT ---
Square Feet x
1,498
400
$/Square Feet
64 .56
r..5.27
(A)
Val-ue
95,851.00
5, 508.00
103,359.00
442 .00
35.35
477.36
--- PLI'MBING PERMIT
Item
Residential- Bath(s)
Plumbing Permit
Surcharge/Admin
TOTAL CHARGE
3
Fee
L92 .50
1,92
15
50
4L
(c)207.9L
--- MECHANICAL PERMIT ---
Furnace
Exhaust Hood
Vent Fan
Wood Stove/Insert / Fireplace Unit
Dryer Vent
GAS W/H
Mechanical Permit
Issuance
Surcharge/admin
TOTAL PERMIT
3
5.00
4.50
9.00
4.50
3.00
4 .50
(D)
31.50
10.00
2 .53
44 .03
--- MISCETLAI,{EOUS PERMITS
Surcharge/admin
Sidewal-k
Curb Cut
WILLAMALANE SDC
PLAN CHECK FEE
SPLFD SDC
TOTAL MISCELLAI{EOUS PERMITS
0
)1
a4
1, 000
90
2 ,385
00
10
95
00
00
(E)3,517.08
(Excluding Electrical )
unleEs otherwise noted
--- TOTAL AMOI'NT DUE ---
(A, B, C, D, and E combined)4 ,246 .38
SPRINGFIELO
Job Number: 990325
a
Page 3
--- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT
This permit is granted on the express condition that the said construction
sha11, in all respects, conform to t.he Ordinance adopted by the City of
Springfield, incl-uding the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon vj-oIat.ion
of any provisions of said ordinances.
Received By:
Pl-ans Reviewed By: BOB BARNHART Date: 03/29/99
Building Site Reviewed By: BOB BARNHART
--- ADDITIONAL COMMENTS --.
REQU]RES TEMP POWER PERM]T,
DRIVEWAY REQUIRED TO BE PAVED
3 STREET TREES REQUIRED
By signat,ure, I state and agree, that f have carefully examined
the completed application and do hereby certify that al-l- information hereon
is true and correct, and I further certify that any and all work performed
shalI be done in accordance wit.h the Ordinances of the Cit.y of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
and that NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further cert.ify that only
contractors and employees who are in compli-ance with ORs 701.055 wifl be
used on this project.
I further agree to ensure that all required inspections are requested at Lhe
proper time, that each address is readable from the street, that the permit
card is located at the front of the property, and the approved set of plans
wil-l- remain on the site at all times during construction.oz-/4 3-5/- ?vsignPrql i Date
Receipt Number:
Date Paid:
Amount Received:
Received By:
--- VAI,IDATION ---
77722
7.7/ -?7
CITY
SPRINGFIELD
a
Page 1
ENGINEERING DIVISION DEVELOPMENT PIJAI{ REVIEW
RESIDENTIAL IMPROVED STREET
Developer: QUALITY HOMES
Mail Address: P.O.BOX 222Ot EUGENE OP.,97402
Tax Lot #: a7O2L943O47OO Project Address:
Subdivision: AMBLESfDE Lot: 47 Bl-k:
Job No
phone #:
3491 WATER MARK ST
Eng. Rev. No.:
.: 990325
s43 - s333
Book
Street Gravel
3491 WATER MARK ST
Existing Curbcut: N
EXISTING IMPROVEMENTS
Ac Mat Curb Fu11 Tmp SW Width Curbside
Y 5 FEET 12:1 FLAIRS
Setback
ENGINEERING REQUIREMENTS
Additional Right of Way: N
Improvement Agreement: N
Easements: N
SANITARY SEWER
CALL THE UTILITIES NOTIFICATION CENTER BEFORE YOU DIG ]--8OO-332-2344
Avail-able: Y
Size of Line: 8
Location From N,
Make Connection:
Stubbed Out To Property Line: Y Depth: 4-6
fn. Tee: 5 In.
S, E, W PTOPETTY I,iNC: AS SHOWN ON DRAWING OR AS-BUILT
PER PLI]MBING CODE
FT
STORM SEWER
Awailable: Y
Pipe Downspouts And Draj-ns To: CURBS & GUTTERS
Pipe Parki-ng Lot Drainage To: N/A
SIDEWALK AND DRIVEWAY INFORMATION
New Curbcut Appr.: Y STANDARD Width: 21 Ft Fl-airs
Sidewalk Permit: Y Width: 5 Ft Length: 1-1-4 Ft
Curbcut PermiL: Y Width: 33 Ft
Handicap Ramp: Y SEE DRAWINGS
6 FT
ENCROACHMENT AI{D ASSESSMENT
Encroachment Permit Required: N
Sanitary Sewer In Lieu Of Assessment: N
SPECIAL NOTES AI{D REQUIREMENTS
AII- work within the public right of way shall- be in conformance with the CiLy
of Springfiel-d standard specifications for construction. A11 existing unused
curbcuts or portions thereof shalf be restored to fufl curb height as directed
by the City. The owner/developer is responsible to relocate any utilities and
establish private or public easements when the utllities confl-ict with the
development, at Lheir expense.
Reviewed By: MOLLY LINDBLOM Date: 03/L5/99
SEE DR,A,WINGS ON SPECIAL REQUIREMENTS FOR FURTHER IMPORTAI{T INFORMATION
JouRNAL oR JoB ru0. 9(0 3zS
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMTNT CHARGE
WORKSHEET
LOCATION:34 ot t ddkt rur^n V
DEVELOPMENT TYPE 5FD
BUILDING SIZE:t8q5 LOT SI Ft.
1. STORM DRAINAGE
ECzi) +1Lq+ tbl 'l 41i
IMPERVIOUS SQ. FT -t X $0.227 PER SQ. FT $3q +.53
2. SANITARY SEWER-CITY
NO. OF PFU'S '73 X $47.14 PER PFU $Z'L
(See Reverse Side)
3. TRANSPORTATION
NO OF UNITS X TRIP RATE X COST PER TRIP
X t.o I X $475.32 $ 4tu.d1
x $475.32 $
4. SANITARY SEWER-MI^IMC
A. REIMBURSEMENT COST:
NO. OF FEU'S x T11.14PER FEU $ T71,4
X
B. IMPROVEMENT COST:
N0. 0F FEU'S I X L5.?OPER FEU
MI^I]'4C CREDIT IF APPLICABLE (SEE REVERSE)
MlllMC ADMINISTRATIVE FEE
SUBTOTAL (ADD ITEMS 1,2,3 & 4)
ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE) X .05
s 2e.20
5
TOTAL-MWMC SDC
$ 10.00
$ 3lz,lo+
$ zz1l.1L
$ tt7,al
SDC Coordinator
ATTACH'A. l'lPD
Date: 3/r 5 I"r1
TOTAL SDC $ 2385 ,03
NAME OR COMPANY:
7{
A,r -
FIXTURE UNtT CALCULATION TABLE: Number of New Fixturc^ X Unit Equivalent : Fixture Units
(NOTE: For remodels, calculate only NET additional fixtures)
-NUMBER OF UNIT FIXTURE
FIXTURE TYPE NEW FIXTURES EOUIVALENT UNITS+
I
Bathtub.
Drinking Fountain
Floor Drain........
lnterceptors For Grease/Oil/Solids/Etc.............
lnterceptors For Sand/Auto Wash/Etc....-....-...
Laundry Tub/Clotheswasher.....
Clotheswasher - 3 Or More.....
Mobile Home Park Trap (1 Per Trailer)......
Receptor For Refrigerator/Water Station/Etc.-.-...
Receptor For Commercial Sink/Dishwasher/Etc..
Shower, .Single Stall.........
Shower, Gang......'...........
Sink: Bar, Commercial, Residential Kitchen.........-.
Urinal, Stall/Wall...
Wash Basin lLavatory, Single.
Toilet, Public lnstallation...
Toilet, Private.......
Miscellaneous:
il
-ilr-/lt
TOTAL FIXTURE UNITS
/Head
2
1
2
3
6
2
t)
6
1
3
2
1
2
2
1
6
4
--T-
_T-
_7-
-R-
B-
CREDIT CALCULATION TABLE: Based on assessed value. lf improvements pccurred after annexation date in table,
calculate credits
Credit for Parcei or'Land Only tf Applicable
lmprovement (if after annexation datel
x$'
(Rate X Assessed Value)x $- =
(Rate X Assessed Value)
CREDIT TOTAL $
Year
Annexed
Rate per $1,OOO
Assdssed Value
Year'.
Annexed
Rate per $1,OOO
Assessed Value
1 989
1 990
1 991
1 992
1 993
1 994
'i".t .1995
1 996
1 997
$1.98
1.55
1 .15
o.96
o.83
o.67
o.52
o.3B
o.21
1979 or before
1 980
1 981
1982
1 983
1 984
1985'"; 'r ! -
1 986
1 987
1 988
$4.27
4.18
4.12
3.99
3.83
,3.68
3.48
3.18
2.82
2.42
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For Estimating Purposes Onlyl
Residential.
Commerical
lndustrial...
Governmental.
o.4
o.9
o5
o.5
FIXUNIT.WPD TMPERVIOUS AREA : TOTAL LOT SIZE X RUNOFF COEFFICIENT
-T--
:
€$Willamalane
Park & Recreation District Job- No.595
SYSTEM DEVELOPMENT CHARGE
NAME:
WORKSHEET
(}AIA,
ADDRESS:PO ot STATE:ZlP:t T^ton"-'
LOCATION OF PROPOSED BUILDING SITE:
Street Address:3.1q I tJssb^-1[.r'^k \x
Ptat Narne' [?OAt qata Tax Lot Number:O{ 7r
PHoNE: 5q3€333
1 DEVELOPMENT TYPE (Check
ype definitions are on the back.)
:
A. Single-Family Detached
F Single Famity home
NO. OF UNITS
appropriate dwelling(s). SDC calculations and dweiling t
Manufactured home not in a park
qe_
X $1,000 per unit = $\ (xro
B. Single-Family Attached
NO. OF UNITS X $924 per unit
C. Multi-Family Apartment
NO. OF UNITS X $692 per unit
D. Manufactured Home Park
, NO. OF UNITS
WILLAMALANE SDC
X $699 per unit
2. SDC CREDIT (if appticabte) SDO-payer must fumish proof of
Wiltamalane Credit approval. See SDC Credit Worksheet.
3. TOTAL WILLAMALANE NET SDC ASSESSED
(if SDC reduced for Credit)
lopment Services
$
$
$
-7t-2
$
$
$,/a42^-n
City of Springfield
Department Date
u
(.
CITY OFSPR OPEGO'V
SP. iFIELO
lhe tollowhg prolectas submittecl has the followino
ronrng. and do6s not require specific land use -
approval
Zonlng /-Dr"-
225 FIFTE STREET
SPRINGFIELD, OREGON 974
INSPECTION REQT EST ? 726sgl69d Sisnature
OFFICE: 726-3759
1
I,EGAT\-roB DESCRTPTIONtq{s01(:l@
5 PERHIT APPLICATION
Job Nunbe. q1 hsss
3. COHPIJTE FEE SCEEDUI.,E BELOV
Nev Residential-Single or
Hulti-Family per dvelling unit.
Service Included:Items Cost
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereo f
Each Manuf'd Home. or
-Modular 'Dwe1ling
Sertice or Feeder
$ 8s.00
s 1s.00
$ 40.00
Services or Feeders
Installation, Alterations
or Relocation:
200 amps or less
20L amps to 400 amPs
-
401 amps to 600 amPs
-
601 amps to 1000 amPs-
0ver 1000 amps/vo1ts
-
Reconnect OnIY
c.Temporary Services or Feeders
Installation, Alteration or Relocation
200 amps"or less S 4g.9q 5Oy
over 4b1 to 6oo amps
-
S Bo.oo
-0ver 600 amps or lbOO voms see "Bu a56lE
Branch Circui ts ; .-
New, Alteration or Extension Per Panel
One Circuit $ 35.00
Each Additional
Circuit or vith Service
or Feeder Permit
-
$ 2'00
Miscellaneous (Service/feeder not included)
D
E.
-Each installation
Pump or irrigation
-
Sign/0utIine Lighting-
Limited EnergY/Res
-
Limited EnergY/Comm
SUBTOTAL OF ABOVE
52 State Surcharge
32 Administrative Fee
TOTAL
Date
77
DESCRI \B1S+
Permits are non-transferable and expire
if vork is not started vithin 180 days
of issuance or if vork is suspended for
180 days.
2. COIITRACTOR INSTALLATION ONLY
Electrical Contractor
Address ('0' Bo,, ?A?qI e,
&SkJric-
citv €,Ackt, dq7/ot Phone 59?-6371
Supervisor License Number 3a J"'S
Expiration Date
Constr Contr. Number 7S?tc
Exp iration Date o
Signature of SuPervising Elect rtcr:rn
A
B
Sum
ecP
3qQ
s s0.00
s 60.00
$100.0Q
s130.00
s300.00s 40.00
0vners Name
Address
Ci tv Phone
OVNER INSTALLATION
The installation is being made on
property I ovn vhich is not intended
for saIe, lease or rent.
Ovners Signature:
s 40.00
$ 40.00
$ 20.00
$ 36.00
DATE:
RECEIVED
5 5,c4"
This permit is required for any site activity in the flood plain and everywtrereflfty (60) cublc yards of materlal or more and/or if a dralnagoway ls aifected,
.i-t&
PFINOAII.t'
Thls Slde To Be Fllled Out by Appllcant ,t
slte altgratlon consists of
wlthln olty llmlts and
33r
41
iQ-
0fii,4.
Sprlngfiold,
c State
ntdl-'A-!_ Slql Daf%Orogon
Date of Applicatio
Site Address:
Property Owner
Address :
Permit Expiration Date:
Phone:
tr Tax LotUGB Tax Map No
Journa I numbor applicable Land Use Application
tr
Ftr
Source Location
Materlal
Destination:
Project Supervls or
Phone'.-
GRADING, Ouantity
FILL, Ouantity
Supplier
Supplier:
Address
EXCAVATION, Ouantity
E
tr
tr
tr
tr
tr
DRAINAGE, POLLUTION AND EROSION CONTROL PLAN
es
ITES P andot
nd
CROSS SECT]ONS,
ADDITIONAL INFORMATION,
REPLANTING PLAN
SOILS & GEOLOGY PLAN,
, PHOCOMPANY NAME: .
PHONE
ctry STATE
COMPANY NAME
CITY . STATE
PROJECT SUPERVISOR:
ADDBESS:
PROJECT SUPERVISOR:
ADDRESS:
MOBILE PHONI: *W<-, . , EMERGENCY PHONE
FAx *qfr/??6OFFICE PHONEATP;ST E zb^- t
CONTRACTOB NAME:
PROJECT SUPERVlSOR:
r:Explratlon Date:
PHONE
CITY:
Registration Nqmbe
ADDRESS: fb
l.undprstand that Ior mY succossors may have future plans for my propeny whlch may bc antlcipated or unsntlciDatod 8tthis tlmo. I und€rstahd that such future plans may require permits'ahd devdlopement abprovale fiom thc Cltv oiBbrt-nsneiaI understand that notwithstanding any approval of this Lan'd and Dralnage Ahbratlon pdrtnh:tLoAFi, tiiii ititre-tiH;'a?'----tqq!rytjol gf luturc- g9rgps.o1-aporovalb'the city may ro-view and recoistoei itiicitoni'*-trtctr tbilmv iuiiiiidii'iri.l"undertal(on persuant to thls LDAP. I undorstand that th€ City may as a condltlon of any future aoorovll, reoulre theundoing, changing, or modification of any actions which I hivo uhdertaken as r resuh bf the chyts appiova-t df tiiti loep,
F
-l
rv
--I.IJo-
Zo
-rF
fvrlri
IJJFJ
I,IJ
L]
Z
tsl
fvl--tc
oZ
oZ
5
By signaturo., I state and agreo, that I haio carefully oxamined the completed rFplicatlon and do hereby certify that a1information horein is truo and. corr-oct, and lfurther'certify that any and ait woiti-pertdlrirod;hall 6; d;iainidcoiJiicewith the ordinancos of tho City of Sprinsfield, applicable'C-ity Stendard ipeCtiicliioriJ'init-O-iiri;tnssliniitrilivii 6i tiestate.of oreson p_ertrlnlng 1o_lho.wdrk dlscribed'herein. I fuithor certttv [tiai'inti6;tr;ct&;;;if;h;6ft;'i;ir;;r;'i;compliance with ORS 701.056 will be used on this project.
I['-g!i'r',Ji?[,i]T:f.*fiirt^'l,i.flT:lil.',r'L'Hl-i:Tj'"T"'"?,rrj[,#'&,t i'.1[t"T,T:1,,!"t.1:yl]t##.,'.r$:1J,,""work requir€d to r€turn.tho site to.a standard acceptable to fhe City. The pe6irinee wltiUe noiiite,irlri'writiiri-Jilhvft;i-'requtreo 8no wtl n8v0 tniny l3o) days from ths dat6 of tho notlcs to..complctc tho work. work not complete-d at th'e end ofthe thinv days will be perfdrmed by'th€ city and the cosrs will ue uittio i5 iti; ffmitfi.
Rl-
addrese ls readable from
//Date
at tho propor tlme, that proiect
all tlmes durlng construalohr
3-)-
site at
furthe onsuroto atthagroo
tha Istreot,nd
Signature
uired i
pla
b e 7 qD3)n
-5-{
T
andof
Areas
trd
Htr
t5
Date:
qZ
FLOODWAY, FEMA Community Panel No.:
FEMA Community Panel No.:
O Culvert, El Natural
FLOOD PLAIN, Zone:
DRAINAGE, El Storm, O
WETIANDS, Description
$40.00 For the first 10,000 cubic yards, plus
$20.00 for each additional '10,000 cubic yards or fraction thereof
$220.00 For the first 100,001 cubic yards, plus
$20.00 for each additional 10,000 cubic yards or fraction th6r6of
$340 For th6 first 200,001 cubic yards, plus
$6,00 for each additional 10,000 cubid yards or fraction thereof.
$ 1 4,00 for each additional 1 0O cublc yards or fraction thereof.
$156.00 For the first 1,000 cubic yards, plus
$ 1 2.00 for each additional 1,000 cubic yards or fraction thereof.
9264.00 For the first 10,000 cubic yards, plus
$54.00 for each additional 1 0,000 cubic yards or fraction thoreof
$750.00 For the first 100,001 cublq yards, plus
S30.00 for each addltional 1 0,000 cribic yards or fraction thereof
$30
3{zlnKb
.bg"oD
Date:
tq 1'r%L
Date:
Receipt Not%015
Receipt Not O34 tVZ
37r,.oo
?
orr",3fZf? 7
s^r", s lztl<
2OO,OO1 CUBIC YARDS OB MOBE
Estimated Volume:
Plan Check Fee:
For the first 100 cubic yards, plus
Grading Permlt fee:
Received by:
GRADING PERMIT FEES:
UPTO 1OO CUBICYARDS
, 1ql To 1,000 cuBlc YARDS
.1
1,001 TO 10,000 cuBlc YARDS
1o,ooo ro too,ooo cuBlc YARDS
1oo,oo1 To 200,000
PLAN CHECK'FEES:
UP TO 1OO CUBIC YARDS
101 TO l,OOOCUBICYABDS
1,001 TO 10,000 cuBlc YARDS
10,000 To 100,000 cuBlc YARDS
100,001 To 200,000
@
$30.00
$40.00
neceireO ey:
wtr
tr
tr
Date:
Date:
'Date
D
Mbintenance:
Building:
. Engineerlng
Planni
lssued by:Date:Pe rmit Number
Re+llrerl Final lnspeetions.'
"Malntenancri:
Date
Date:
Planning:
Engrneenng:
Building:
Date
Date
FEI
fvIrrl
IJJo-
Zo
EIF
rvEII
IJJFJ
IJJ
U
Z
-lfv
-rtc
cZ
nZ
5 E]
n
tr
Land and Dralnage. activity.as outlined in this permit has been completed in accordanco withthe provlslons ofthls permit,
!-qfLd.e#-DJginpgo^qqtldty a-s-ouJlined in this permlt has not been completed in accordancewrtn Ine provlslons oI tnrs permtt.
Land and Dralnage activity was performed prior to application for this permit,
Accopted by:
-
Date:
1/6/1998
t
Gity of Springfield
Memo
To: File
From: Don Moor,e
GG:
Date:06/09/99
Re: Tele. Conversation w/ Jeff Coffee re: 349'l Watermark
City Building Permit #990325
Today, I spoke with Jeff Coffee regarding requirements for drains at the subject
p.p"rty. i previously talked to Bill Shaub about his observation that no perimeter
iooiing'drains exist around the building. I told Bill that we could not require such
drains] but we should strongly recommend their use in an attempt to stabilize the
moisture content of the soii under the buildings. This treatment should minimize
potentialfor soil expansion and contraction. I also explained this to Mr. Coffee'
Mr. Coffee was not concerned about the soil conditions since he had used the
services of Branch Engineering to review the soil stability, and the engineer did not
make such a requirement. He was more concerned with the underfloor drain, which
he said is located below the street gutter elevation. He wanted information on
methods of installing a sump and drain for such conditions. I suggested that he talk
to the city Plumbing inspector regarding such installations.
I mentioned to Mr. coffee that we now have written information from the soils
engineer for the subdivision recommending the use of perimeter drains to maintain
constant moisture content in the soil undLr the buildings. I also told him of the
problem that the public Works Dept. recently had with differential movement under
areas of 35th street. He said he was aware of that problem, which was near his
construction project, but he does not believe that a similar condltion exists on his site'
o Page 1