Loading...
HomeMy WebLinkAboutPermit Mechanical 1991-08-22SPRINGFIELD RESID ENTIAL PERMIT APPLICATION lnspections: 726-3769 Office: 726-3759 JOB NUMBER zfr, 225 Fifth Street Spri ngfield, Oregon 97 477 LOCATION OF PROPOSED WORK:5- ASSESSORS MAP:TAX LOT: LOT BLOCK:SUBDIVISION ),l OWNER:BoO r(eePtc,lz PHONE:72C--;-//7 ADDRESS:3 2 5 ltfozryA -97* CITY:sH.14 1.€(4 STATE:o4c ztP 7 7rztr DESCRIBE WORK:Nc w {a r.t4// C Orl S f- ,4n/.4. e-6 /f s fi/2.<ro lra7)a2 NEW - REMODEL ADDITION DEMOLISH OTHER CONTRACTOR'S NAME ADDRESS CONST. CONTRACTOR #EXPIRES PHONE GENERAL: PLUMBING MECHANICAL:Cin/a'/ y'e,r7116 q 7 07 t4)-'7?/ 7 og /g / 2- z/-?/ s r/l-zytr/ ELECTRICAL:Fy //oa,,r€ oilr'/r?f _ OFFICE USE _ OUAD AREA: * OF BLDGS: LAND USE: # OF UNITS FLOOD PLAIN ZONING CODE: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOURCE: # OF BDRMS WATER HEATER:RANGE: SECONDAFIY HEAT SQUARE FOOTAGE: To request an inspection, you must call 726-3769. This is a24hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS Temporary Electric Rough Mechanical - Prior to Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover, Underslab Plumbing/ Electrical/ Mechanical - Prior to cover. Electrical Service - Must be approved to obtain permanent electrical power. JV finat Mechanical - When all Anechanical work is complete. Footing - After trenches are excavated. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting.Framing - Prior to cover. flottrer &3 ',tL*E Foundation - After forms are erected but prior to concrete placement.Wall/Ceiling lnsulation - Prior to cover. Underground Plumbing - Prior to filling trench.[--l Drywall - Prior to taping MOBILE HOME INSPE TIONS Underf loor Plumbing/ Mechanical - Prior to insulation or decking.Wood Stove - After installation Post and Beam - Prior to floor insulation or decking.lnsert - After fireplace approval and installation of unit. Blocking and Set-Up - When all blocking is complete. Floor lnsulation - Prior to decking.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Water Line - Prior to filling trench. Street Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed.Rough Plumbing - Prior to cover. E l-l Fireplace - Prior to facinglJ materials and framing lnsP. E E E E tl E [l Fence - When completed. Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot l-;Y - lnterior - Corner - Panhandle - Cul-de-sac Setbacks PL.HSE GAR ACC N S E IS .E PROPOSED WORK IN THE HISTORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? - lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED VALUE (A) X $/SQ. FT. Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SQ. FT. Main Garage Carport BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Reviewed By Date Fleceipt Numbe Plan Check Fee: Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtu res Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home N0 FEE FT. FT. (c) PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ Insert/ Fireplace Unit Dryer Vent ZL /r1/4) /zr (D) @a 2-92A No 2uo Vent Fan Mechanical Permit lssuance State Surcharge Total Permit /5*1D'€ MECHANICAL PERMIT Fu rnace Exhaust Hood By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front d the approved set of plans will remain Signature Date t-zz'1/ of the property, on the site at mes d ng truction. MISCELLANEOUS PERMlTS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) z--{"--ft 2,to 77ts-22 -?/DATE PAID AMOUNT FIECEIVED RECEIVED BY VALIDATION: RECEIPT NUMBER FT.