HomeMy WebLinkAboutPermit Building 1994-12-02t/SPFtINGFIELElRESIDENTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:D2
JOB NUMBER
225 Fifth Street
Sprlngfleld, Oregon 97 471
?;: a
JT j
LOT:
-
BLOCK:
TAX LOT:
SUBDIVISION: _
T
26^ 66PHONE:
i.r I
\<(
ZIP:
o
STATE:C)Q.CITY:
ADDRESS:
OWNER:
NEW
-
REMODEL -,x-- ADDrroN DEMOLTSH orHER
{1< uc:A<-:t RGL.ola.)SL1a U24DESCRIBE WORK:
ADDRESS EXPIRES PHONE
R.t(, !\ELECTRICAL:
CONTBACTOR'S NAME
GENERAL:U.sw<,R
MECHANICAL:
PLUMBING
CONST.
CONTFIACTOR #
- OFFICE USE -
WATER HEATER:
LAND USE:OUAD AREA:
* OF BLDGS:
SECONDARY HEAT:
SQUARE FOOTAGE:
# OF BDRMS: .--...--
RANGE:
OCCY GROUP:
* OF STORIES:
FLOOD PLAIN:
CONSTR. TYPE:
HEAT SOURCE:
# OF UNITS: _-ZONING CODE:
To request an rnspecilon, you must cail 726-376g. Thls rs a 24 rmade the same worklng day, lnspections requested after 7:00
[-_l remporary Etectrtc
hour recordlng. Alr rnspecilons requested before 7:00 a.m. wilr bet a.m. wlll be made the followlng work day.
REQUIRED !NSPECTTONS
Slte lnspectlon - To be madeafter excavatlon, but prior tosettlng forms.P{;;s,:
Etectrical - Prior to
I--l Understab piumblng/Etecrricat/
-
Mechanlcal - prloi to cover.Electrlcal Servlce - Must beapproved to obtaln permanent
electrlcal power.Footlng - After trenches areexcavated.
Rough Mechanlcal - prior to
cover.
Wall/Celllng tnsulatlon - prlor tocover.
l--l Flnat plumbing - When ail
-
plumblng work is complete.
ffi flnat Electrlcal - When ailZteqlectrical work is complete.
[-l Flnal Mechanlcat - When ail
-
mechanical work is complete.
flrinal Buitding - When ailflVequlred lnspectlons have beenapproved and building iscompleted.l--l fUasonry - Steet ,ocailon, bond
-
beams, grouilng.
Foundatlon - After forms areerected but prlor to concreteplacement.
Underlloor plumblng/ Mechanlcal
- Prlor to lnsulatlon or decklng.
Post and Beam - prlor to floorlnsulatlon or decklng.
Floor lnsulatlon - prior todecklng.
Sanllary Sewer - prior to flllingtrench.
[l Storm Sewer - prior ro filting
-
trench.
Water Llne - prlor to filllngtrench.
Rough Plumbing - prior tocover.
[-l Flreplace - prtor to factng
-
materlals and framing lnspl
,Stt"-lng - Prlor to cover.
[-l Underground p]u
'- t"'ln;;;;;Jil."-blns - Prior
,!oo*au
_ prtor to taptns
l-l Wood Srove - Afrer tnstailation
fl 1n":t, - After ftreptace approval
-
ano tnstallatlon of unlt.
Curbcul & Approach - Afterforms are erected b(rt prior toplacement of concrete.
Sidewalk & Drlveway - Afterexcavation is completo, formsand sub-base materlal in place.
Fence - When completed.
MOBILE HOME INSPESTIONS
I Alocking and Set.Up _ When alt.J blocklng is complete.
Plumbing Connectlons _ Whenhome has been connected towater and sewer.
Electrical Connection _ When
P]99kilg, ser.up, and plumbinfrnspections have been approvedand the home is connected tothe servlce panel.
fll Street Trees - When ail requlred
-
trees are planted.
Final - After ail requiredtnspections are approved andporches, sklrilng, decks, andventlng have been installed.
a
[-l otner
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total helght
Lot Typ
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
ks IS THE PROPOSED WOBK TN THE ,
HISTORICAL DISTRICT, OR ON
THE HISTOBICAL REGISTER?
-
lf yes, thls applicatlon must be slgned
and approved by the Historlcal
Coordinator prlor to permit issuance.
APPROVED:
GAR ACCPL.HSE
N
S
E
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordlnance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Receipt Number:-
Plans DateBy
Plan Check Fee:
Date Paid:
Received By
Total Value
Building Permit Fee
StateSurcharge'?f +'1f
Total Fee (A)
VALUE
2au,/Ar,toD*L-
€l5 4
/o ze
X $/SQ. FT.
/70
Garage
Carport
BUILDING PERMIT
ITEM SO. FT.
Main
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)p,/A
ADDITIONAL COMMENTS
,KI 724/A2il
ITEM
Fixtures
Residentlal Bath(s)
Sanitary Sewer
Water
Storm Sewer
Moblle Home
FEE
(c)
N0
FT.
FT.
FT.
PLUMBING PERMIT
Plumbing Permit
State Surcharge
Total Charge
Wood Stove/ lnsert/ Flreplace Unit
Dryer Vent
MECHANICAL PERMIT
(D)
N0
Mechanical Permit
lssuance
State Surcharge
Total Permit
Furnace
Exhaust Hood
Vent Fan
By slgnature, I state and agree, that I have carefully examlned
the completed application and do hereby certlfy that all
lnformatlon hereon is true and correct, and I f urther certlly
that any and all work performed shall be done in accordance
wlth the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertainlng to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Divislon'
I further certify that only contractors and employees who
are in compliance with ORS 701.055 will be used on this
proiect.
I further agree to ensure that all required lnspections are
requested at the proper tlme, that each address ls readable
from the street, that the permit card ls located at the front
of the property, and the approved set of plans will remaln
><-,Slgnature
?r'Date
on the site at I times during construction.
12 -2-
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk -- ft
Curbcut ---- ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)@
;/,;Z
DATE PAID
AMOUNT RECEIVED
RECEIVED BY
VALIDATION:
RECEIPT NUMBER
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Comblned)
/r Zar'@-
rl
N /,p
SPRINGFIELc,
The followirrg :. r.rzoning, and L ,o, ,
225 FIFTB STREET APPTOVAI.
SPRINGFIELD, OREGON 97477 Zoning* Ll>C
0il62_t;g-q.If-
A&rorbed Signaturey'
i ^a.he
INSPECTTON REQUEST.. 72
OFFICE: 726-3759
1 ON OF TION
IJGAL DESCRTPTION
z-
JOB DESCRIPTION
Permits are non-transferable and expire
if work is not started vithin 180 daysof issuance or if.vork is suspentled for
180 days.
2.., CONTRACTOR INSTALLATTON OT.ILY
Electrical- Contractor
Add ress
ci ty- Phone
Supervisor License Number
Expiration Date
Constr Contr. Number
Expiration Date
Signature of Supervising Electrician
..t
Ovners
Address
Name e
Ci ty Job Nurnber
E+ COHPLETE FEE SCmDI,LE BELOV
A. Nev Residential-Single or
MuIti-Family per dvelJ-ing unir.
Service fncluded:
I tems Cos t
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manuf'd Home or
-
Modular Dvelling
Service or Feeder
s 8s.00
s 15.00
s 40.00
Services or Feeders
Installation, Alterationsor Relocation:
,J uge
SUBTOTAL OF ABOVE
5Z State Surcharge
3Z Administrative Fee
TOTAL
ELESTRICAL PERHIT APPLICATION
?/1 DG G
Sum
B
200 amps or less S201 amps to 400 amps
-
$
40L amps to 600 amps
-
$
60L amps to 1000 amps- $over 1000 amps/volts
-
sReconnect Only $
50
60
100
130
300
00
00
00
00
00
0040.
ci
OIJNER INSTALLATION
The installation is being made onproperty I ovn vhich is not intendedfor sale, Iease or rent.
Osners ignature:
Phone 7 2r.4 c lr
E
Temporary Services or Feedersfnstallation, Alteration or Relocation
200 amps or less S 40.00
20L amps to 400 amps
-
$ 55.00
-0ver 401 to 600 amps
-
S S0.00
Over 600 amps or 1000-vofts see uBu aEiEE
Branch Circuits
Nev, Alteration or Extension per panel
one circuit Z/S 35.00 ?<.d?Each Additional re
Circuit or vith Serviceor Feeder Permi t s 2.00
Miscellaneous (Service/feeder not included)
-Each installation
C
5
Pump or irrigation
Sign/0ut1ine Lighting-
Limi ted Energy/Res
-
Limited Energy/Comm
s 40.00
s 40.00
s 20.00
s 36.00
DATI:
RECEIVED B
5 ?{ oo'e) r__L4F_
37%
(
Permit #:
Address:31es
Issued by:Date:z
Statement: lnformation Notice to Property Owners
About Construction Responsibilities
Note: Oregon Law, ORS 701.055(4), requires residential construction permit appli-
cants who are not registered with the Construction Contractors Board to sign the
following statement before a building permtt can be issued. This statement is required
for residential building, electrical, mechanical, and plumbing permits. Licensed
architect and engineer applicants, exemptfrom registration under ORS 701.010(7),
need not submit this statement. This statement will be filed with the permit.
Fill in the appropriate blanks and initial boxes I and2, and either box 3A or 38:
l. I own, reside in, or will reside in the completed structure.
2. I understand that I must register as a construction conftactor if the structure is sold or offered for sate
before or upon completion.p
3,A,. My general contractor is _
(Name) Contractor regis. #
I will instruct my general contractor that all subcontractors who work on the structure must be
registered with the Construction Contractors Board.
w 3B. I will be my own general contractor.
If I hire subcontractors, I will hire only subcontractors registered with the Construction Contractors
Board. If I change my mind and hire a general contractor, I will contract with a contractor who is
registered with the CCB and will immediately notify the office issuing this huilding permit of the
name of the contractor.
I hereby certify that the above information is correct and that I have read and do understand the Information
owners about construction Responsibilities on the reverse side of this f6pp.
/z-z-/
of permit
(White copy to issuing agency pennitfile,
pink copy to applicant)
OR
Notice to
(Date)
/
6ra)za,
'!.\
ilnf0rmatidn Notice to Property Owners
About Cons.truction Res pon sibilities
lcre-i {hi,s l4forntarion Nottee.to Pqoperry Owners gbout Constrilctiaa Responsibili
\'oS).
"]rrtoped
by the toinstruction' Coitractors Board in accordan.ce with ORS 7At.ass{5).
ll. you are acting as ),our own contractor to cofistruct a new homc or nrake a substantial improvement to an cxisting structure,
yolr can prevent many problems by being aware of the foliowing responsibilities and areas of concem.
EM PLOYER RESPONSI BILITIES:
If you hire persons not registered with the Cgrutrr:c1ion Qq4tractors Board t9 do.labol in conqtructl!$.or assisting in the
construction or improvement qf a residential structure, yoq will, in most.instances, be rqled tobe ag empJgyer and the people
you hire will be emplbyees. As the employer, you must comp{Y with the following:
Oregon,s withholding tax law: As an employer, you must withhold income taxes from employe'ei wages at the time employees
ur" puia. you will be-liable for the tax payments even if you dont actually withhold the'tax from your'einployees. For more
information, call the Oregoti Dept. of Revenue at g45-8091 ' ': '.
Unemployment insurance tax: As an employer, you are required to pay a tax for unemployment insurance Pu{poses on the
*og", of ull employees. For more information, call the OregonEmployment Division at the Defiarhenrof Hurnan,tasourc€s
Workers, compensation insurance: As an employer, you are subject to the Oregon Workers'Compensation Law, andtr{us}
obtain workersicompensation insurance for your employees. If you fail to obtain workers'comlrciYtiT tsu{u.9": you$
besubjecttopenaltiesandwillbeliableforaltclaimcostsifoneofyouremployeesisinjuredonthejob. Formoreirformqtift;
call the Workers' Compensation Division at the Department of Consumer and Business Seivices at9+S-Zgga.
U.S.Internal Revenue Service: As an employer, you must withhold federal income tax from employees'wages. You will be
n"d;;thr "- puf*"nt
"uen
if you didn't aciually withhold the tax. For more information, call ihe Intemal Revenue Service
at l-80G829-I040.
OTHER RESPONSIBILITIES AND AREAS OF CONGERN:
Code compliance: As the permit holder for this project, you are responsible for resolving any failure to meet code requirements
that may be brought to your attention through inspections
Liability and property damage insurance: contact your insurance agent to see if you have adequate insurance coverage for
accidents and omissions such as falling tools, paint overspray, water damage from pipe punctures, fire, or work that must be
re-done.
Time to supervise employees: Make sure you have sutficient time to supervise your employees.
Expertise: Make sure you have the expertise to act as your own general contractor, to coordinate the work of rough-in and finish
trales, and to notify tuitoing officials at the appropriate times so they can perform the required inspectiorls.
If you have additional questions, write or call the Construction Contractors Board (PO Box l4I4A' Salem, OR 97309-5052'
5031378-4621). The Board is located at ?00 Summer St. NE Suite 300, in Salem.
prop-own.pm4
1t94