HomeMy WebLinkAboutPermit Building 1990-06-29.. RESID,*JTlAL..
APl'LICATION /PERIIIT
225 North |th Street
Springfield, 0r.egon 97477
Building Diuision
7 26-37 53
t#
SPFTINGF!ELD
tAGE
Date
General
Plumb
I.lechanical
ect
Srr
1r 55;duYnsqWf '-72
ll
El-ec tr ].an
I-t is the teeponaibi-Lila o7 tte perrrit holda to aee tlnt alt inspectiow ate nade at the prope? tine, that eceh addrees is reaCabiefran tle atreet, and tlat the pernrit cati ie laated at the frcni of the orooetht.*Building Ditticion apprw^ed p|^an-slnll remain on tlte Bunlding site'at aLL'tikes.-
PROC9DUPE FoR rnSPEcrI1W 4!).WSf:CALL726-3769(yecordet) state Aow, City designated job ntmbet,, iob aCitess, type of inspec=icneaaujo1i,lspection,coi*a.loi"-,,almer,sttc,neand'p7nneru,onbet,.Requestsleceixedbefcre7:00c,tiZZ be nwde the eane dcg, ?eqrcsts nade aft* ?:00 on vLLL be nade the nezt:nrkiS d.ay.
SfiE INSPEC?I)N: To be nade after
ercaoation, but priar tc eet up of
fotms.
ANDERSLAB PLUMBING. ELECTRICAL &
]ECHAIIICAL: To be nade befot,e any
uork ie caered.
FOOTIN} & F)UNDA?ICN: To be naCeafiet -trenehes are-eceaated and
forms are erected, but priot, to
pourtng ccncrete.
Io of
fLoot or decking.
nade
FTilAL PLUII,BITIC
FINAL MECHANICAL
FINAL ELECTRICAL
Iout, Ci,ty Deei,gr,ated Job Nwnber fs:
TNSALA?TON/VAPOR BARRTER IIISPECIJON :DEMOLTTI)II 0R !.!OW' BUIo be nade after aLL insulati-cn e.l.
z,equired uapor boriers @e in pl.aee
but before ory lath, gypsun bcatC ot,
tnLL eooering is appli.ed, atd. befote
oty insulation is concealed-
Scnitary eeuer capsped at properf,i Line
Septic tank pttryed and fi.Lled trith gratel
Final - l{hen abcoe itens ax'e ccrnpleted
and uhen Cenclition is conplete o" stra3-
tut,e motsed otd. prenrLees cleaneC up.
tr
X
AND9RGROAIID PLUI.{BINC. SE'IE , WATER,
DRAIIIAGE: To be nade prior to fil-:==- .LLr4 trenchee.
DRWALL IilSPECII)N: Tc be nade
-.
aftez, aLL dtyuall is in place,
but prion to cng taping.
ILAS1NRI: Steel Location, bond
beons, g:routing or uerticals in
accordotce ?iith U,B.C. Section
241 5.
IIOODSTOYE:
anpleted.
Aftet installation ie
Le llcmes
Blocking otd Set-up
Plunbing connectione -- aar)e? od. uaterK
P1SI AND BEAM: Io be nade prlor toGitffiDioy floor irnu|ation or
deckirq.
. these inspections hnoe been
ard.,approued.
CURB & APPRCACH APPON:
d,e e"ectAE;nAo"Electrtcal Ccnnection - Blocking, aet-uz
and plunbing connections mtst be apprct;ed
before requeeting eleclrieal inspeelion
Accessory* Builcing
Aftet fortnsto pouting
coTterete.
SID4WALK & DRf',8'l,lAI: For aLL ccn-cretenAfrA|E; stz,eet right-
of-teA, to be made afte? aLL etca-
oating canplete & forn oork & sub-
base rmterial in place.Firnl - After
etc, ate eomp
pcrch.es
Le'.ed.
skitting, decks,FTPEPLACE: PrLor to placirq facing
matez,ials ard. befot,e froning inspee-
tion.
FR.!,1.'!IllC: lthtst be requested after
apptoual of rough plunbing, electri-
u,L & mechanieal. ALL roofing
bracLng & chittmegs, etc. rntst be
completed. lto ucrk i,s to be eon-
. eealed until this inspeetion lns'been trud,e anC appr.oted.
?EIICE: Vhen eonplete -- ProviCe
gates or nooable sections thnough
P.U. E.
ALL pno;ect conditions, such as the i.nstallation of street trees, conpleti.on of tie
required LanCsecping, cte., rmtst be satisfied before the BUILDINC FIIIAL ean be tequested.
Job Loeaticn:5
Aesessore Map #Ics Lot #
Subdioision:
Oumen:
1-1 LAddress:Phone:o o
t,lci 7 7
A9O g A"lal',lion
a" vr.,o(,!-!L
ltescribe hlonk:
RemoCel
4
Value
Le
fi ^*rroo,
//6)
Date of
r.e
Page 1 of 2
x
X
'ALL ILANHCLES AND CLEANOUTS MUST BE ACCESSTBLE, ADJUS?IIEIIT ?O BE I,IIOE I.T IIO CCST TO CIIY
tr
1q EINAL BUILDIN7: The Pinal Buitdin7 Inspeetion mtet be requested after the Fi,nal Plunbing
Ky Electrical, otd t'lechanical fnspeetions l14ue been made ard approoed.
L.C)G*
Bedtoons
JOB NO.a
Lot Sq. Ftg.
% cf Lct Ccoeraga
# of StorLes
Total Height
IopograPhY
Iotal
soLAR Aqc ESS REQ.-
Cr.
LCT TWE
_ Intet'ict
_ Cornet
_ Pcnlnnd.Le
ctuL-de-sae
Lot Faces -
AceessP. L.House Cdrage
North
FlreplaeeEast- lloodstou-eSouth
West
this pennt t is gtanted on the erpress condi'.tion tlnt tle
slnll', in all iespects, eonforn to the 7tdirnnce adop-ted
Spingfield, including- the Zoning CYd':.nance, regulating
&a "ZL of -buildings,- and mey be suapended o" "eookeC
at
Lati.on of @tA ptclisions of said Otdir'ances.
frJuslA /h) chatc rfr
L*s @ coL/ez'Fn
/w&/27 O//E
-- Fees --
TOTAL VALUE
Building PermLt
Iotal Clnrges
Value
l,lain
PLan
State -)D
3
said constmrction
6iy the city of
the ccnstructicn
cny time upon oic-
/ao/t
- 44,s'
t5,7eS.D.C. L.5 c
oo
Date Paid:
Receipt #
Building Volue & Permit
Plumbing Permit
No pereon shall constotct, install' alter. ot clant4e cnA nea-cr esi'sting -
ilriil,a or drainage s!9lq in ulnle or in patt, inLees such person is the
i.jif |o""n""o, oy"o uLlid pl*nbnr',s Lie-enie, eo:cept that a pe"sonma'! q
ptfiting uo,k to p"opnity ihi"t l, ouned, Leaeed or operated by the appli,-
cant.
ZL
CEARGEN0.
5o
3
Sarzi Sa,:er
63
ITEM
Pi.atures
Resil.zntial (1 bath)
Plutnbing Penit
Electricql Permit
Whet,e State Lan requites tlnt the eleetri.eal uotk be done by-tn ElectrLcal
contTactor, the elictrLcal portion of this pennit stull not be oalil until
the Label has been-si,-e(by thg gf,qa+ti:al !"ntract9r./
Permlt
2
Neut/Estend Circuits
Setoice
State
lotal
3 'oo
NC,FEE CIIARCEIT!M
oo
I
Mechqnicql Permit
l,lcodstotle
Vent Pot
klwat Hood
ts
PentLt fssuance
Mechanicel Pernrit
-- ENCROACHMEN? --
Sec,ritu Depoait
Stot,age
llaintenance
Perwit
Asbcat
Sida,talk
Fence
Electrical ta.bel
Mobtle Hane
P/-,W U. FA ,+NAq7/7A)f /5Ps
TOTAL A\,IOUNT DUE: */ 7b,/'
*
I HAW CAREEULLy EXAYfNED the eontpleted application fot permLt' and' do
hereby cert'tfy that aLL infonnation het'eoi i.s trae and' corteet, attd' f
furtkbr eertifg that any i"d ott uork perfor'ned slnll be dote in aceot-
dance "rtth the OtdinencLs of the City of'Sprtngfield, an7 the La,;a of the
State of 2negcn pertaining to the uork Ceseribcd herein, clld that N0 OCCU-
PANCt tlitl be na-d.e of any stntctune uithout petmission of the Suilding N-
uision. I funther irt+fy that otly contrac'toPs ad, .enplcgees uho are in
eonpliance uith CRS zol.-oss uiLL be used on thie project
,,G/r*
xTTE14290Z?,%,
Cd?Dort
A?-eessoru
// //b*
3
llatet
Tctal Charaes
Permit No:
Address:
lssued Date:
STATEMENT:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4), requires residential building permit applicants
who are not registered with the Construction Contractors Board to sign the
following statement before the building permit can be issued. Licensed Architect
and Engineer applicants, exempt from registration under ORS 701.010(7), need
not submit this statement. This statement will be filed with the permit.
Fill in the applicable blanks, and initial box 1 and either box 2A or 28:,
1 I own, reside in, or will reside in the completed structure
My general contractor is
Contractor registration number
I will instruct my general contractor that all subcontractors who work on
the structure must be registered with the Construction Contractors Board.
2.4
OR
B I will be my own general contractor.
lf I hire subcontractors. I will hire onlv subcontractors reoistered with the
Construction Contractors Board. lf I chanoe mv mind and Eo hire a oeneral
contractor. lwill contract with a contrattor-who is reoistered with tne
Constructibn Contractors Board and I will immediatelv-notifv the office
issuing this building permit of the name of the contraitor.
I hereby certify that the above information is correct and that I have read and understand
the lnformation Notice to Property Owners about Construction Responsibilities on the
reverse side of th ,1
nature o can
CONSTRUCTION @NTRACTORS BOARD
u2e) fit24l89
ate
^ ^vL\45r copy ro rssurNc AGENcy pERMrr FrLE\ pus#;6oPY ro APPUCANT
\ -'.-, \ r"L\*-,,
@s
I
a \
/
29,/c/ ()