Loading...
HomeMy WebLinkAboutPermit Building 1994-04-14COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 LOCATION OF PRO ASSESSORS MAP SPRIl.GFIELO JOB NUMBER INSPECTION LINE: 726-3 OFFICE: 726-3759 TAX LOT: PHONE: 1LezZ,zZ)ZIP:STATE:v vCITY: ADDRESS OWNER NEW - FIEMODEL b// ADDITION DEMOLISH OTHER VALUE: DESCRIPTION OF WORK ARCHITECT: CONST, CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIBES PHONE MECHANICALi NAME ADDRESS PHONE ELECTRICAL: PLUM B I NG: G ENERAL: PLU MBING NO.FEE CHARGE Single Fixture Relocated Bldg (new f ix. addtl) Water Service ft Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT NO FFtr CHA RGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall otlloor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT LAND USE: ZONING HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER OCCY GROUP: * OF STORIES: QUAD AREA: C OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE 4oD,*TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RC PT#DATE BY 75 a BUILDING PERMIT,Wzt9,/ud PLU M BI NG DEMOLITION 5% State Surcharge .7r 5% State Surcharge MECHANICAL FENCE VALUE $5% State Su rcharg e SIDEWALK FT. SUBTOTAL PERMITSPAVINGCURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL \ ?747e _ OFFICE USE - * OF UNITS: REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. S|TE TNSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRICAL & and approved. section 306 0f the state Specialty code MECHANTCAL: To be made _ a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duri ng CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: E'DED| ^E. E copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, alt steel in place, but framing inspection' STRUCTURAL CONCRETE: ln prior to placing concrete. FRAMINGr To be made after excess of 2500 P.S.l. (306 a'1) coNcRErE sLAB: ro be l!:#:f; ilJ'iil'Jlfl;tl,? ," srRUcruRAL wELDS: made after all inslab building place and all pipes, chimneys Performed on the iob. (2722f) service equipment, conduit, and vents are complete andpiping, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING: ancillary equipment items are and melhanical are approved. During all bolt installation and in place but before any tightening operations. (306 concrete is placed. TNSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUNDT Plumbing, insulation and required vapor SPRAYED ON electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or f illing applied. SpECIAL GRAD;NG, t renc hes. ,NDERFL..R: p,umbins [:::,i'"'"'fl#Jfl[H]"' fi:iU1!iil-tll''5J:'i]'"1 electrical, mechanical. To be according to plans' chapter 29) made Prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the City's posr & BEAM: To be made interior and exierior, is in Building Division before priortoinstallationoffloorplacebutbeforeanybeamsareplaced.(2501U.Bc. insutation, decking or f loor plastering is applied or before STDS' 25-10J1)' sheathing.gypsumboardiointsand iasteners are tiped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'71 VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating comPlete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but Prior to Placing concrete. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct,-anj I further certify that any and all work performed shall be done in accordance with the ordinances of the city of Springfield, and the Laws of the state of oregon pertaining to the work described herein, and that No occuPANCY will be made of any structure without permission of the Building safety Division. I further certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that proiect address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all DateSignature t times during construction VALIDATION 7rAMOUNT RECEIVED RECEIPT #RECEIVED BY: DATE PAID FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this insPection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a iertificate of Occupancy has been issued by the Building Division and posted on the Premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE