HomeMy WebLinkAboutPermit Mechanical 1998-04-27RESIDENTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office:726-3759
SPRINGFIELEI
LOCATION OF PROPOSED WORK:sles o
JOB NUMBER ff:-
225 Fifth Street
Sprlngfleld, Oregon 974
TAX LOTASSESSORS MAP:
LOT:BLOCK:SUBDIVISION
1l t -but'{PHONE:
ZIP:S ocSTATE:
F r.T ?. LJc,.tfck
S< gs T \.rr.rt>*H,
OWNER:
ADDRESS:
CITY:
<'-6ra
ADDRESS
(-r
e
qFJ
t
C
t
Lg L
t-Ler
t
c
- (\r*ts,
J,, c(to
o
.<t.+(=(o €
9.<rl
-7
CONTRACTOR'S NAME
DESCRIBE WORK:rte
EMOLISH
MECHANICAL:
ELECTRICAL:
PLUMBING:
GENERAL:
6as
EXPIRES
6)-CONST.
CONTRACTOR #
r.sc rf f Ft
NEW
-
REMODEL ADDITION
-o../h
D
.3 PHONE
- OFFICE USE -
WATER HEATER:
ZONING CODE:
RANGE:
QUAD AREA:
* OF BLDGS:
SECONDARY HEAT
SQUARE FOOTAGE:
LAND USE:
OCCY GROUP:
* OF STORIES:
CONSTR. TYPEr
HEAT SOURCE:
# OF UNITS:
-
To request an lnspectlon, you must call 726-3769. Thls ls a 24 hour recordlng. All lnspections requested before 7;OO a.m. wlll be
made the same worklng day, lnspections requested af ter 7:O0 a.m. wlll be made the followlng work day.
REOUIRED INSPECTIONS
Temporary Electrlc w Rough Mechanlcal - Prior to Flnal Plumbing - When att
plumblng work ls complete.4#;Slte lnspectlon - To be made
after excavation, but prlor to
setting forms.
Rough Electrical - Prior to Final Electrical - When all
electrlcal work is complete.cover,
Underslab Plumblng/ Electrlcal /
Mechanlcal - Prlor to cover.Electrlcal Servlce - Must be
approved to obtain permanent
electrlcal power.
ffl Final Mechanlcal - When ail/ffiffiw7..*| | Flnal Buildlng -:lJ required lnspectlons have been
approved and building is
completed.
Footlng - After trenches are
excavated.J-l Flreplace - Prlor to faclng
-
materlals and framlng lnsp.
Masonry - Steel locatlon, bond
beams, groutlng.
[*-l Framlng - Prlor to cover.tl Foundatlon - After forms are
erected but prlor to concrete
placemont.
Other
Wall/Celllng lnsulatlon - Prlor to
cover.
E Underground Plumblng - Prlor Drywall - Prlor to taplng.to fllllng trench.
Underlloor Plumblng / Mechanlcal
- Prior to lnsulatlon or clecklng.
MOBILE HOME INSPECTIONS
Wood Stove - After lnstallatlon
Post and Beam - Prlor to floor
lnsulatlon or decklng.lnsert - After flreplace approvgl
and lnstallatlon of unlt.
Blocking and Set.Up - When all
blocklng is complete.
Floor lnsulation - Prlor to
decklng.Curbcut & AJrproaclr - After
forms are erected but prior toplacement of concrete.
Plumbing Connections - When
home has been connected to
water and sewer.
Sanllary Sewer - Prior to fllllng
trench.
Storm Sewer - Prlor to fllllng
trench.
Sidewalk & Drlvewav - After
excavation ls complete, forms
and sub-base malerlal ln place.
Electrlcal Connection - When
blocking, set-up, and plumblng
lnspections have been approved
and the home is connected to
the servlce panel.
l_l Water Llne - Prlor to fllllnglJ trench.
l-l Rough Plumblng - Prlor roU cover.
Fence - When coirrpleted.
Slreel Trees - When all requlred
trees are planted.
Final - After all required
lnspectlons are approved andporches, sklrtlng, decks, and
ventlng have been lnstalled.E
4't v lfl
# OF BDRMS:
-
FLOOD PLAIN:
E fl
tl
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total helght
Lot Type v
-
lnterior
-_
Corner
-
Panhandle !
-
Cul-de-sac
Setback
PL.HSE GAR ACC
N
S
E
(._1S THE PROPOSED WORK TN THE.
HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTER?
-
lf yes, thls applicatlon must be slgned
and approved by the Historlcal
Coordinator prior to permit issuance.
APPROVED:
VALUE
(A)
Garage
Carport
Total Value
Building Permit Fee
State Surcharge
Total Fee
X $/SQ. FT.
BUILDING PERMIT
ITEM SO, FT.
Main
BUILDING VALUE, ISUM CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Receipt Number:-
Plans Reviewed By Date
Date Paid
Received By
Plan Check Fee:
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Moblle Home
FEE
(c)
N.
FT.
PLUMBING PERMIT
Plumbing Permit
State Surcharge
Total Charge
ADDITIONAL COMMENTS
,
e<sane,{-Hced+ < 6e*2/q7 a.+
wood stove/tnsert@
Vent Fan
Dryer Vent
No
a><
4>G,T,,A,+
//a,GB:G
(D)zzez
MECHANICAL PERMIT
Furnace
Mechanical Permit
lssuance
State Surcharge
Total Permit
7V*
By slgnature, I state and agree, that I have carefully examlned
the completed apptication and do hereby cerilfy that all
Information hereon is true and correct, and I further cerflly
that any and all work performed shall be done in accordance
wlth the Ordinanccs of the City of Sprlngfield, and the Laws
of the State of Oregon perlalnlng to the work described
herein, and that NO OCCUPANCy wlll be made of any
structure without perrnission of the Bullding Safety Divislon.
I further certify that only contractors and employees who
are in compliance with ORS 701,O5S will be used on thls
proiect.
I further agree to ensure that all required inspections are
requested at the proper time, that each address ls readable
from the street, that the permlt card ls located at the front
of the property, and the approved set of plans will remain
on the site at all imes during constructlon.
Slgnature
Date
MISCELLANEOUS PERMITS
Moblle Home
State lssuance
State Surcharge
Sldewalk
-
ft
Curbcut
-
ft
Demolitlon
State Surcharge
Total Miscellaneous Perrnils (E)
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, Q and E Comblned)
.2DATE PAID
AMOUNT RECEIVED
RECEIVED BY
VALIDATION:
RECEIPT NUMBER
:
ai
FT.
- FT.
q9