Loading...
HomeMy WebLinkAboutPermit Plumbing 1992-01-15RESID ENTIAL PERMIT APPLICATION lnspections: 726-3769 Office: 726-3759 SPFtINGFIELE' JoBNUMBE" ?z*>-, 225 Fifth Street Springfield, Oregon 97 477 LOCATION OF PROPOSED WORK: ASSESSORS MAP:-o TAX LOT:?a LOT:BLOCK:SUBDIVISION OWNER:L PHON E ADDRESS: CITY:STATE:a'< -ZIP: DESCRIBE WORK NEW - REMODEL ADDITION DEMOLISH OTHER CONTRACTOR'S NAME ADDRESS CONST. CONTRACTOR #EXPIRES PHONE G EN ERAL: PLUMBING 7 MECHANICAL: ELECTRICAL _ OFF]CE USE _ QUAD AREA: * OF BLDGS: LAND USE:FLOOD PLAIN * OF UNITS:ZONING CODE: OCCY GROUP: * OF STORIES: CONSTR. TYPE HEAT SOURCE: # OF BDRMS WATER HEATER:RANGE: SECONDARY HEAT SQUAFIE FOOTAGE: To request an inspection, you must call 726-3769. This is a24hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS fl Temporary ElectricLI Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work rs complete.cover. Underslab Plumbing/ Electrical/ Mechanical - Prior to cover. Electrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Fireplace - Prior to facing materials and framing lnsp. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting.Framing - Prior to cover. Other Foundation - After forms are erected but prior to concrete placement.Wall/Ceiling tnsulation - Prior to cover, Underground Plumbing - Prior to f illing trench.Drywall - Prior to taping. MOBILE HOME INSPECTIONS Underf loor Plumbing/ Mechanical - Prior to insulation or decking.Wood Stove - After installation. Post and Beam - Prior to floor insulation or decking.lnsert - After fireplace aPProval and installation of unit. Blocking and Set-Up - When all blocking is complete. Floor lnsulation - Prior to decki ng.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to f illing trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in Place. Waler Line - Prior to filling trench.l-_l Fence - When comPleted Street Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. w Rough Plumbing - Prior to cover. E E r r r r r tl Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Typer- - lnterior - Corner - Panhandle - Cul-de-sac Setbacks PL.HSE GAR ACC N S E . IS THE PROPOSED WORK IN THE HISTORIC,A.L DISTRICT, OR ON THE HISTORICAL REGISTER? lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: VALUE (A) X $/SO. FT. Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SQ. FT. Main Garage Carport BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Reviewed By Date Receipt Numbe Plan Check Fee Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtu res Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE 25e /-29 (c) N0 FT. FT. FT. <:;4' ?<-o' 26,- PLUMB!NG PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Fi replace Unit Dryer Vent (D) N0Vent Fan Mechanical Permit lssuance State Surcharge Total Permit MECHANICAL PERMIT Fu rnace Exhaust Hood By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the f ront of the property, and the approved set of plans ll remain tonon the site at all es during c Signature Date MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) /{s_* 26-2J- DATE PAID AMOUNT RECEIVED RECEIVED BY VALIDATION: RECEIPT NUMBER