Loading...
HomeMy WebLinkAboutPermit Building 1994-12-09COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 974 SPR]NGFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759,4 sv U 0 rAx Lor: ArGr#* C6Oa LOCATION OF PROPOSED WORK: ASSESSORS MAP:2-o @gA#ttR:PHONE: STATE:ztP ADDRE CITY: . NEW REMODEL ADDITION DEMOLISH OTHER VALUE CetDESCBIPTION OF WORK: MECHANICAL: Et EfrrolfrA I NAME ADDR EXPIRESRESS PHONE S N CONTRACTOR'S N ARCHITECT: PLUMBING: GENERAL: coNsT. CONTRACTOR # PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg (new fix. addtl) Water Service ft Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL NO trFF r:I{A FIGF Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent lrom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT ,u-/2^lY ZONING PLO - OFFICE USE -HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUOGET: WATER HEATER: LAND USE: * OF UNITS: OCCY GROUP: g OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT. SQ. FTG MAIN SQ. FTG OTHER TOTAL VALUE OF PROJECT- VALUE X so. Frc AccESS = ^* fuer,r,ea nLANcHEcK FEE /2A.OA, Rcpr, ,qf?? DxeS^V-?r' By ,ffi BUILDING PERMIT ?/f.9a PLUMBING DEMOLITION 5% State Surcharge ,?B /a.b reU?5% State Surcharge bx>d.*2 tD A/s).ac MECHANICAL FENCE VALUE $ 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERMITS zz,7u PAVING CURBCUT FT. SYSTEMS DEVELOPMENT f/o o.o 7 TOTAL PERMIT FEES EXCLUDING ELECTRICAL ?7/3>>. REQUIRED INSPECTIONS It ls the responsibillty of the permit holder to see that all inspectlons are made at the proper time. To request an inspection, call 226.3769 (recorder), state your City designated job number,.lob address, type of inspection requested and when you will be ready for lnspeclon. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the (ollowing work daY. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prlor to placing prlor to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these uNDER5LAB pLUMBING, inspections have been made spEclAL lNSPEcrtoNS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work ls covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during CURTAIN WALLS construction of the following work. A y FoorlNGS & FouNDATIoNS: trrErFpr acF. r copy of the special testing reports shall To be made after trenches are FIREPLACE: Prlor to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, all steel ln place, but framing lnspection' x STRUCTU-RAL^CONCRETE: ln prior to placlng concrete. FRAMING: To be made after excess of 2500 P.S.l. (3OG a.1) x coNcRErE sLAB: ro be LT:J-::L i'lJ'3['Jlfl;tXi ," srRUcruRAL wELDS: made after all inslab building place aid all pipes,ihimneys Performed on the iob. (2722 tl service equipment, conduit, and vents are'complete and piping, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING: ancillary equipment items are and melhanical are approved. During all bolt installation and ln place but before any tightening operations. (306 concrete is placed. INSULATION & VApOR a.6) BARRIER: To be made after all X UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. dralnage llnes. To be made board lnterior wall covering is prlor to covering or filling applied. SpECIAL GRAD3NG,trenches, ,NDERFL.'R: p,umbins [l:"=,S"i""f;m'J3[H3"' El:i.X1'iilltll:'5lb'j]'"1 electrical, mechanlcal. To be according to plans' Ghapter 29) made prlor to installation of r A?u Arrhrn D ^vDerri^ - GLU.LAM BEAMS: lnspectionfloor insulatlon, decking or LATH AND'OR GYPSUM lloor sheathlng. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the City's posr & BEAM: To be made lnterlol and exierlor, is in Building Division before prlor to lnstallatlon of floor place but before any beams are placed' (2501 u'Bc' lnsulailon, decklng or floor plasterlng ls appliei or before STDS' 25-10'11)' sheathlng.gvvlrtltvgypsumboardlointsandGsteners are taped and STRUCTURAL MASONRY: (306 FLooR rNsuLATroN & finished' a'7) VAPOR BARRIERS: To be made Prlor to lnstallation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or vertlcals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prlor to lnstalling any roof coverlng. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, lo be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but Prior to Placing concrete. 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, Clty or Development Code. By slgnature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informatlon hereln is true and correct, and I further certify that any and all work performed shall be done in accordance wlth the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCY wlll be made of any structure without permission of the Building Safety Divlsion. I further certify that only contractors and employees who are ln compllance with ORS 701.055 will be used on this project. o ensure that all required inspections are requested at the proper time, that proiect address is readable f rom the t card ls located at the front of the property, and the approved set o{ plans will remain on the slte at all slgnature Date I further agree t street, that the on.times durlng AMOUNT RECEIVED: V 7Z .A?VALIDATION: RECEIPT T: DATE PAID: FTNAL PLUMBING X FINAL ELEcTRTcAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions $uch.as landscaplngL, parking lot striping, etc. must be completed b6fore requesting thl.s lnsPection. FINAL BUtLDING: Requested after the final plumbing, electrical, mechanlcal and Flre Department inspections are made and approved. No occupancy of the premises can be made until a Certiflcate of Occupancy has been issued by the Building Division and posted on the premises. v ADDITIONAL COMMENTS: PLANS REVIEWED DATE ,/a-/^2y RECEIVED BY: ,nroF 5t.tItr'tGl:Ir:r-u 225 FIFTII STRI|UT SPRINGFIILD, oREGoN 97477 INSPECTION REQUBSTt 726-3769 oFPICE: 726-3759 'oning' an rpProval' has the toliowt iiic tand use ing Proiec Zoning- l-r 2it, ILECTNICAL PBRHIT APPLICATION City Job Number q4l 2- HuIti-FamiIy per dwelling unit. Service Included: I tems Cos t 1000 sq.ft. or less Each additlonal 500 sq. ft or portlon t lre reo f Each Hanuf 'd tlome or $ Bs.oo $ 1s.00 Hodular Dvellirig Service or Feeder $ 40.00 B.Services or Feeders Installatlon, Alteratlons or Relocation: 200 amps or less I 201 anrps to 400 amps -401 amps to 600 amps _ 601 amps to 1000 amps_ 0ver 1000 amps/volts Reconnect 0nly 1. LOCATION OI' INSTALI.NTION .^' . I . .!O!NT.UIV..YEB.SCIIEDULB BELOV - q$!-'\A;ffifn/, 1QP ^. Nev Residential-Singre or LEGAL PTION ,JOB UESCNIPTION CIen)ro-e-2 Sum a[6,e ,5D.@ Permits are non-transferable and expireif vork is not started slthln 180 days of lssuancc or lf vork ls suspended for 180 days. 2. CONTRACTOR INSTALINTION ONLY lilcc t rical Con t rac,"-l\tc ID Add r:ess Ci ty Phone Supervisor License Ntimber Expiration Date \D.\ 1a Constr Contr. Number L Expiration Date +e4q3 Signaturc of Supervising Blectrician Ouners Name Temporary Services or Feeders Installatlon, Alteration or Relocation s s0.00 s 60.00 $100.00 s130.00 $300.00 $ 40.00 c D 200 amps or less $ 40.00 201 amps to /r00 amps _ $ 55.00 over /r01 to 600 amps _ $ 80.00 0ver 600 amps or 1000 volts see rrBrl Add rc s cit Phone OUNNR INSTALLATION Tlre installatlon is being made on property I own vhich is not interrded for sale, Iease or rent. Ovners Slgnature: DATE: Branch Circui ts Nev, Alteratlon or Extenslon Per Panel One Ci rcui t Eaclr Ad<litional Circui t or vi th Service or Feeder Permi t s 3s.00 E. l'liscellaneous (Service/feeder not included) $ 2.00 -Each installation Pump or irrigation $ sign/outline Ligtrting- S Limi ted Energy/Res _ $ Limi ted Energy/Comrn S 40.00 40.00 20.00 36.00 SWTOTAL OP ABOVB 5f State Surcharge lTmL @/o rui(:tiIVII) ltY: 5 b1 @ -Ihe tollotti 14b4l.5b it43s ATTACHMENT BI JOB NO.? 4r 3s2 CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE \^IORKSHEET (COHHERCIAL & RESIDENIIAL) 0--r-NAI{E 0R C0HP/tl'lY: 737 LOCATION 4%. EEVELOPMENT TYPE: BUILDING SIZE:F 1. STORM DRAINAGF iHPERVIOUS SQ. FT.fsa 2. SANITARY SEWFR-CiTY OT SI X $0.209 PER SQ. FT X $43.25 PER PFU 3 ,. Ft. S 4/NO. OF PFU'S (See Reverse) 3. TRANSPORTATION NO OF UNITS X TRIP RATE X COST PER TRIP 7 S 4x - x s436.19 x - x s436.19 x - x $436.i9 s SUBTOTAL (ADD ITEMS i,2. & 3)s Tizo 4. SANTTARY SEIIJFR-MI^JMC $17.19 PER PFU + $10 [4lttHc POMiN.FEE $ (Use PFU Total From tem 2 Above) I"II^II,IC CREDIT IF APPLICABLE (SEE REVERSE) TOTAI -MWHC SDC SUBTOTAL (AOD ITEMS 1.2.3 & 4)s q5.30 5. ADMINTSTATIVF FTES BAS E (SUBTOflA\ ABOVE) X .05 / $ Ha is, ina .3o 82. SDC Date: TOTAI SDC NO. OF PFU'S s.. SlU d, s 4.7 a s 07 FIXTURE UNIT CALCUL*r ION TABLE: ruumuer or New rirtr-,", x Unir Equivatent = Fixrure Units INOTE: For remodels, calculate only the NET additional fixturesl XTURE TYPE NUMBER OF NEW FIXTURES UNIT FIXTUBE EOUIVALENT UNITS Fountain Floor Laundry Clot - 3 Or More Mobile Home k Trap (1 Per Trailer)...... 2 1 2 3 6 Beceptor For Re Receptor For Co r/lVater Station/Etc I Sink/Dishwasher/Etc.. erato 6 6 1 3 2 1 2 2 1 6 m Shower, Single Stall. Shower, Gan9............. Sink: Bar, Commercial,al Kitchen.. eIH 2 4 ad Urinal, StaltftVall Wash BasinAavatory, Single. Toilet, Public lnstallation Toilet , Private Miscellaneous:3 CREDIT CALCULATION TABLE: Based on calculate credits separates, or Parcel or Land Only lf Applicable rovernent (if after annexation date) TOTAL FIXTURE UNITS lue. lf improvements occurred after annexation date in table, x$ (Rate X Assessed Value) (Rate X Assessed Value) CREDIT TOTAL - $ Year Annexed /:*per $1,ooo \/ Assessed Value Year Annexed Rate per $ l,OOO Assessed Value 1 980 1 981 1 982 1 983 1 984 1 985 $3.46 3.38 3.32 3.21 3.06 2.92 2.73 1979 or before s2.46 2.14 1.77 1.37 o.97 o.61 o.44 o.15 BB 19 1 1 985 1 986 1 987 1 991 1 993 For Grease/Oil/Solids/Etc................. For Sand/Auto Wash/Etc.................. x $_