HomeMy WebLinkAboutPermit Plumbing 1995-06-09CO M M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fitih Street, Springf ield, Oregon 97477
LOCATION OF PROPOSED WORK
SPRINGFIELO JOB NUMBER %;D
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
h,
ASSESSORS MAP:,/s
PHON E
STATE:ZIP:
z1>
OWNER
ADDRESS
UIII.
REMODEL ADDITION DEMOLISH OTHERNEW /(VALUE:
DESCRIPTION OF WORK:
MECHANICAL:
-
NAME DRESS PHONE
EXPI RES PHON E
v t/4"/E
B?ADDCONTRACTOR'S NAME
ARCH ITECT:
ELECTRICAL:
GENERAL:
PLUMBING
CONST.
CONTRACTOR #
PLUMBING
NO.FFF CHARG E
Single Frxture ,0,e
Relocated Bld
(new fix. addtl s
)
Water Service
f t.
Sanitary Sewer
ft.2d Storm Sewer
ft
Backflow Device
TOTAL PERMIT 6qn
MFC HAN ICAL
NO FFF EHA FIG tr
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
FIoor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
se parat e
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT rAz*./€.ao
_ OFFICE USE _
ZONING a--
FLOOD PLAIN:
LIGHTING POWER BUDGET:
WATER HEATER
OCCY GROUPT
, OF STORIES
QUAD ABEA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
* OF UNITS:
HANDICAP ACCESS:
-
4t7oaa
tZi^tr^r, ",,^"**3?
$/SQ. FT.VALUE
?a2
SQ.FT.
2D4 X
X
SQ. FTG MAIN
SQ, FTG ACCE.SS
SQ. FTG OTHER
PLAN cHEcK FEE /27. VV ssplr /??%, oartL^Z 7.€BY
6fi,27
BUILDING PERMIT 2A.5o PLUM BI NG 44-DEMOLITION
5% State
Surcharqe
/7,a8_ ?_,32 5% State
Su rc h arge v-7?MECH L 4?FENCE
VALUE $
5% State
Surcharqe ra SIDEWALK
FT.
SUBTOIAL
PERM ITS 2PAVI NG Z€d,,4 CURBCUT
FT,
SYSTEMS
DEVELOPMENT # E+9#
TOTAL PERMIT FEES
EXCLUOING ELECTRICAL
LAND USE:
REQUIRED INSPECTIONS
It ls the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be readyfor lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made af ter 7:OO a.m. will be madethe following work day.
SITE INSPECTION: To be ,Y RoUGH PLUMBING, PAVING: After grave| iS inmade after excavation, but ELECTRICAL & ptace but priorlo ptacingprior to setup of forms. MECHANICAL: No work is to asphatt or concrete.
4
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all plpes, chimneys
and vents are complete and
the rough electrlcal, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering ls
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
made prlor to installation of
f loor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f loor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams groutlng or
verticals in accordance with
uBc 2415.
RooF sHEATHTNG AND iHffi^H?rtl'"r::f""!|'"
NAILING: Prior to installing erected but prlor to placing
any roof coverlng. concrete.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, ls in
place but before any
plasterlng is applied or before
gypsum board joints and
fasteners are taped and
f inished.
STDEWALK & DRIVEWAY:
Required for all concrete
paving withln street right of
way, to be made after all
excavatlng complete and form
work and sub-base material in
place.
SPECIAL INSPECTIONS: tn accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor duri ng
construction of the following work. A
copy of the special testing reports shall
be furnished to the Buitding Division.,
STRUCTURAL CONCRETE: In
excess of 2500 P.S.t. (306 a.1)
STRUCTURAL WELDS:
Performed on th6 jab. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
cLU.LAM BEAMS: tnspection
Certif icate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
- ln addition to the inspec.
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work ls covered.
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete ls placed.
UNDERGROUN D: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
t re nc hes.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
v
/
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and lfurther certify that any and all work performed shall be done in accordance with the Ordinances
of the Clty of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Bullding Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times durlng construction.
Signatu re Date
VALIDATION:z-e^9 fAMOUNT RECEIVED:
RECEIVED BY:
DATE PAID
RECEIPT #^n>
4
4
r FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
,( FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
v SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requestlng this lnspection.
X FINAL BUILDING: Requested after the finat ptumbing, etectrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occu has been issued by the Building Divisionposted on the rem SES.
PLANS REVIEWED BY Dli-E d;--*2F
,'(
a^* 7 {Y,-[n.--
4?a <t
roB No. ?5ot t9
CITY OF SPRINGFIELD SYSTEMS DEVETOPMENT CHARGE
WORKSHEET
(C0MNERCIAL & RESIDENTIAL)
Srxrtt G IE LD llrturr-/Bo*LDNAME OR COMPANY:
L0CATION: ?4 oo SPo ars /-7 oZ t 5oct - OloO I
DEV E LOPMENT IYPE: CC : ()t t c-rT/
BUILDING SIZI: 9OO *A.TT LOT SI
1. STORM DRAINAGE
IMPERVIoUS SQ. FT.N A x $0.209 PER SQ. FT
2. SANITARY SEWER-CITY
NO. OF PFU'S
(See Reverse)
X $43.26 PER PFU
a. Ft.
?J . TRANSPORTAT ION . ,aoe t1o - Urt t-r Tt b9 -- o.4o / ro5 F
NO OF UNITS X TRIP RATE X COST PER TRIP
i.2 x 6.*o x$436.le
X x $436. 19
X x $436. t9
4 . SAN ITARY SEI,IER-MWMC
N0.0F PFU'S N.A. x $17.19 PER PFU + $10 MWMC ADM FEE
(Use PFU Total From Item 2 Above)
Ml.lMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL-MWMC SDC
SUBToTAL (ADD ITEMS I,2,3 & 4)
5. ADMINISTRATIVE FEES
BASE CHARGE (SUBToTAL ABoVE) X .05
$
$
$o-
S 5?-4
p Burd ck
SDC Coordinator
oate:6f qfq6
TOTAL SDC s 5+13
.A ,N