Loading...
HomeMy WebLinkAboutPermit Building 2002-08-21SPR!NGFIELD Job# 02-00818-01 COMMERGIAL PERMIT City Of Springfield Community Services Division Building Safety Page 1 of4 Job Number: 02-0081 8-01 Office: 726-3759 lnspection Line: 726-3769 Tax Lot#: 00200 Subdivision: 225 Fifth Street Springfield, OR97477 Location Of Proposed Site: 3800 Sports Way Spr AssessorsMap#: 17031532 Lot: Block: Addition: ctTY oF SPRTNGFiELD, OREGOI' Owner: Chambers Development Corp Phone Number: Address: 2295 Coburg Road Gity/State/Zip: Scope Of Work: Otfice New Sports Way Business Park Two story office building ( foundation) Submitted for remainder of oermits 8/8/20 dlm Gontractor Type Contractor Registration 541-338-8334 Eugene, OR 97401 Value: $275,000 # Expiration Date Phone 541-688-5594 5i30l2003 541-687-0445 I 541-485-0922 541-726-0100 Architect GeneralContr Electrical Contr MechanicalContr Eric Hall 302 Waite Street, Eugene, OR 97402 1996 LLC 114258 2295 Coburg Rd, Eugene, OR 97401-7482 Builders Electric lnc 4296 195 Madison St, Eugene, OR 97402-5030 Comfort Flow Heating Co 00460 )n center' ro-no1-001 1951 Don Street, Springfield, OR97477 Plumbing Contr Twin Rivers Plumbing PO Box 40397, Eugene, OR 97404 176e5 N0TlCE371'' T H I s P ERM r{'SRtrir E-xPFlJl-:0fr uruRK ^, ,', ,^o,,rri ii{DER lHrs prnutT ls-N0T Quad Area: # Of Units: Constr. Type: Water Heater: lINW Office Land Use: Zoning Code: CC (llN) Conc-No Fire Rqn Bedrooms: Range: use - CQM other BusinessffitWi80 BUrffiFl&Hg"r 1 Occupancy Group: Office/Professiona Heat Source: Sq. Footage: 10190 To request an inspection call the 24 hour recording at726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Required lnspections Building Site Footing Foundation Slab -To be made after excavation but prior to setting forms. -After trenches are excavated. -After forms are erected but prior to concrete placement. -To be made after all inslab building service equipment, conduit piping, and other equipment iten Bolts installed in concrete Final Site Plan U ndergrou nd Electrical Verify Ground Rod Underfloor Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Rough Grading FinalPaving Zoning: CC FloodPlain? [] Wetlands? [ Journal numbers 1:2002-05-0128 2: Comments: Planner:Sarah Summers Urban Growth Boundary? Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Job# 02-00818-01 Page 2 of 4 Required lnspections Building -To be done by a State Certified Special lnspector. Provide inspection test reports to City Buildinl -After all requirements have been met for Minimum Development Standards or from the Develop Electrical -Prior to cover. -lnstall ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir Plumbing - Prior to insulation or decking - Prior to filling trench. - Prior to filling trench. -Prior to filling trench. Permits w/o Srchg -After gravel is in place but prior to placing concete -After paving is complete. Overlay District: # of Street Trees: Land Use: Other Business Service Pave Driveway? E 3: Glenwood Area? ! Additional Requirements: Required Attachments: Source Locn: Material: Flood PIain FEMA: Construction Types(llN) Conc-No Fire Rqmnts Occupancy G roups : Office/Professional/Rest # Of Buildings: 1 # Of Stories: 2 # Of Bedrooms: Handicap Access? Current Units: Census Code: Does not apply Total:10190 Height (feet): Proposed Units: Area (Sq. Feet) Main: 10190 Accessory: Fee Paid On Receipt# Value/Quantity Fee Amount Plan Check Commercial Plan Check CommercialPlan Check Fire & Life Safety Plan Review Fire & Life Safety Plan Review Total PIan Check 07t10t2002 08109t2002 07t10t2002 08t09t2002 9891 10253 9891 10253 275,000 1,688,000 275,000 1,688,000 $737.36 $3,722.32 $453.76 $2,290.66 $7,204.10 Buildi Building Permit State Surcharge For Building Permit State Surcharge For Building Permit 08t21t2002 08t09t2002 08t21t2002 10362 1 0253 10362 $444.75 $.00 $31.1 3 69,000 Job# 02-00818-01 Page 3 of 4 Fee Paid On Receipt# Value/Quantity Fee Amount Building 8% Building Administrative Fee 8% Building Administrative Fee Total Building 08t09t2002 08t21t2002 10253 1 0362 $00 $35.58 $s1{.46 Electrica! Minimum Electrical Permit Fee Temporary: 200 Amps or Less State Surcharge - Electrical 8% Admin Fee - Electrical Tota! Electrical 08t21t2002 08121t2002 08t21t2002 08t21t2002 1 0362 10362 10362 10362 1 $.00 $50.00 $3.50 $4.00 $57.50 Ptum Minimum Plumbing Permit Fee Number of Fixtures State Surcharge - Plumbing State Surcharge - Plumbing Water Service Footage Sanitary Sewer Footage Storm Sewer Footage 8% Administrative Fee - Plumbing 8% Administrative Fee - Plumbing Total Plumbing 08t21t2002 08t21t2002 08t09t2002 08t21t2002 08t21t2002 08t21t2002 0812112002 08t09t2002 08t21t2002 10362 1 0362 1 0253 1 0362 1 0362 10362 10362 10253 10362 17 50 10 639 $00 $238.00 $.00 $31.99 $45.00 $45 00 $129.00 $.00 $36.56 $s25.55 Permits w/o Srchg Address Assignment Paving Total Permits w/o Srchg 08t21t2002 08t21t2002 10362 10362 1 206,000 $8.00 $91 0.1 5 $918.15 Photocopy Fees Total DeposiUGopies/Mis DeposiUGopies/Mis 08121t2002 10362 39 $19.75 $19.75 Grand Total PIan Check Type lnitial Review-C/l/P lnitial Review-C/l/P Engineering-C/l/P Planning-C/l/P Planning-C/l/P $9,236.51 Checked By Lisa Hopper Lisa Hopper Pam Ownby Liz Miller Liz Miller Date Completed 07111t2002 08113t2002 07112t2002 07t23t2002 08t1312002 Comment Foundation only Sarah Summers Ok'd foundation only Development agreement signed. Plan Check Type Structural-C/l/P Structural-C/l/P Structural-C/l/P Structural-C/l/P Structural-C/l/P Structural-C/l/P Fire Marshal-ClllP <_-Tr', Signature Job# 02-00818-01 Date Completed 07t19t2002 07t16t2002 07t30t2002 Page 4 of 4 Comment Faxed letter to Eric Hall requesting the following information: 1) Specify on the plans the vertical spacing and height of the reinforcing stubbed out of the footing for the masonry constructional. 2) Specify on the plans the size and length of all anchor bolts that will be cast in the concrete during construction of the foundation. 3) lt appears that the column and baseplate have been mislabeled at grid C-5. This may affect placement of the anchor bolts. Final Building Submittal 1) When final documents and calculations are submitted for review, please include a schematic drawing identifying the floor and roof beams as labeled int eh calculations. 2) Specify column to baseplate welds for baseplate type c and d. Fed Ex'd Geotech report to Tom Rogers Fed Ex'd Revised foundation drawings/lh. Resubmittal missing page 51.2. lh requested page via fax7l30l02 from Eric Hall. Checked By Tom Rogers Lisa Hopper Tom Rogers Lisa Hopper Tom Rogers Lisa Hopper AlGerard By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the that the permit card is located at the front of the property, and the will on the site at alltimes during construction. 0810112002 Fed Ex's Sheet 51.2 to Tom Rogers 0810312002 Foundation Only 0811312002 Fed Ex'd office plans - lh O8IO8I2OO2 FOUNDATION ONLY e tl- CffntY*l', (.*:=\. Co I 225 FTFTH STREET SPzuNGFIELD, OREGON 97477 INSPECTION REQUEST : 7 26-37 69 OFFICE: 726-3759 EI TRICAL PERMIT APPLICATION JorrNumber OZ-OO8tt{l COMPLETE FEE SCHEDULE BELOW Nerv Residential-Single or Multi-Family per du'elling unit. Scnice Included: Items Cost Sunr 1000 sq.ft. or less Each additional500 sq. ft or portion thereof Each Manufd Horrre or lvlodular Drvelling Service or Feeder $ r 9.00 In.stall ation, Altcrations or Rclocation: JOB DESCRIPTION Lr/ILC D FFrLa EeA G 200 anrps or less tlb s et.oo 37 8 $ 7s.00 _ _ $ 106.00 -- $ 125.00 Z$163.00rul $375.00 $ 50.00 .- 270 $50.00 $50.00 $25.00 $+5.00 Permits are non-transferable and expirc if rvork is not started rvithiu 180 days ofissuance or ifrvork is suspended for 180 days. 2. coNTRACToR INSTALLATION oNLy B. se..iccs or Feetters Electrical Ad City. Co SuPCtf . €orsk Contr. ' ., Expiration Date sing Electrician Owners N b"o Address s* a; Lu., City_$gLrfufy!'€ .phon 3E -$s7 OWNER INSTALLATION The installation is being made on property I otvn lvhich is not intended for sale, lease or rent. 1r',,"'' : 'zooampsorless : -,..\NgSL___ $50.00 *.^q $1?x% $43.00 contractor-pg!_1_fuft r-S_ I f66] n'C Each Additional Circuit or rr.ith Serv'ice or Fceder Perrnit 7() S :.OO E. l\'Iisccllnneous (Scn,icc/l'ceder not incluttctt) -Each installation Punrp or irrigation Linrited Energr'/ltes Liuritcd Euergt'/Conrnr - 4. SUBTOTALOFABOVE 7%o Statc Surchlrgc 8%o Atlministrltivc Fce Nlinimunt Electric Pernrit Insltcction Fcc is S{5.00 * Surchargcs 8/ I 5 6'zt Lt . Orvners Signature TOTAL 7sz LEGAL DESCRIPTION1103tT3Z Ooz-.oo Nurrrber Expiration 225 FIFTH STREET SPRINGFIELD. OREGON 97477 INSPECTTON REQUEST. ',T 26 -31 69 OFFICE: 726-3759 EL} RICAL PERMIT 1. LOCATION OF INSTAILA ' f i'^,1 ['- tL Av c ,l.:"i- TION 'JA<I l LEGAL DESCRIPTION JOB DESCRIPTION r Permits are non-trtrnsferable explre 2 , ,) OWNER INSTALLATION The installation is being made on propertl- I orvn rvhich is not intended for sale. lease or rent. Orvners o D. Rranch Circuits Neu'Alteration or -Famil1,' per tlrrelling un Scn'ice Included sq .ft.'less 500 ft or portion thereof Each Manufd Home or : Modular Drvelling Senice or Feeder it. Items Cost Sum $ 106.00 _ $ 19.00 :l.ntq if rvork is not started rvithin 180 davs --- of issuance oi if rvork is suspena9&Yo i .-" . ''-t' 180 days.. \ ,"tutu $ 50.00 or Extension Per Panel Pump or irrigation Sign/Outline Liglrting Limited Energv/Res Limited Energv/Comm $50.00 $50.00 _ $2_5.00 _ .$45.00 I\linimum Electric Permit Inspcction Fee is S-15.00 * Surcharges d. SUBTOTALOFABOVE 77o State Surcharge 8'% Administrative Fce 6af- ?,{oz,@ {cL C>U TOTAL lo A. Nen' CityJob Number P Z €06/6 -O / c/ Electrical' INSTALLATION ONLY B. Services or Feeders ?0 Installation, Alterations or Relocation: ' $ 63.00 _ $ 75.00 -_s 125,00 $163.00 -- $375.00 _ $ 50.00 $43.00 _ $ THE WORK Ir0T included) Address , Supen'isor License Number Expiration Constr Contr. 200 amps or less 201 aurps to 400 arnps -101 anrps to 600 amps 601 anrps to 1000 amps Over l0()0 amps/volts Reconnect Only C. Temporarl' Senices or Feeders Instirllirtion, Alteration or Relocation Expiration Signaturc of Supervising Electricitn Ol'ncrsNirmc ..- ,'". 2 o'ifftlIr: E. ATTACHMENT A CITY ( PRINGFII]LD SYSTEMS DEVEI-OPMENT CHARGE RKSHtstsT JOURNAL OR JOB NUMBER NAME ORCOMPANY: LOCATION: MAP & TAX LOT NUMBER: DEVELOPMENT TYPE: CHAMBERS DEVELOPMENT COMPANY 02-008 1 8-0 I 38OO SPORTS WAY l7-01-15-32 00200 OFFICE . FOUNDATION ONLY NEW DEVELOPED BUILDING AREA (S.F.): EXISTINC DEVELOPED BUILDING AREA (SF): TOTAL DEVELOPED BUILDING AREA (S,F.): ITE: ITE: 710 7't0 3. TRANSPORTATION BLDG AREA TGSF x TRIP RATE x COST PER ADT X NEW TRIP FACTOR NEW A. REIMBURSEMENTCOST: 0.00 x _]!Q]_ x $ 16.81 PERTRIP x B. IMPROVEMENT COST: 0.00 * _]!Q| x $74.17 PERTRIP x EXISTING A. REIMBURSEMENT COST: 0.00 x _]![ x $ 16.81 PERTRIP x B. IMPROVEMENT COST: 0.00 x ll.0l x $ 74.17 PERTRIP x I. STORM DRAINAGE IMPERVIOUS SQ. FT 2. SANITARY SEWER-CITY A. REIMBURSEMENTCOST: NUMBEROF DFU's B. IMPROVEMENT COST: NUMBEROF DFU's (SEE REVERSE SIDE) 4. SANITARY SEWER - MWMC NEW: A. REIMBURSEMENT COST: NUMBER OF FEU'S B. IMPROVEMENT COST: NUMBER OF FEU'S EXISTING: A. REIMBURSEMENT COST: NUMBER OF FEU's B. IMPROVEMENT COST: NUMBER OF FEU's MWMC CREDIT IF APPLICABLE (SEE REVERSE) LOT SrzE (S.F.): X $ 0.282 PER SF TOTAL STORM DRAINAGE SDC 0 x $ 22.09 PER DFU 0 x $ 16.79 PER DFU TOTAL LOCAL WASTEWATER SDC: 0.9 NTF NTF NTF TOTAL TRANSPORTATION REIMBURSEMENT SDC: TOTAL TRANSPORTATION IMPROVEMENT SDC: TOTAL TRANSPORTATION SDC: 0.00 x SI9O.2O PER FETJ 0.00 $19.90 PER FEU 0.00 $I9O.2O PER FEU 0.00 $I9.90 PER FEU TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE: MWMC ADMINISTRATIVE FEE: TOTAL MWMC SDC: SUBToTAL (ADD TTEMS 1,2,3,&4) 0.05 0.9 NTF0.9 x x x 5. ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) Paw"eLaJ. owwb eu x 7/1212002 $ $ H il $ or-008q?-6f 89ftPJUA$BEu...coRp,3Bo0sponrsDdfvlxrs TOTAL SDC CHARGES JULY 2OO1 0.9 I09t r092 r093 1094 r055 I056 1073 DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE NUMBER OF NEW RXTURES X UNIT EQUIVALENT = DRAINAGE FXTURE UNITS OOm, nOn neUOOeL FIXTURE TYPE DRAINAGE FIXTURE UNITS 0 0 0 0 0 TOTAL DRAINAGE FIXTURE UNITS: +EDU (Equivalent Dwelling Unit) is a discharge equivalent to a single family dwelline (20 DFU) set at 167 gallons per day CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEPARATELY FIXTURES NEW OLD UNIT LENTA 3 I J 3 6 2 J 6 12 I 3 2 2 3 2 2 I 5 6 J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 YEAR ANNEXED RATE PER $1,OOO ASSESSED VALUE YEAR ANNEXED RATE PER S1,OOO ASSESSED VALUE 1979 or before I 980 l98l 1982 1983 I 984 I 985 I 986 1987 1988 I 989 $ 4.92s 4.83 $ 4.77 $ 4.64 s 4.47 $ 4.30 $ 4.09 $ 3.78s 3.41 $ 2.98 e ,<') 1 990 199 r 1992 1993 1994 1 995 t996 1997 1 998 1999 2000 s $ s s $ $ $ s s S $ 2.06 1.64 t.45 1.3 r l.l3 0.97 0.82 0.63 0.41 0.22 0.04 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE IMPROVEMENT (IF AFTER ANNEXATION DATE) x x $0.00 $0.00 $0.00CREDIT TOTAL 0 02-00818-01, CHAMBERS DEVEL. CORP., 3800 SPORTS WAY.xls JULY 2OO1 BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC. INTERCEPTORS FOR SAND/AUTO WASH/ETC. LATJNDRY TI]B CLOTHES WASHER/MOP SINK CLOTHES WASHER - 3 OR MORE (EA) MOBILE HOME PARK TRAP (I PER TRAILER) RECEPTOR FOR REFRIGERATOR/WATER STATION/ETC. RECEPTOR FOR COMMERCIAL SINK/ DISHWASHER/ETC. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: COMMERCIAL, RESIDENTIAL KITCHEN SINK: COMMERCIAL BAR SINK: WASH BASIN/DOUBLE LAVATORY SINK: SINGLE LAVATORY/RESIDENTIAL BAR URINAL, STALUWALL TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: NUMBER OF EDU'S* SE,N I tsY: $PH1NGI.1ELU I'Yll;541 / iJOl UZ I ; {J, r: ;..,;,i*,['t,'.i ;1 1',iiiir :l]'1.',:\M, I i AFTI.:R RECORDING RETUITN TC): CITY C)tt SPRINGI?IIU-D OPUIIIJC WORKS DEPARI'I\'IENT ' 25-5 FIFTH LIEN uut - -ue lo:uo,TAUE 4 i- G r SPRINGFIF.I.D, OR 97477 City of springfield at CORPORATION particularly descrlhed in WHEREAS, the City of Springfield, pursuant to Oregon Statutes 223.297, et seq-, "system Development Charges,' has enacted, "System Development MunicipalCode; and of the Springfield WHEREAS, the purpose of the Systern Development Charge to impose an equitable share of the public cost of capital improvements upon the activity of that crestes the noed for or increases the demands on such caPitral improvements; and WHEREAS, Section 3.412(1) of the springfield Municipal provides for the payment of permit. aPProvalofa System Development Charge at the time of the issuance of a buildi development application for development not requiring the issuance of building permit, ora permit to connect to water, sanitary sewer, or storm sewer systems; WHEREAS, Section 3.412(3)of the Springfield Municipal provides that the CitY provision for PaYmentManager or the Manage/s designee may require payment in tull or satisfactory to the City has been made; and WHEREAS, Section 3.412(4)of the Springrfield Munlcipal provides that any provision for payment satisfactory to the City which includes providing an to pay the unpaid System Development Charge and interest ther6on, shall be secured property, bond, deposits, letter of credit. defened payment the Manage/s dosignee; and agreement, or other searity acoepta to the City Manager or Svsrcru DEvELoPMENT C GE AONTTMENT FON DETE This executed Agraement is to be recorded at Appticanfs expense by Lane County Deeds and Records Office. PRRIes:City of Springfield, and Development Appticant CHAMBERS Development Project: SPORTS WAY BUSINESS PARK PHASE 1 Exhibit'A" which is attaclred hereto and incorporated herein by this RECITALS: WHEREAS, City through Resolution No. 93'25 has the opportunity for Development Applicant to defer System Charge for the above-referenced development proiect in the rnanner NOW, THEREFORE, City and Development Applicant agree Charge will be paid in accordance with the following terms and DESCRIPTION OF PROJECT: Constructlon of an associated parklng lot. 2. SYSTEM DEVELOPMENT GHARGE: 355,779.57 a program providing for Charges;and stated. the System DeveloPment bulldlng and Page 1 of3 ll WHEREAS, Development Applicant has requested deferral of System Development 1 System Development Charge Agreement for Defernal ro/0t/2002 TIJE 13:45 ITXIRX NO 74051 @OOZ -N I tsY: SPHINGFIELU }'W;5.+t ,.Jbluel; DEFERRED PAYMENT ln ParagraPh 2 shallbe following schedule: SGHEDULE: The SYstem paid bY the DeveloPment (b) The sum of HUNDRED SEVENTY NINE AND construction as determined bY the City. City will nottfy Development due. (c)lrr the event thal Development Applicant fails to by subparagraph (a), the Clty will not issue a defined in Sec'tion 3.412 of the Springfietcl Mu fails to make the payrnent required by subparagraph issued. (d) Development Applicant shall have the right to in this contract in whole or in part at any time wlthout penalty. 4. WAIVER: ln consideration for the defenal of System in this agreement,llwe expresslywaive anyand allenors, othenrvlse, regarding the System Development Charge, including elrorsr lrregularities, or defects, if any, in the computation sf or charge.5. DURATION: This agreement shallcontinue ln intended to and does attach to and run with the land affected herein. tha undersigned landowners, CHAMBERS DEVELOPMENT under it. lt is the intent of CHAMBERS DEVELOPMENT create a mntinuing obligation and rlght on the parl of themselves and subject land, The foe is a personalobligation of the owner of the land made and the owne/s heirs and assigns. with payment of part of or ellthem reducing the obligations of the others by the amount of the 6. MODIFICATION: Neitherthe oyvners northeir withdraw from or dissolve this agreernent without the wrltten approvat 3. (a) The sum of $ 10,o00'00 [rEN THOUSAND AND be paid at the time the City issues the initial building permit. approximately $45,7?9.57 (FORTY iittoo DoLLARS) is to be Paid at 8. The real ppperty on wfrich Development Applicantparticularly described and set r6rttr in Exhlblt.l i vt i"t, i['a rcgalproperty and is attached to and part of this agreement. io (r STATE OF OREGON BY: ) )s.s. System Development Charge Agreement for Deferral 70/01/2002 TUE 13:45 ITXIRX N0 7405t @oor rHur o/ Jutrl - l -UZ lrl .Uo, Charge specified in accordance with the 00 DOLLARS) ls to THOUSAND SEVEN completion of that the Payment is the payment required Building occupanry or other approval as nicipal Code. ln the Development Applicant (b), no final approvalwill be the obligations set forth Charge set forth or defects, jurisdictional or but not limited to methodology of the Thls agreement is agreement is binding on person(s) claiming land owner(s), to uent ownors of the which the development is the obligation by any of in interest may modify, the City of Springfield Development Applicant conditions of this place a lien in the amount payment schedule property upon which the of Springfield in 505 et. Seq. and City of Code will the project is more of the subject between the parties to action or includlng party in such action or party recovers a judgment fees and CHAMBERS NT CORP Namo: Title: Page 2 of 3 uul-l-uz l.J:uo;rAuE +/ f SENT BY: SPBINGFIELD PW; coUNTYOFLANE ) Before me this to me foregoing document and he 6@) 54] /UE,] U'Z] ; day of Cac being the Notary of My commission personallY appeared of Chambers 7Oz-BY: STATE OF OREGON GOUNTY OF I.ANE me this who executed the foregoing same. System Development Charge Agreement for Defenat OF System Development Administrator of Oc*tD&2002,appeared to me personally known known to the person and he (she) acknowledged he (she) executed the Notary of Oregon My commission expiros: to the who executed the the same. Page 3 of G \-i..ri ;:,i,1;ai if..:,1 , Llj;il;; rr LrJll, il.JLrt-,1 pl.rEll.rt^ ;..,iifCON | .?,?,t.1,\.i,..r., i.Jj j .j,,1..;?a7 ,.i!5 ) ) ) s.s. A,w OFFICIALSEAL DENI{IS P EBNST XOTARY PUBTIC . OREGOII c0MMrsstoil N0.333877 xrqHMEs[$mrusAPruil m 70/07/2002 TtrE 13:45 ITX/RI N0 74051 @ooq ( + I CHAMBERS DEVT ,,ru "o,rdrf,?Sr#Fiouo, c oR P. EucENE, On szaor- --" (s41) 48s_s61 1 231 3 SIUSLAW VALLEY EUGENE, OREGON 96-229-1232 BANK 97440 CITY OF SPRINGFIELD Thousand Seven Hundred Seventy_N ine and 5711 CITY OF SPRINGFIELD 38OO SPORTS WAY 4t4t2003 $"zs,zzg.sz P o .a u_I !.: ; E I il.oo el l:ll. r: I ?l ao a ag :lt.' L5 OOgEq Orr. DOLLABS lr" (. ,\ PAY TO THE ORDER OF MEMO SENT BY: SPBINGFIELD PW; t-s/ol/\z TUE 10:45 FAX 1 641 ' 8{51 54 1 /JOl UZI ; CflATBERs CONST U\, l- l-Uz lo:u+,TAUE J/ J , ldloo2 EXH16[T'A' PARCEL I: PARCEL II: Lots-7_ahd 0. GOIHERCIAL pAR[, as platted and recarded lnand 50'1. Lane county oregon piat-Rft;idi; Tii-uiii-to[iti,File 73. Slides 503 Oregon, CENTER thence50'07 {0' }lest e90n LA/OL/Oz TUB IO IE tTXlBI NO 6063J L0/ot/2002 TIJE 13:45 ITXIRX N0 7405t @OOS sti 50' ono .86 lni 25, la I of ,aslat to 53 sal d andfeetJr. 79- 0f al ne'.14 sa I @til ffi Geotechnical & (orylruction Services March 27,2003 Project No.2027120 Report No. E02343 Ms. Silva Sullivan CDC Management 2295 Coburg Rd., Suite 200 Eugene, Oregon 97401 Fnal Sunamanv RepoRr Sports Way Business Park Ph. 1 3800 Sports Way Springfield, Oregon Build ing Permit #02-0081 8-01 Dear Ms. Sullivan, This letter confirms that FEI Testing & lnspection, lnc. performed special inspection services in accordance with UBC and as directed by our client for the above-referenced project. We were employed to provide continuous or periodic inspection on specific dates, as documented per our special inspection reports for: tr earthwork M structuralmasonry M epoxy dowelslwedge anchors EI reinforced concrete tr bolts installed in concrete M structural welding (shop/field) M high-strength bolts tr spray-applied fireproofi ng Based upon our observations and written reports of this work, it is our judgment that the inspected work was performed, to the best of our knowledge, in accordance with the approved plans, specifications, change orders and/or structural engineer's instructions, and applicable provisions of Chapter 17 of the Uniform Building Code, unless otherwise noted or referenced above. Respectfully, c:Chambers Construction - Brian Erickson Endex Engineering - Dave Morris Eric HallArchitects City of Springfield w 820llW(ornellAvenue'(orv:liis,0regon 97330 ' phone (541)757'4698'fax(541)757-7650 29540BAirportRoad.Eugene,0regon97402'phone(54.l)684-3849'fax(5al)684-3851 l/,t: il-*- Michael t. Me#r Technical Manager CITY ( ATTACHMENT A . DEFE.RRAL ,RINGFIELD SYSTEMS DEVELOPMENT CHARCE ^(KSHEET JOURNAL OR JOB NUMBER 02.00818-OI NAME ORCOMPANY: LOCATION: MAP & TAX LOT NUMBER: DEVELOPMENT TYPE: I. STORM DRAINAGE IMPERVIOUS SQ. FT. SPORTS WAY BUSINESS PARK 38OO SPORTS WAY 17-03-1s-32 00200 PIONEER PACIFIC COLLEGE - GENERAL OFFICE BUILDING NEW COLLEGE AREA (S.F.) GENERAL OFFICE AREA (S.F.): BUILDING FOOTPRTNT AREA (S.F.): TOTAL IMPERVTOUS SURFACE (S.F.): 35,461 x $ 0.282 PER SF 16,716 3,564 1 0,1 s0 55,585 LOr SrzE (S.F.): TOTAL STORM DRAINAGE SDC: S 22.09 PER DFU x x $95. I 0 PER FEU PER FEU ITE: ITE: ITE: 540 710 131 2. SANITARY SEWER.CITY A. REIMBURSEMENT COST NUMBEROF DFU's B. IMPROVEMENT COST: NUMBEROF DFU's (SEE REVERSE SIDE) 0 4. SANITARY SEWER. MWMC NEW: COLLEGE A. REIMBURSEMENT COST: NUMBER OF FEU's B. IMPROVEMENT COST: NUMBER OF FEU's NEW: OFFICE A. REIMBURSEMENT COST: NUMBEROF FEU's B. IMPROVEMENT COST: NUMBER OF FEU's MWMC CREDIT IF APPLICABLE (SEE REVERSE) 5. ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) $9.95 0.00 SI9O.2O PERFEU 0.00 x SI9.9O PER FEU TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE: MWMC ADMINISTRATIVE FEE: TOTAL MWMC SDC: SUBToTAL (ADD ITEMS 1,2,3,&4) x 5o/o TOTAL TRANSPORTATION ADMINISTRATION FEE: TOTAL SEWER ADMINISTRATION FEE: TOTAL SDC CHARGES $ 10,000.00 x 0 x $ 16.79 PER DFU TOTAL LOCAL WASTEWATER SDC: 3. TRANSPORTATION NEW COLLEGE: BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR A. REIMBURSEMENT COST: 0.00 x 18.36 x $ 16.81 PERTRIP x I NTF B. IMPROVEMENT COST: 0.00 x 18.36 x $ 74.17 PERTRIP x I NTF NEW oFFICE: E6dnra rG-sF * rRIp nareffieR ADr x NEw rRrpiltlb-R- A. REIMBURSEMENT COST: 0.00 x 11.01 x $ 16.81 PER TRIP x 0.9 NTF B. IMPROVEMENT COST: 0.00 x I 1.01 x $ 74.17 PER TRIP x 0.9 NTF TOTAL TRANSPORTATION REIMBURSEMENT SDC: TOTAL TRANSPORTATION IMPROVEMENT SDC: TOTAL TRANSPORTATION SDC: 0.00 0.00 x $ PantLeLa_). Owwb eu August 29, 2002 10 02-0odP6 f 9PBP[Nffiffi gs I x gss pARK DE F E RRAD,,t56o s po Rrs wAy.xls JULY 2OO1 -o 1070 l09l 109?, 1093 r094 r055 1056 1078 t07g DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FXTURE UNITS (NOTE: FOR REMODELS,CAICULATE ONLY TIIE NET ADDITIONAL FLXTURES) FIXTURES NEW OLD 8 UNIT DRAINAGE FIXTURE UNITSFIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC. INTERCEPTORS FOR SAND/AUTO WASFVETC. LATINDRY TUB CLOTHES WASHER/MOP SINK CLOTHES WASHER - 3 OR MORE (EA) MOBILE HOME PARK TRAP (I PER TRAILER) RECEPTOR FOR REFRIGERATOR/WATER STATION/ETC. RECEPTOR FOR COMMERCIAL SINK/ DISHWASHER/ETC. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: COMMERCIAL, RESIDENTIAL KITCHEN SINK: COMMERCIAL BAR SINK: WASH BASIN/DOUBLE LAVATORY SINK: SINGLE LAVATORY/RESIDENTIALBAR URINAL, STALUWALL TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: NUMBER OF EDU'S* CREDIT FOR PARCEL OR LAND ONLY IF APPLICABJ $4.47 IMPROVEMENT (IF AFTER ANNEXATION DATE) ALENT 0 3 I 3 J 6 2 3 6 12 I 2 2 3 2 2 I 5 6 3 0 2 4 2 t2 0 0 0 2 6 0 0 0 0 0 0 2 6 0 0 8 2 10 l0 60 TOTAL DRAINAGE FIXTURE UNITS-104 -fOU <gqrlr"t""t O CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEPARATELY 0 0 0 YEAR ANNEXED RATE PER Sl,OOO ASSESSED VALUE YEAR ANNEXED RATE PER SI,OOO ASSESSED VALUE 1979 orbefore 1980 r 981 t982 1983 I 984 I 985 I 986 l 987 I 988 I 989 $ 4.92 $ 4.83 $ 4.77 $ 4.64 $ 4.47 $ 4.30 $ 4.09 $ 3.78 $ 3.41 s 2.98 $ 2.s2 r 990 I 99t 1992 r 993 1994 1995 1996 1997 I 998 1999 2000 S s s $ $ $ $ $ $ $ s 2.06 1.64 t.45 r .31 I.t3 0.97 0.82 0.63 0.41 0.22 0.04 x x 0.000 $0.00 $0.00 s0.00CREDIT TOTAI 02-00818-01, SPORTS WAY BUSINESS PARK DEFERRAL, 3800 SPORTS WAY.xls JULY 2OO1