HomeMy WebLinkAboutPermit Building 1997-04-18COMM ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
LOCATION OF PROP
ASSESSORS MAP
SPRINGFIELO JOB NUMBER 1
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
sl
PHONE:
q7q7 7ZIP:
5
STATE:b4L
OWNER:
ADDR
CITY:
VALU /{&o
DESCRIPTION OF WORK:q
NEW- REMODEL ADDITION DEMOLISH OTHER
NAME ADDRESS PHONE
EXPIRES PHONEq6q D. rlt!5/rbq -{/7 7Hlt- /(il,il. lno-1*41 &a
ADDRESSCONTRACTOR'S NAME
ARCHITECT
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #
GENERAL:
PLUM BI NG
PLU M B ING
NO FEE CHARGE
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backf low Device
TOTAL PERMIT
NO FFF CHARGF
1Q0,000 BTUs
Furnace/burner & vent
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended weiToilloor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
from
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
HANDICAP ACCESS: -
FLOOD PLAIN:
ZONING:
LIGHTING POWER BUDGET:
WATER HEATER:-
- OFFICE USE -
LAND USE:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
* OF UNITS:
SQ. FT.$/SQ. FT.VALUE
TOTAL VALUE OF PROJ
X
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
PLAN CHECK FEE RCPT,'DATE BY
BUILDING PERMIT tL4r'4tT-PLUMBING DEMOLITION
5% State r 44
Surcharqe r 1/n C.r/3 5% State
Surcharge
MECHANICAL 3,8b FENCEy{tuE$_
5% State
Su rcharoe SIDEWALK
FT,
SUBTOTAL
PERM ITSPAVINGCURBCUT
FT.
SYSTEMS
DEVELOPMENT
/TOTAL PERMIT FEES
EXCLUOING ELECTRICAL
REQUIRED INSPECTIONS \V
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
l26.gl6g(recorder), state your City designated job number, iob address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:oo a.m. will be made the same working day, requests made after 7:00 a-m' will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before anY work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to Placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equi Pment, conduit'
piPing, accessories and other
ancillarY equiPment items are
ln Place but before anY
concrete is placed,
UNDERGROUND: Plumbing,
electrlcal, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical' To be
made Prior to installation of
floor insulatlon, decking or
floor sheathing.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATT]C DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to Placing
facing materlals and before
framing lnspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all PiPes, chimneys
and vents are comPlete and
the rough electrical, Plumbing
and mechanical are aPProved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in Place but
before any lath or gYPsum
board lnterior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to Plans.
LATH AND'OR GYPSUM
BOARD: To be made after all
lathing and gYPsum board'
interior and exterlor, ls in
place but before anY
plastering ls aPPlied or before
gypsum board Joints and
fasteners are taped and
f inished.
PAVING: After gravel is in
place but Prior to Placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be f urnished to the Building Division.
STRUCTURAL CONCRETE: IN
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening oPerations. (306
a.6)
SPRAYED ON
FIREPROOFING: U B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnsPection
Certificate bY an aPProved
agency, furnished to the CitY's
Building Division before
beams are Placed. (2501 U.BC.
STDS. 25-10,11).
STRUCTU RAL MASONRY: (306
a.7)
*ln addition to the insPec-
tions specified, the Building
Official may make or require
other inspections of anY
construction work to ensure
compliance with the Building,
City or DeveloPment Code.
POST & BEAM: To be made
Prior to lnstallatlon of floor
insulation, decking or floor
sheathlng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made Prior to installation of
decking or floor sheathing'
MASONRY: Steel location'
bond beams grouting or
vertlcals in accordance with
uBc 2415.
n
ROOF SHEATHING AND
NAILING: Prior to installing
anY roof covering.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating comPlete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but Prior to Placing
concrete.
Signature
Date 4-/8-77
ah al fon onrmatierticdandhotyeteocatinbyetednedethappcomumplexachavearefhatvandree,tate ag h oe rd ancn esu re,natSI erdanc hoaccsByhaldbeoneedrformSalworkhatdpeanrtceanyfuherlyrtfreoandctancd CYnrelStruPANoOCCUNhenrerandhatcrbedhethrkwoednirtaintoosonethofpeStateofregLawsthandeldeficiSofngeandmofhtypriractocontrSployeesonlthatfuherrtcertvsion.tyDiviulBtdofonheSafetyngSSIthouwipermstructu reemadofIWIbeany thn s ectusebeoproJd.055ithRSo701anceteancomhop
leab mfro ethreaddSsreadhatrojecttedatheme,pareSUEpropen5onreqaluredurensathreqpectitoreeehert altefuagnmalonslheaSnwlreetohepandpprovedf ron theof rty,e peprothschathepermstreet,
times during nstru c
VALIDATION 5
4-ECEIVED:
RECEIVED BY:
DATE PAIDAMOUNT R
RECEIPT I:
FTNAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FTNAL FIRE DEPARTMENT
SITEPLANREvIEwBoARD:Mustberequested2daysinadvance
;; i;"'J.iu vou wish inspection. All project conditions such as
i"^t"""pi"g1 parking lot stri ping, etc' must be completed before
requestlng thls insPection.
FINALBUILDING:Requestedafterthefinalplumbing,electrical,il;;h;^l;;l ina rit" Department inspections are made and
approved. No occupancy of the premises can be made until a
cL?tfif ".t" of Occupancy has been issued by the Building Division
and posted on the Premises'
ADDITIONAL COMMENTS:
DATEPLANS REVIEWED BY
L
l,llanville Four rly
Mineral-Surface
Fiber Glass
Built-Up Roofs
Spocificalion Nt,. 4GNC
For use over Plywood or other
Nailable Decks on lnclines of %"
to 6" per Foot
ForRegions2&3
U.L. Classilicatiorts
Class A
Max. Slope: 1"
Deck: Non-Combust.
& Combust.
lnsulation: none
Surfacing: Cap Sheet
Class B (see Class A)
ClassC(seeClassA&B)
Nailable Deck
Sheathing Paper
(lf Required)
GlasBase
or Venlsulation
Asphalt
(o(,
.' 2" ..
GlasKap
Mineral Surlace
Cap Sheet. . .
End Laps Broken
3'Aparl (Min.)p
Eo
18"
Asphalt
-1
Nails
(o
C'
Asphall
tu .9"
@
@
C7,
Premier or
GlasPly lV -
GlasPly
.01 General
This specification is for use over any type of struclural
deck (without insulation) which can receive and ade-
quately retain nails or other types of mechanical fas-
teners as may be recommended by the deck manufac-
turer. Examples of such decks are wood and plywood.
This specification is not for use over lightweight insulat-
ing concrele decks either poured or pre-cast or over f ill
made of lighlweight insulating concrete.
Note: All general instructions contained in thecurrent Manville
lndustrial/Commercial Roofing Systems Manual shall be con-
sidered part of this specification.
Flashlngs: See section on BUR Flashinqs, Manville
lndustrial/Commercial Roofing Systems Manual
.02 Matetials l)ot i()() st1 ll tl rt)ri ;lty.t
Sheathing Paper: Wood board decks only
Felts: GlasBase'" or Ventsulation@ Felt .
GlasPlyo Premier or GlasPly(D lV. . .
GlasKape' Mineral Surlaced Cap Sheet . . . . .
Bitumen: Refer to Para.7.7 or 11.0.3.2
Approx. installed weight (lbs.): 165-245
Prior to application, cut the cap sheet into handleable
lengths (12'-18') and allow to flatten.
.03 Alrlrlicaliorr o/ lkxtlirt,.l
Over wood board decks one ply of sheathing paper must
be used under the base felt next to the deck.
Using GlasBase, start with a 12" width. Following lelts to
be applied full width, lapping each felt 2" over the
preceding one. Nail the laps at 9" centers and down the
longitudinal center of each felt nailtwo rows of nails with
rows spaced approximately 11" apart and nails stag-
gered on approximately 18" centers. Use nails or fas-
teners appropriate to the type of deck. See Fastener
Data in general instructions.
Starting at the low edge of the roof area apply one 18"
wide, then a full 36" wide GlasPly Premier or Glas Ply lV.
All following felts are to be applied fullwidth overlapping
the preceding felt by 24'?/i', giving 3 full plies at all points.
lnstall each felt so that it shall be firmly and uniformly
set, without voids, into the hot (within 25"F of the EVT)
asphalt applied just before the felt at a nominal uniform
rate of 23 lbs. per square over the entire surface.
Starting at the low edge of the roof area, apply one layer
of the cap sheet, being sure to maintain 2" side laps and
6" end laps over the preceding sheets. Apply the cap
sheet in a full width mopping of hot asphalt (approx.
20'F above the EVT lo maximize bonding of the cap
sheet to the ply sheets) at the approx. rate of 23lbs/sq to
the ply sheet(s), also applying asphalt to the side lap
area on the backside of the cap sheet. Then flop the cap
sheet into the hot asphalt. At ambient temperatures
below 70"F, see the cold application section of the
Manville lndustrial/Commercial Roofing Systems
Manual. The cap sheet must be firmly and uniformly set
into the hot asphalt with all edges well sealed. For slopes
Nailing: For slopes greater than 1" per foot: nailing is
required. Refer to Para. 11.0.6.
'GlasPly Premier required for No Dollar Limit (NDL) Guarantees.
layer
layer
plies
layer
'l
2
1
BU-560Sec ll Pg 16 ll-87
.l
(o(,)
. Lap
6" End
Manville Four Ply
Mineral-Surface
Fiber Glass
Built-Up Roofs
Specification Ntr. 4GNC
For use over Plywood or other
Nailable Decks on lnclines of %"
to 6" per Foot
ForRegions2&3
U.L. Classifications
Class A
Max. Slope: 1"
Deck: Non-Combust.
& Combust.
lnsulation: none
Surfacing: Cap Sheet
Class B (see Class A)
ClassC(seeClassA&B)
Nailable Deck
Sheathing Paper
(lf Required)
GlasBase
or Ventsulation
Asphall
+
2" .: .....
GlasKap
Mineral Surface
Cap Sheet
End Laps Broken
3'Apart (Min.)g
Eo
I
.l
I
1
a
Nails
Asphalt
,t"--l+
Asphalt
\
\!---+.
ol
9"H
@
Premier or
GlasPly lV -
GlasPly
.01 General
This specification is for use over any type of structural
deck (without insulation) which can receive and ade-
quately retain nails or other types of mechanical fas-
teners as may be recommended by the deck manufac-
turer. Examples of such decks are wood and plywood.
This specification is not for use over lightweight insulat-
ing concrete decks either poured or pre-cast or over fill
made of lightweight insulating concrete.
Note: Allgeneral instructions contained in thecurrent Manville
lndustrial/Commercial Roofing Systems Manual shall becon-
sidered part of this specif ication.
Flashings: See section on BUR Flashings, Manville
lndustrial/Commercial Roofing Systems Manual.
.02 Matetials/)or i/lrl sr1 ft ol turtf ar r:rt
Sheathing Paper: Wood board decks only .1 layer
Felts: GlasBase'" or Ventsulationo Felt . 1 layer
GlasPlyoPremierorGlasPlyo lV. ... . 2plies
GlasKapo Mineral Surfaced Cap Sheet . . . .. 1 layer
Bitumen: Refer to Para.7.7 or 1'1.0.3.2
Approx. installed weight (lbs.): 165-245
Prior to application, cut the cap sheet into handleable
lengths (12'-18') and allow to flatten.
.03 Applicatiolr of lloof intl
Over wood board decks one ply of sheathing paper must
be used under the base felt next to the deck.
Using GlasBase, start with a 12" width. Following felts to
be applied full width, lapping each felt 2" over the
BU-560Sec l1 Pq 16 1J'87
preceding one. Nailthe laps at 9" centers and down the
longitudinal center of each felt nail two rows of nails with
rows spaced approximately 11" apart and nails stag-
gered on approximately 18" centers. Use nails or fas-
teners appropriate to the type of deck. See Fastener
Data in general instructions.
Starting at the low edge of the rool area apply one 18"
wide, then a full 36" wide GlasPly Premier or Glas Ply lV.
All following felts are to be applied fullwidth overlapping
the preceding felt by 242/s", giving 3 full plies at all points.
lnstall each felt so that it shall be firmly and uniformly
set, without voids, into the hot (within 25oF of the EVT)
asphalt applied just before the felt at a nominal uniform
rate of 23 lbs. per square over the entire surface.
Starting at the low edge of the roof area, apply one layer
of the cap sheet, being sure to maintain 2" side laps and
6" end laps over the preceding sheets. Apply the cap
sheet in a full width mopping of hot asphalt (approx.
20"F above the EVT to maximize bonding of the cap
sheet to the ply sheets) at the approx. rate of 23lbs/sq to
the ply sheet(s), also applying asphalt to the side lap
area on the backside of the cap sheet. Then flop the cap
sheet into the hot asphalt. At ambient temperatures
below 70"F, see the cold application section of the
Manville lndustrial/Commercial Roofing Systems
Manual. The cap sheet must be firmly and uniformly set
into the hot asphalt with all edges well sealed. For slopes
Nailing: For slopes greater than 1" per foot: nailing is
required. Refer to Para. 11.0.6.
'GlasPly Premier required lor No Dollar Limit (NDL) Guarantees.
. 6"End .'
(o(,
. Lap