HomeMy WebLinkAboutPermit Building 1992-08-14b65, ee
COM M ERCIAL/ I N DUSTRIAu
PERMIT APPLICATION
225 Fiffi Street, Springfield, Oregon 97477
LOCATION OF PRO S
ASSESSORS MAP:
SPRINGFlELE,JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:(
tl
f,
I
I (
owNER: , b, O/+n fE L ptoNt,
ZIP:E-'tSTATE:n /(E
ADDRESS:
CITY:EUGtrlUE
ZqVZ To*/*tf-/tvk Lfu,
DEScRTpIoN oF woRK , tl F ROots E*9 r fr
""
^ OC, V/- '' cAr+9J ',h/l rtoo F
NEW
-
REM.DEL ADDrroN DEM.LT'H orHER vaudalOZ*
ELECTRICAL:
NAME ADDRESS PHONE
ADDRESS EXPI RES PHO NE
E(/GEL/E OAq74.02
CONTRACTOR'S NAME
ARCHITECT:
MECHANICAL:
CONST.
CONTRACTOR #
G ENERAL:
PLUMBING
PLUMBING
NO.FEE CHARGE
Relocated Bldg
(new f ix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
N4ECHANICAL
NO FFF EHARGtr
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
from
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE -
ZONING
HANDICAP ACCESS:
LIGHTING POWER BUDGET:
WATER HEATER:
CONSTR. TYPEr
HEAT SOURCE:
LAND USE:
# OF UNITS
OCCY GROUP:
Y OF STORIES:
QUAD AREA:
C OF BLDGS:
FLOOD PLAIN:
SO. FT.$/SQ. FT,VALUE
TOTAL VALUE OF PROJECT
x
x
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
PLAN CHECK FEE RCPT#DATE BY
BUILDING PERMIT IoA5()PLU M BI NG DEMOLITION
5% State
Surcharge 6,(3 5% State
Su rc harge
MECHANICAL FENCE
VALUE $
5% State
Su rcharge
SIDEWALK
FT.
SUBTOTAL
PE RM ITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
5TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
Single Fixture
- REQUIRED INSPECTIONS v
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SPECTAL TNSPECTIONS: ln accordance
ELECTRICAL & and approved. section 306 0f the State Specialty code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & oy ine owner/ Contractor during
CURTAIN WALLS construction of the following work. A
FOoTINGS & FOUNDATIONS: F,^FB, A^E. r copy of the special testing reports shall
To be made after trenches are FIREPLAGE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected, ail steel in place, but f raming inspection' srRUcruRAL CoNCRETE: ln
prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1)
coNcRErE sLAB: ro be tT:J;:f; ilJ'3['Jlfli,t],? ," srRUcruRAL wELDS:
made after all inslab building place aid all pipes,ihimneys Performed on the iob. (2722 I)
service equipment, conduit, and vents are'complete and
:i'J1,?,i""?",:;:ffi ?i:*""'::J n'.'fl::li,lffii:,1'JJ;[:::: Blf,:f;?E]?T[,?i,SH:".
in place but before any tightening operations. (306
concrete is placed. TNSULATTON & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON
electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.
storm sewer, water and before any lath or gypsum Standards 43-8.
drainage lines. To be made board interior wall covering is
prior to covering or filling applied. S'ECIAL GRAD,NG,
t re nc hes.
,NDERFL..R: p,umbins I:::,I""="'fmX;[H]* il:iUt'iiil-:li"'5Jb'j]'"1
electrical, mechanical. To be according to plans. chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/SR GYPSUM GLU'LAM BEAMS: lnspection
f loor sheathing. BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency' furnished to the City's
poST & BEAM: To be made interior and exierior, is in Building Division before
priortoinstallationoffloorplacebutbeforeanybeamsareplaced.(2501U.Bc.
insulation, decking or floor plastering is applied or before STDS' 25-10'11)'
Sheathing'gypsumboardiointsand fasteners are taped and STRUCTURAL MASONRY: (306
FLooR TNSULATToN & finished' a'7\
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating comPlete and form
bond beams grouting or work and sub-base material in
verticals in accordance with place.
UBC 2415.
CURB AND APPROACH
ROOF SHEATHING AND APRONS: After forms are
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All proiect conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this insPection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the Premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that No ocCUPANCY
will be made of any struciure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with oRS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, tn"t tn" permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction
Signature Date
VALIDATION DATE PAI
RECEIVED
AMOUNT FIECEIVED
RECEIPT *:
Nailaole/M inerahSurface
Asphalt 33-NCl
Perma Mop 33E-NGI
PERMA PIY.R
32-NCr 31-NCt32E-NC| 31E-NCI
PERMA PtY.6 , PERMA PLY.IV
Areas tt,lll
@
Milable
O{k
Red
Rosin
Wood
Decks
2'.Id.l.p
PERMA or
Emulsion &
Granules
Nominal lnstalled Weight-l77 lb I 1OO ftz
Nominal weights provided for design consideration.
Application of Base Plf''
Apply PERMA PLY base ply with 2' (min. 1'l side laps and
end laps. Mechanically secure maximum 9' o.c. at side laps and
maximum 18' o.c. on two lines 11-13' from each edge (staggered).
Mechanical securement using mechanical fasteners recommended
by the deck manufacturer. Large-head Simplex nails (minimum
'70' head diameter), or the Senco Fastening system may be used
on wood or plywood decks only. To minimize wrinkles and buckles
allow enough time for base ply to relax unrolled prior to attachment.
Application of Plies
Embed two plies of PERMA PLY in shingle fashion (starter sheets
required), lapping 19" into uniform solid moppings of hot bitumen,
using 23-45 lb/100 ft'l per ply. Starter plies should be cut to dimen-
sions so as to preclude coincident side laps to the base ply. Plies
may be left exposed up to six months without surfacing.
Application of Mineral Surface
Embed nominal 12-ft. lengths of PERMA CAP (18-ft. in Area lll)
with 2' (min. 1'l side and end laps into a uniform solid mopping
of hot bitumen, using 2O-30 lb/10O ftl PERMA CAP end laps shall
be staggered minimum 3 ft.
Application of Emulsion and Granules
Uniformly embed minimum 5O lb/1O0 tt'1of No. 11 roofing granules
into uniform coating of emulsion using not less than 2 gal/100 ft?
A minimum 30 day wait is recommended before applying emulsion
and granules.
' 33-NC, 32-NC and 31-NC are recommended over lightweight concrete in
the following states: Texas, Georgia, South Carolina, Alabama, Louisiana,
Mississippi, Florida, California Area lll, and Arizona Area lll.
'Base Ply-may be specified PERMA PLY No. 28, PERMA PLY-IV, PERMA
PLY-6. or PERMA PLY-R. lf PERMA PLY No. 28 base sheet not used, base
ply used must be the same as the ply felts.
I Red Rosin-recommended on all wood and plywood decks, required on
wood plank decks. Not required where PERMA PLY No. 28 is used as
base ply.
General
Note
All general instructions contained in the General Requirements
section of Owens-Corning Built-Up Roofing Products Reference and
Application Guide, Pub. No. S-RW-13121 shall be considered part of
this specification.
Drainage
Roof decks must be graded to drain all water freely. Drains shall be
sufficient in number and size to assure rapid elimination of water
from the roof surface
Nailing
Ply felts must be back nailed on inclines exceeding 2' per foot.
On slopes between 2' and 3' per foot, back nailing shall not exceed
B foot on center. On slopes greater than 3' per foot, back nailing
shall not exceed 48" on center. Felts are to run parallel to the incline
and must be secured 18- in from the back edge of the felt. Each
nail must be covered by succeeding plies. High temperature areas
may require nailing on lower slopes.
Ply EdS To
Ey Edg.
PERMA
A.cr ol Pty
To N.il
Flashings
See Flashing Section of Owens-Corning Built-Up Roofing Products
Reference and Application Guidg Pub. No. 5-RW-13121.
,3
lnterply/
Surfacing/
Slope
Bitumen
Type
Materials
per 100 ft'z
lnterply
Base Ply2
Felts
Bitumen
O-y.'
Y"'3"
o-3"
3-6',
3-6"
Surfacing
Asphalt
0-3"
o-3"
J-O
3-6"
PERMA CAP OT
Emulsion and
No. 11 Roofing
Granules
ll,lll
lll, lv
Perma Mop
IV
Perma Mop
III, IV
Perma Mop
IV
Perma Mop
1 plv
2 plies
50 lbs
5O lbs
50 lbs
40 lbs
40 lbs
25 lbs
25 lbs
2O lbs
2O lbs
75 lbs
2 gal
50 lbs
.' owENS/CORNltlG
FIBERGIAS
Sidelap Nails
G
lntcmcdhlc Faalmm
16'o.c.
f--------.
-I
12'l_
t2'
UA47P--t-ct,,1 zC ::,t7 l14i-Y
3" ( /12)
1tt
No n{ ll
lU ll"/ i
1] rt
2"
4n
t'Rd.
t'Lg.
r-l
llultc;ti: ,tAi'r iL:?tAt-l- lvf ti.
,h:
c,1lr
L frt'
:_J,,1 L
trt i,;' -) i Ei' ;-in'f' t ( i l'
ii
t
I
'L'
z t ti'ti(
v7,)
l,b' frgT LL'/L/C
I
I
I
I
:
; r,1t /.P'a
-2,
(Y.
trL-,/T/+?
(evtl,U
7tr'7'
{4r
ex
-q,iL'i,'
I ,ii.a
k!'ln
l
I.
c; i- ?
L ;
)
;q il
i t, tfit