Loading...
HomeMy WebLinkAboutPermit Building 1991-08-01k (rt ?z7e? SPRINGFIELO I 6a ?rcrasCOM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:.a 4s rl ')rt h ASSESSORS MAP:/ so 4nx ror /7-o 3 - 27tl - f,ta 7 PHON E: .,r, ?71a /STATE: OWNER ADDRESS: CITY: ADDITION VALUEDEMOLISH OTHERREMODEL DESCRIPTION OF WORK:*r* x NAME ADDRESS PHONE CONST. ADD PHON Eg3*IL -d -g(/ EXPIRESCONTRACTOR'S NAME ARCHITECT: MECHANICAL: ELECTRICAL: GENERAL: PLUM BI NG PLU MBIN G NO.FEE CHARGE /5 Single Fixture /o*/ 5o"o Relocated Bldg (new f ix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backflow Device TOTAL PERMIT /5ooc MECHANICAL NN FFF CHA RGtr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ ZONING HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER CONSTR. TYPE: HEAT SOURCE: LAND USE: # OF UNITS OCCY GROUP: * OF STORIES: QUAD AREA: # OF BLDGS SQ. FT.$/SQ. FT.VALUE 4,2/aoEiQr ",'r,''it/,QlM TOTAL VALUE OF PROJE X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER .4.P 63 -n7-Z Vry/tRCPT#PLAN CHECK FET DATE BY ZZ3,/3 BUILDING PERMIT GZ,fO PLU M BI NG / 50."o DEMOLITION 5% State Surcharge 3,/?5% State Surcharqe 7.so MECHANICAL FENCE VALUE $ 5% State Surcharge SIDEWALK FT SUBTOTAL PEBM ITS PAVING CURBCUT FT, SYSTEMS D EVELO PM E NT TOTAL PERMIT FEES EXCLUDING ELECTRICAL -V REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in x made after excavation, but prior to setup of forms- UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor duri ng construction of the following work. A copy of the special testing reports shall be f.urnished to the Building Division. STRUCTURAL CONCRETE: In excess ol 25OO P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghtening operations. (306 a.6) Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.'11 & Chapter 29) GLU-LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (s06 a.7) *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. BARRIER: To be made after all insulation and required vapor SpRAyED ONbarriers are in place but FIREpROOFING: U.B.C. UNDERGROUN electrical, gas,SEWET, storm sewer, water and drainage lines. To be made prior to covering or f illing t renc hes. UNDERFLOOR Plumbrn, 6lectrical, mecrranrcai. io oe made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheath i ng. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with u3c 2415. RooF sHEATHTNG AND iHRS^H?tti'T:f""1'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. umbi F]NAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises.FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and lfurther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with OFIS 701.055 will be used on this project. I furtheragree to ensure that all required inspections are requested at the propertime, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Signature Date VALIDATION AMOUNT RECEIVED RECEIPT *:RECEIVED BY: DATE PAID: t/ Atk 1 ^ ?,/' 2DBaa.- A4A SITE PLAN REVIEW DEVELOPMENT AGREEMENT This DEVELOPMENT AGREEMENT, hereafter "Agreoment", ls entered lnto thlszG day of rvtrh<c{{ , 1990 (the "Effective Date") by and between the ClTy OF SPRINGFIELD, hereinafter "City", and herinafter "Applicant", in accordance 3.080(3), 3.090(3), and 3.100(3). with section 31.090 , ahd section 3.070(3), RECITALS WHEREAS, on the 11th day of November, 1990, the City approved the Final Site Plan Application submitted by the Applicant for the purpose of the following: CITY JOURNAL NUMBER 90-10-153. Tyoe ll Site Plan requesting approval for the ccnstruction of an eight unit apartment complex and parking lot on a vacant parcel of land. The property is located mid-block on Pheasant Street, (Assesors Map 1 7-03-27-12; TaxLot 500). The property is zoned Medium Density Residential and also designated Medium Density Residential in the Metropolitain plan. WHEREAS, in consideration for Site Plan approval, the issuance of a Building Permit, and the issuance of an Occupancy Permit, as specified in the Springfield Developrnent Code Section 31.090, Applicant agrees to comply with all of the standardsof the Springfield Development Code and the Springfield Municiple Code which may be applicable to this development project unless modified or eicepted by the Site pLan Review Development Agreement, Planning Director, Planning Commission, Building Official or their agents, or the Fire Marshall, which modifications or exceptions shall be reduced towriting. WHEREAS, in consideration for Site Plan approval, the issuance of a Building Permit, and the issuance of an Occupancy Permit, as specified in the Springfield Development Code Section 31.090, Applicant agrees to comply with the following specific conditions imposed by the city as part of the site plan approval: 1. All improvements must be constructed/ installed as shown on the Final Site Plan prior to final building inspection. 2. Recording of an lmprovement Agreement, at the applicant's expense prior to the issuance of a building permit. THEREFORE IN CONSIDERATION OF THE FOREGOING RECITALS WHICH ARE EXPRESSLY MADE A PART OF THIS AGREEMENT, CITY AND APPLICANT AGREE AS FOLLOWS: 1. FINAL SITE PLAN. The applicant has submitted a Final Site PLan in accordance vrith Section 31.080 of the Springfietd Development CoCe. 2. STANDARDS. The applicant agrees to fullfill all applicable standards specified in the Springfield Development Code and the specific standards listed in the RECITALS prior to occupancy, unless certain conditions have been defered to a later date in accordance with Section 31.040(4)(b) of the Springfield Development Code. ^ .^-. l. lnlT!/^.. 1. lal TL^ ,t --ti^^-r ._ J_.t!r:l.). L\ri'ii.lii i\Jiib. ine Appiicani agi-ees io irjiiiiii ail specific corrcjitiorrs crf appr<.rvtii required by the City listed in the RECITALS prior to occupancy, unless certain conditionshave been deferred to a later date in accordance with sectlon 31.o4o(4)(b) of the Springfield Development Code. 4. MODIFICATIONS. The Applicant agrees not to modify the approved Final Site Plan without first notifying the City. Modifications to the Final Site plan shail be reviewed in accordance with Section 31.100 of the Springfield Development code. 5. MAINTAINING THE USE. The Appricant agrees to the following: (a) The building and site shall be maintained in accordance with theprovisions of the Springfield Development Code in order to continus the use. (b) lt shall be the continuing obligation of the property owner to maintain the pianting required by Section 31.140 of the Springfield Development Code in an attractive rnenner free of t^veeds and cther invading vegetation. ln addition, plantings in the vision clearance area shall be trimmed to meet the 2 lt2foot height stanciard in accordance with Section 32.a7o of the springfield Development code. (c) Parking lots shall be maintained by the property owner or tennant in a condition free of litter or dust, and deteriorated pavernent conditions shall be improved to nraintain conformance with these standards. (d) Undeveloped land within the development area shall be maintained free of trash and stored materials in a mowed and attractive manner. Undevetoped land shall not be used for parking. 6. ln addition to all other remedies which may be provided by law or equity(including but not limited to penalties provided by applicable State Law or City Ordinances), Applicant agrees that City may enforce Applicant's responsibilities by withholding Applicant's Final Occupancy Permit, and terminating any temporary Occupancy Permit which may have been granted. 7. Any Final Site Plan approves becomes null and void if construction does not commence within one year of the date of this agreement. lN V/ITNESS WHEREOF, the Applicant and the City have executed this Agreement as of the date first hereinabove written. BY STATE OF OREGON, County of di-,'-,- BY L ,199$;jersonally appeared the above named / . i-,-a /ti ,/ 77 / !t^ voluntary act. Before me: {-.,,uJ q/r / qr who acknowledged the foregoing instrunrerrt to be their ,, )croA Notary Public for Oregon My Commission expires q-?'// 1-1t t -, Date