Loading...
HomeMy WebLinkAboutPermit Plumbing 1994-12-22COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 LOCATION OF PHOPOSED WORK ASSESSORS MAP: SPRIr.GFIELO O JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT:o cr-O 273L/ZIP:STATE:CITY: ADDRESS OWNER: NEw y' REMoDEL VAI UE:ADDITION DEMOLISH OTHER DESCRIPTION OF WORK A A''LJ ITtrTiT. coNsT. CONTRACTOR'S NAME ADDRESS CONTRACTOB # EXPIRES PHONE GENERAL: [rtraU A t\llaA I ELECTRICAL: NAME ADDBESS PHONE PLUM BI NG: PLU MBIN G NO FEE CHARGE Single Fixture Relocated Bldg (new fix. addtl) Water Service ft. Sanitary ""*", ?Orr.2se Storm Sewer ft. Backflow Device TOTAL PERMIT 2s:' MECHANICAL NN trFF aHA Aetr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cool er Vent Fan/Single duct Vent System apart from AC or htg. Mechanlcal exhaust hood and duct Permit lssuance $.10.00 TOTAL PERMIT - OFFICE USE -HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWEB BUDGET: WATER HEATER CONSTR. TYPE: HEAT SOURCE: LAND USE: # OF UNITS OCCY GHOUP: * OF STORIES: QUAD AREA: * OF BLDGS: SQ. FT.$/SQ. FT.VALUE X X X SQ. FTG MAIN SO. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY Fz-7": BUILDING PERMIT PLUMBING ? (oo DEMOLITION 5% State Su rcharg e 3",11"?5t"'" /vr+,ls MECHANICAL FENCE VALUE $ 5% State Surcharqe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCTUDING ELECTRICAL /7-O3-z-L-ao .y PHoNE: ?7o-/, ^ z ZONING: TOTAL VALUE OF PROJECT- REQUIRED INSPECTIONS V It is the responsibility of the permit holder to see that all inspectlons are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVTNG: After gravet is inmade after excavation, but ELECTRICAL & place but priorlo ptacingprior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC;AL INSpECTIONS: ln accordance ELECTRICAL & and approved. section 306 of the state specialty codeMECHANICAL: To be made a special inspector shall be empt-oyedbefore any work is covered. ATTIC DRAFT STOPS & by the Ownei/ Contractor duringcuRTAlN WALLS construction of the following w5rk. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prlor to placing be furnished io the Buildiig Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' STRUCTURAL CONCRETE: tnprior to placing concrete. FRAMING: To be made after excess of 2500 p.s.l. (306 a.1) coNcRETE SLAB: To be the roof, all framing, fire made after ail rnsrab buirdins 3i::5l:.":ff 3,'3:I?fi,x;:r" ;:Ry,.fl"'f3"t,Y5tT',rrr4 service equipment, conduit, and vents are complete andpiping, accessories and otherincir6ry equipment items are :i". H::Hlt"jru,X' jJ;[}:l: Bl?lf],?E|nol*L|,"'l]:".in place but before any tightening operations. (306concrete is placed. tNSULATtoN & vApoR a.6) BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum standards 43-g.dralnage llnes. To be made board interior walllovering isprior to covering or filllng applied.trenches. SPEC|AL GRAD|NG, ,NDERFL..R: p,umbins [lx:,S"5'fm'J3[g]"' if,il1!il"^,:ii:,5Jb'i],"t electrical, mechanlcal. To be according to plans. Chapter 29) made prior to installation of floor insulatlon, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathlng. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the City's pOST & BEAM: To be made interiol and exierlor, ls in Building Division before prior to lnstallation of floor place but before any Pqqrys are placed. (2501 U.BC. lnsulation, decklng or floor plasterlng ls applied or before STDS' 25'10,11)' sheathlng. - Sypsum board Jolnts and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR lNsuLATroN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of SIDEWALK & DRIvEwAYt X' -clecklng or floor sheathing. Required for all concrete -7 paving within street right of MASoNRy: steer rocation, Y,3;JL'??T:*"r'11:'.i'j ,o,.-bond beams grouting or work and sub-base material inverticals ln accordance with uBc 2415' ruuurudrruts wltll place' RooF sHEATHING AND iylS^H?fi,tr::ff:," NAILING: Prlor to lnstalllng erected but prior to placing ____ayoo1.r"fg concrete. *ln addition to the inspec-tions specified, the Building Official may make or require other inspections of any construction work to ensure compllance with the Building, Clty or Development Code. FINAL PLUMBING FINAL ELECTRICAL FlNAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project condition! such aslandscaping, parking lot striping, etc. must be completed beforerequestlng thls inspection. FINAL BUILDING: Requested after the final plumbing, electrical,mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereln is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. re that all required inspectlons are requested at the proper time, that project address is readable from thecard ls located at the front of the property, and the approved set of plans will remain on the site at all Signature Date I further agree to ensu street, that the permlt times durlng construc AMOUNTRECEIVED: 2-OuVALIDATION: RECEIPT # 2 1*RECEIVED BY: DATE PAID: /<62o.