HomeMy WebLinkAboutPermit Building 2019-06-24/*n
SP'rINGFIELE,
RESID ENTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
LOCATION OF PROPOSED WORK:
ASSESSOBS MAP:
LOX
#-9
c
-a
JOB NUMBER
225 Fifth Street
Sprlng(leld, Oregon 97477
TAX LOT:74
SUBDIVISION:BLOCK:
A
+
t-ia
L
STATE:ZIP:37
97/dt
OWNEB:
ADDRESS:
CITY:
ONE:
ADDITION DEMOLISH OTHER
DESCRIBE WORK:
NEW Y REMoDEL
ADDRESS PHONEEXPIRES
CONST.
CONTRACTOR #CONTRACTOR'S NAME
GENERAL:
OqrqrPLUMBING:
fi<rMECHANICAL:
()ut a<JELECTRICAL:
}un r
\IN
\l.\
D - OFFICE USE -
WATER HEATER:
LAND USE:FLOOD PLAIN
SECONDABY HEAT:
SQUARE FOOTAGE:
# OF BDRMS:
-_
OCCY GROUP:
* OF STORIES:
CONSTR, TYPE:
HEAT SOURCE:
FIANGE:
# OF UNITS:
-.-
ZONING CODE:
To request an lnspectlon, you must call 726-3769. Thmade the same worklng day, lnspecilons requested
l--l femporary Etectric
Footlng - After trenches areexcavated,
ls rs a 24 hour recordrng. Ail rnspections requested before 7:00 a.m. wiil beafter 7:00 a,m. wlll be made the followlng work day.
REQUIRED INSPECTIONS
Site lnspection - To be made [l Rough Electrlcat _ prlor toafEr excavatlon, but prior to U
"or.r.settlng forms.
I-l Understab ptumbing/ Electrical/
-
Mechanlcal - prloi to cover.Electrlcat Servlce _ Must be l-l Ftnat Mechanlcat _ When ailapproved_ to obtaln permanent
-
mechanlcal work ls complete.electrlcal pow€r.
Rough Mechanlcal - prlor tocover.Flnal Plumblng - When ailplumblng work ls complete.
Flnal Electrical - When allelectrical work ls complete.
[l ftreptace - prior to facing.- materlals and framlng lnsf
fftu-,ng - Prtor to cover.
pf rlnat Buttdins - When ail.-( requlred lnspectlons have beenapproved and bulldlng lscompleted.l-l Masonry - Steet tocailon, bond
-
Deams, grouilng.
n Foundatton - After forms are
-
erected but prlor to concreteplacement.
[-l yng:lnround ptumbrns - prior
-
to fllllng trench.
Underlloor plumblng/ Mechanlcal
- priar to lnsulaflon or decklng.
Post and Beam - prior to floorlnsulatlon or decking.
Floor lnsulalion - prior todecking.
ffif-SanitarV Sewer - prior to fining-1 trench.
f] :.T Sewer - prior ro filting
-
trench.
Waler Llne - prlor to fillingtrench.
Rough Plumblng - prlor tocover.
Wall/Celting tnsutallon - prlor tocover.
Drywall - prlor to taping.
Wood Stove - After lnstallailon
MOBILE HOME INSPE TIONS
ln"glt - After fireplace approvalano lnstallailon of unlt.
Curbcut & Approach - Afterlorms are erected but prior toplacement of concrete.
SiCewalk & Drlveway - Afterexc.avation ls complete, formsand sub-base materlal in place.
Fence - When completed.
ll Street Trees - When alt requtred
-
trees are planted.
Blocking and Set.Up - When ailotocktng is complete.
Plumbing Connectio\s - Whennome has been conn'ected towater and sewer. \
)
Electrlcal Connection _ When
p_r9cKr19, set-up, and ptumbingtnspecilons have been approvedand the home is connecied tothe servlce panel,
Flnal - After all requiredrnspecuons are approved andporc.hes, sklrilng, decks, andventlng have been lnstalled.
74
4e
\
QUAD AREA:
I OF BLDGS:
E
E
*
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total helght
LoVIype
K tnt"rio,
-
Corner
-
Panhandle
-
Cul-de-sacE
-, THE PROPOSED WORK IN THE -
HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTER?
-
lf yes, thls applicatlon must be slgned
and approved by the Historlcal
Coordinator prlor to permit issuance.
APPROVED:
ACCP.L.HSE GAR
N
S
W
E
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
Thls permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
bulldlngs, and may be suspended or revoked at any tlme
upon violation of any provisions of said ordinances'
P ev By
Recei pt Numbe
a o3
Date Paid
Plan Check Fee:
BUILDING PERMIT
ITEM SO. FT. X $/SO. FT.VALUE
3?o *t'?'P/
o/z'.*?/
(A)
\'7A4.fi€i 6C4
Total Value
Building Permit Fee
State Surcharge
Total Fee
Main
Garage
Garport
Systems Development Charge is due on all undeveloped
properties within the City limlts which are being lmproved'SYSTEMS DEVELOPMENT CHARGE (SDC)
(B) $LA-st
ADDITIONAL COMMENTS
fu.qr? 7' ^T t, ,- {V d ft
Sanitary Sewer FT' Z'fO/*^r",ffi^ffffi
No
?-s.e
34 4lra.,,.s .
FEE
FT.
/ ,Zft ,7€
oo(c)
PLUMBING PERMIT
Storm Sewer
Moblle Home
Plumblng Permlt
State Surcharge
Total Charge
ITEM
Fixtures
Residentlal Bath(s)
Wood Stove/ lnsert/ Flreplace Unit
Dryer Vent
MECHANICAL PERMIT
(D)
N0
Mechanical Permit
lssuance
State Surcharge
Total Permit
Furnace
Exhaust Hood
Vent Fan
By slgnature, I state and agree, that I have carefully examlned
the completed applicatlon and do hereby certify that all
lnformatlonhereonistrueandcorrect,andlfurthercertify
that any and all work performed shall be done in accordance
wlth the Ordinances of the City of Springf ield, and the Laws
of the State of Oregon pertaining to the work descrlbed
hereln, and that NO OCCUPANCY will be made of any
StructurewlthoutpermissionoftheBuildingSafetyDivision.
I further certify that only contractors and employees who
are ln compliance with ORS 701'055 wlll be used on thls
proiect.
I further agree to ensure that all required lnspections are
requested at the proper time, that each address ls readable
from the street, that the permlt card ls located at the front
the approved set of plans will remain
Date
of the ProPertY, and
on the sl at ring construction.me
MISCELLANEOUS PERMITS
Moblle Home
State lssuance
State Surcharge
Sldewalk
--
ft
Curbcut
-_
ft
Demolltlon
State Surcharge
Total Mlscellaneous Permits (E)
BER
VALIDATION
RECEIVED BY
AMOUNT R
DATE PAID
RECEIPT
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
s*_24_
9/o 7 7 7
CITY OF SI,RINGFIELD SYSTEMS DEVELOPMENT CIIATIGE
( c o,,,HERH?l [t#5EI*,, n,-,
NAI'IE OR COI.IPAI{Y:
LOCAT IOII:
DEVELOPI'IENI TYPE:
BUILDING SIZE:'r36'x
Neu,t E{tsnta
sizT a. Ft.
I. STORI'I DRAINAGE
it'rPERv Ious sQ.
?. SANITARY SEll'ER.CITY
NO. OF PFU'S
(See Reverse)
.)
J
x
x
x
ru4 x so.2o3 PER SQ. FT
X 542.08 PER PFU
FT
TRANSP0RTAT Iott
NO OF UNiTS X TRiP RATE X COST PER TRIP
x s424.31
x s424.3r
x s424.31
E) X .os
s
s
4. SANITARY SEl,lER-l.lli'l'lC
N0.0F PFU'S x $lS.tZS pER pFU + $tO Hlt'MC ADl.t FEE(Use PFU totalTiomG 2 Abovej
Hl.lr,rc CREDTT IF AppLICABLE (SEE REVERSE)
TOTAL.MWHC SDC
SUBT0TAL (ADD ITEMS 1,2,3 & 4)
BAS (s
s
Ste z/
L
/c5.2
Coord i nator
TOTAL SDC 7
F,KTUREUNIT-CALCULATTON IALILEt!.'rrn,L.crotNcrvt:irirrresXUnitL-tirrir':rlcttl=l'rrt"cL'nrrstrr\''r''
For rcn',odcts. cilctrlSle grrly tlrc l'JEr 'tr.;.1it1r'''rutl li'tltrrt':')
l{ul.',6[,] L.)l: L'ftl]' rli:TUn-E
FrrrunE n.pL- t..,E\i, r:r.\IUriES'" r.oLriVi.Lt-:rJT Uf 'r ts
Balhlub......'
Drinking Fourrllirl..'...
Floor Drain.. ........':""""'
lnl erceptors For Grease/Oil/Solids/Etc'.......'....'
lnt erceplors For Sand/Aut o \'\'a slr/El c.....'..........
Laundry Tub/Oothesrvashcr.'...........'..
:l
I
i
3
6,
6
t)
1
3
2
I
2
2
1
t)
ClothesvaEher - 3 Or h4ore'..-.......
llobile Hdme Park Trap (1 Per Traiter)-
fleceplor Fgr B efrigeraIorf{at e r Stat ion/Etc... ""'
fleeeptor For Commerclal Sink/D ishrt'a sher/Etc'.
Shorver, Single'Stall..
Shower. Gan9...........
Sink, Ba( Commercial
' Urinal, StillfVall....
Wash Basin/tavatory, Single.
\Yater C]osel Public lnstallation.
Water Closet. Private.........
hliscellaneous:
/Head
TOT;.L FIXTURE Ui\'lTS
CREDIT CALCUI-A.TION TAB LE:
calculate credhs separates.
Eased on assessed value. lf improvements occurred afler annexation date in table,
Yeer
Annexed
Fale per 51,00O
AssesseJ Value
Year
Annexed
Rate per 51.OO0
Assesse'.J Value
1979 or before
193C
1 981
1*2
19e3
1934
19S5
s3.21
3.13
3.08
2.S
2.82
2.63
2.51
r935
1 937
19gl
1949
r ocY'l
1931
r oo2
s 2.24
1.93
1.57
1.1 B
0.79
o.u
0.28
Gedit for Parcd or Larrc only lf Applicable
(R.t. * Irrj.* Ur.f =
lmprovement (f after annexation date) X S
--
=
(Rate X Assessed Value)
CREDIT TOTAL =$_
RUNOFF COEFFICIENTS FOR STOBM DRAINAGE
Residential...
Commercial.
.......'...... 0.4
0.9
............ 0.15
0.5
IIT4PERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT