HomeMy WebLinkAboutPermit Plumbing 1992-07-10COM M ERC!ALI I N DUSTRIAL
PERMIT APPLICATION
225 Fiflh Street, Springfield, Oregon 97477
LOCAIION OF PROPOSED WON
ASSESSOBS MAP:
SPrlINGFIELE,JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
HONE:
ZIP:STATE:
OWNE
CITY:
ADD
VALUE:DEMOLISH E
DESCRIPTION OF WOR
NEW
-
REMODEL ADDITION
lfnff:on t l /5
ADDRESS PHONENAME
EXPIRES PHONEADDRESS
t
ELECTRICAL:
ARCHITECT:
CONTRACTOR'S NAME
MECHANICAL:
CONST.
CONTRACTOR #
GENERAL:
PLUM BI NG
PLUMBING
NO.FFF CHARGE5Single Fixture ID d<1),(p
Relocated Bldg.
(new f ix. addtl)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
M EC HAN ICAL
NN FFF EHA RGF
Furnace/burner & vent
<100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE -
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
LIGHTING POWER BUDGET:
WATER HEATER:
OCCY GROUP:
Y OF STORIES:
QUAD AREA:
S OF BLDGS:
CONSTR, TYPEI
HEAT SOURCE:
SQ. FT.$i SQ. FT.VALUE
TOTAL VALUE OF PROJ
X
x
X
SO. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
BU]LDING PERMIT PLU M BI NG 5D DEMOLITION
5% State
Su rcharq e
5% State
Surcharqe -? 5D
MECHANICAL FENCE
VALUE $
5% State
Su rcharqe
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
5ATDTOTAL PERMIT FEES
EXCLUDING ELECTRICAL
C qrc ln#
FLOOD PLAIN:
It is the responsibility of the permit holder to
726-3769 (recorder), state your City designate,
for inspection. Requests received before 7
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
REQUIRED INSPECTIONS *
,see that all inspections are made at the proper time. To request an inspection, call
d job number, lob address, type of inspection requested and when you will be ready
ll be made the rki n g day, requests made after 7:00 a.m. will be made
RO LUMBIN PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
ELE
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
roof covering
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Speciatty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 PS.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Departrnent inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
located at the front of the property, and the approved set of plans will remain on the site at all
duti n
l0
lis, that the permit
7>DateSign
IVALIDATIONAMOUNT RECEIVED
RECEIPT #
DATE PAID:
RECEIVED
-,
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board ioints and
fasteners are taped and
f inished.