HomeMy WebLinkAboutPermit Building 1992-08-25COM M ERCIAL/ I N DUSTRlAL
PERMIT APPLICATION
225 FnIh Street, Springfield, Oregon 97477
SPRINGFIELO
LOCATION OF PFIOPOSED WORK t\/A+Nv :I-ru ru
ASSESSORS MAP:
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOI
PHONE
STATE:
a
4\ loz-
OWNER:
ADDRESS:
CITY:
NEW
-
REMODEL ADDITION DEMOLISH VALUE
e.t/
,v L)- N
OTHER
€A+2DESCRIPTION OF WORK:
MECHANICAL:
-
ELECTRICAL:
NAME ADDRESS PHON E
EXPI RES
?(l--3
ZNW aXlC
ARCH ITECT:
ADDRESS PHON ECONTRACTOR'S NAME
GENERAL:Au--
PLUM BI N G
CONST.
CONTRACTOR #
PLUMBING
NO.FEE CHARGE
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
N4EEHANICAL
NO FFF EHA RGF
Furnace/burner & vent
<100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
FIoor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE -
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
LIGHTING POWER BUDGET:
WATER HEATER
OCCY GROUP:
* OF STORIES:
QUAD AREA:
S OF BLDGS:
CONSTR. TYPE
HEAT SOURCE:
SQ. FT.$/sQ. FT.VALUE
TOTAL VALUE OF PROJ
X
SQ. FTG MAIN
SQ, FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
65 ,63
BUILDING PERMIT a2,ro PLUMBING DEMOLITION
5% State
Surcharge 3,'3 5% State
Su rc haroe
MECHANICAL FENCE
VALUE $
5% State
Su rch arq e
SIDEWALK
FT.
SUBTOTAL
PE RM ITS
PAVI NG CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
- 'fo - 1z-^ a
%la
ztP, 17+-7 -7
FLOOD PLAIN:
V REOUIRED INSPECTIONS V
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-ZZ69 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work daY.
S|TE |NSPECT|ON: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance
ELECTRICAL & and approved. section 306 0f the state specialty code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & oy ine Owner/ Contractor during
CURTAIN WALLS construction of the following work. A
FOOTINGS & FOUNDATIONS: ErbED, A^E. r copy of the special testing reports shall
To be made after trenches are FIREPLACEI Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected, alt steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln
prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1)
coNcRErE sLAB: ro be f[Jn]:ljiXJ'3i]'Jlfl;t|? ," srRUcruRAL wELDS:
made after all inslab building place aid all pipes,-chimneys Performed on the iob. (2722t)
service equipment, conduit, and vents are complete and
:#[3'i?X,:;:ff; ?i:i:'5i :X'.'fl'":li,]t"ii:,1'JJ;[3:t: 5l?lf],ffi]?H.?i"11gi^.in place but before any tightening operations. (306
concrete is placed. TNSULATION & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.
storm sewer, water and before any lath or gypsum Standards 43-8.
drainage lines. To be made board interior wall covering is
prior to covering or filling applied. SPECIAL GRADING,trenches.
,NDERFL..R: p'umbins [:::.1""":"m'Jfl[H3"' El;il1!iil-til',5J:'j],"1
electrical, mechanical. To be according to plans. chapter 29)
made prior to installation of
f loor insulation, decking or
f loor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
* k-Fur4
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
srDS. 25-10,11).
STRUCTURAL MASONRY: (306
a.7)
.ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and allwork performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
/-^il"r"-r--
times ring co truction
Signature Date
/-5.6 3VALIDATION LAMOUNT RECEIVED
RECEIPT #RECEIVED BY:
DATE PAID
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL'FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS FIEVIEWED BY DATE
\
:U,.
:*
I G11 ->s
Manville
U.L. Ctassiflcations
Class A
M& Slope: r-
Oeck: NocCombirst.
3 Combust.
Insutal,on: nma
Surfacrng: Cap Shet
Class I (s Cr.3! A)
Class C(taO.$Al g)
Specification No.4GNC
[:ll,ffTiifi.'#'i#Ti.,,
ForRegions2&3
Manville
U.L Cla$ltlatio.rs
Cla3s A
Mu. SloL€: 1y2-
Oeck: NorCorbrst
lnsulrtion: Fes@.
FsCore. Fsco-Foam.
UltraGard Gold
none
SurlacirE: Cap Sheet
Ma. Slope: l'
h(: Combustib'le
lnsuralion: Fasco.
FesCorE, FesoFoam,
Uhrac:rd Gokt,
none
Surtacing: Cap Sh€et
Oa3s E (!6 Crs a)
Max. Slopo:3'
O*k. Noccontust.
lNulalion: F6€o'
Fe6core, Fes@Foam.
UltraGard Gold,
none
Surlacing: Cap Stteet
ClassC(taCltsAlB)
SpeciticaUon No' 3GlC
For use over &ncrete or o$er
Non-Nailable Decks and Fescoo Board,
Fes-Coreo, Fesco-Foam@, UltraGard
Gold'l or APProved lnsulalion on
lnclines ol r/r" to 6" Per Foot
For Regions 3 onlY
Asphalt
Z.
- .. GtasKa, .'. .
-..Minerat Surlec
. '. Cap Strmt ..
End Laps groken
3'Apad (Min-l , .
Four Ply
Mineral-surface
Fiber Glass
Built-Up Roofs
Three PIY
Mineral-Surlace
Fiber Glass
Built-UP Roots
Nadaa{a Oftk
Stuathrng pager
(lt Baq!rd)
I
I
i
t
I
II
i
:
g
Eo
I
i
Eo
I
I
Ii
asphax
GlasBs€
Non-Nailabre Oel
or ApprovHl lnsulalpn
Concrele Prrod
(1, Flequtfi)
Ajphall
.01 General
Th's spsrt'catron rs lor use ryer any rype Of Structural6{k (wrllrout in$tatrfil whichq,atur|,"r,in ;;[;';#;;S^"lTilffU i:i
::i^"-r.;3: may be.recornmendij Oy tr,e oeirrilJa-I_uer tsxamptes ot srrch dedrs aro wood -O p,ndi.rnrs speciti=tim is not tor use wer rigntweigrrl ,isrlf,i.:9 3Tl9t9 ded€ aither poured or pr+casr or over frlmado ot tightweight irBUtaiing concrete.
[1{""hh}ni,#ssil3HH]ii::::ffi:l,Hi.r'::
ffi *1f,'dtr Hfl #,^!,9ffi; ;*.,-,,, *
.02 Malerlrlsper ,@ sq. lt ol toot ueaSh.athlng papar: Wbod board d€cts mly .t tals,*3i":FiF'fiilL'3['Jg'sll'.'"tt . . . . . . . LaverGtasxiprrrll.ii!,;iil';#' ""2otues
Brturn ,u Flerer to FtL tT otr,.o.3f"t I iayer
Approx. instaled n|oighr (tc): teS-ZCS
,H'3 ("31'Fin fl $[ ffi-*:' into handreabre
.Gl Appllottmdtuofmgflffi ffiffi ffi *,t1;Tffi .
Papor m.rst
yj'ts3ififf t;?t:ffi ,ff :l$,:i,yHF,#
P^1TP,I9 one Nart the taps ar 9, cenrers and down theimg_,tudinal center of eaJh lett nart rwo rows J ;;,i;;;i;os.spaced approxrm.ltely ft- apan and narls stao_g-ered on apprcxrmarery ra'. cenreis- i6;;;';,1::.
lilT^TiJ:lJi::,f.ll?J* or oecr' see i:liaiJr
ffi*#fi[i*irTdi*ffi*"fl#s€L.sthout voids. inro tf,e hot f*.,ni" Z,S.7 rirr,"i#Iasphatt-apptid just betc re rhe i.t. ri . :-r; .;il:; ;;tale ol fJ lbs, per square over th! en.ire {rlace.
8liIJ3;' llil:ffI':". lf li'3'l ra -rrprv one ravs
e' ;i Li* "*'filllilili^]iltain
z" side raps al'.r'*i-.?i,i''lj;i 31 :ffJs^:i":ts Apliv the cap
zo"s aoo*ii"'iji lJ:ijH":-rnoi asphatr (ai.: : .
"r,*r io t#p'r"-.ri.'.;,;:,1i:.T:i soedine-o-t the *p
ne dry iii"Ji[i"i!,i'!i rne2iprox rate ot 23 rbs/s.' to
"*aoi, i.J$"i",a;-";Ij1'T-fph"rt ro rh€ side'ri
'i*. ;;-k;-'f,"'1ili";ilffi ,:i iff 1*.t1,?*?J#,. w ina ./rtd ,^^riaation section o, theManville tnCustrt au c." ^ ^-!,-;i)ixilfl ffijt#i1",;r"Juilffi#,fit j:
Neilng: For sl6per orer.ter than ,
reqri'Eo. n.r-"i [o'i'ii j." ii.oil"" r " per roo' na'' i n9.i-
.ol Ganrral
Ths so*iticatio.t rs fo( use over any typ€ Ll structural
O*t *tricn is Ibt nailable and which ofloc; a suitable
surlace lo rrceiva the rool. Pou,ed a'd ptlcast coft
crete decks r€qrir9 PrimirB.
I is also tot us€ o€r F€scot, Feslco.6t. FcrcoFoamt,
Uftracard Gold- d ortE( appro/ed irEulalion tYhdt ofle6
a suitaJ€ sr,lc lo rEcei\€ thd rool. Ttris .prificalio't is
ml to De I's€o o€r lEnt-v,eEh' insr{itrg oo' ctelo d€
eith.' ili-ed r pre i1e orber 6I Tdo o' Rlht'v'€tlhl
iNla:.€ -orf,.eE.
Flashtngt Se s€ction on BUR Flashin(!. MaTville
tn.lustriaucomrprcial Roof ing Systems [l:rual'
'02 Matcrlals ns 100 sq. ft d t@l {aa
All tollowing telts arg to b€appliedfull width o,€tlapping
Ue omeOino telt by l9', giving a minimum ol 2 plis at
all mints. tnltatt ercn felt 3o thal it shall b€ limly md
uniiormty set. without voids, into lhe hol asphalt (wilhin
25"F ol tire EVT) applied just belore lhe leltal ano.ninal
unilorm rate ol 23 lbs. p€r squaE over the enti,3 g,rface'
Prior to aoolication, cut lhe cap sheet into handleable
tmoths (ii-18r) and allow to tlait$. Wlt€n miling is
req-ui.ea. crt the cap sh€t into lengths whiJt 6lom
to the nailer spacing.
Stadino at the low edge ol lhe rool area. ap9l, ono lays
ot the ap shee! being surc to rnaintain f sld€ lapc and
6' end laos over the pteceding sh€€tl Apply tho cap
shet in a full widlh moPfnng ol hot asphal (app,or
2f F above the EVT to marimiz8 bondittg ol ths cap
shet to lhe 9ly sh€€ts) at the approx. ratB ol a ber'sq lo
ttre olv sheetisl. atso spplying lsFhait b l,rc aire lap
".ea on the backside ol the cip sheel Then tlop tho cap
sheet into the hot asphalt Al ambient Emporatures
belofl 7eF, s€€ ths cold application !€cthn ol tho
Man?illa lndustrial/Comm6Icial Rooting Systems
Manual. Tlo cap slteet must ba firmly and l,librmly set
into th6 hot aspii:l witn qil edg€' will s.al6d-
Nrlllm: On inclinel of t' psr tool or nrqs. miting i3
r€quir-ed. Beler to Para 1O.1. 11 05 or lt.l.
:
I
,
i!i!:l
rl
;l
:- ncrela t.i.iff tl required
ecltt: Gl:s^\f !'r^rieror GlasPlyo ]V'.
GlasKa, :'lanEr Jl Surlaced C?r Siieel
qrtunrfl: P^16 b Para. 7.7 or 11.0.3.2
Appor. install€d weighr (hs.): l8$191
.1 gal.
2 plies
1 layer
. 'GlasPV ftEnior roquitod fo. No Ooalar Umit (NOL)
i:t Gu.rant6o-.
.Ol lppltirtlonc, to.,r?t Sta.ling at Jl. ow ed!, or tho root srea I pplyono 18"
u@, then ' tuh 5 wio€ GBPty Prornier.r Glss Ply lV'
Gtaspty
Prem,er ot
Gl.sPty tV -GtasPly Prgmier
il GlasPlY lV
-
i
I
{
I
I
i
i
I
ii
::i
li,!
1l
Asphal
,
&
B