HomeMy WebLinkAboutPermit Building 1997-01-14SPRINGFIELD
Page 1
CITY OF SPRINGFIELD SYSTEI{S DEVELOPMENT CHARGE
(COMMERCIAI, / IITDUSTRIAL)
CITY OF SPilNGFIEIT', OREGON
Name or Company: RICK STEPINA
LOCAIiON: 1,475 MOHAWK BLVD
Developement Tlpe: C Building Size
Job No.: 950003A
Lot Size Sq Ft
1. STORM DRAINAGE
Impervious Sq Ft 1-.0 X
2. SA}IITARY SEWER - CITY
Number Of PFUs 1.0 X 13
(see Page 2)
3. TR,AI{SPORTATION
Number Of Units
5. ADMINISTRATIVE FEES
Base Charge (SubEotal Above)
X 43.43 Per PFU =
X Trip Rate X Cost Per Trip
X 0.21-0 Per Sq Ft =
Per PFU + MWMC Admin Fee
18.7s0
Transportation Total
4. SAIiIITARY SEWER - MT'IMC
Number Of PFUs
0
MhMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SITBTOTAL - (Add ltema 1, 2, 3 & 4)
$o. oo
$s64. s9
$o. oo
$o. oo
$0.00
$o. oo
$s54 . s9
#28.23x 0.50
TOTAI, SDC
Reviewed By: TROY MCALLISTER Date: 04/Ta/96
$s92.82
SPRINGFIELI,
Job Number: 950003A Page 2
FIXTURE I'NIT CALCULATION TABTE
CITY OF SPilNGFIEID, ONEGON
Flxture Type
Number of
New Fixture
Uni-t
Equj-valent
Fixture
unl_ts
Bathtub
Drj-nking Fountain
Floor Drain
Interceptors For Grease/Oi1/Solids/utc
Inteceptors For Sand,/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/eLc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
S5-nk, Bar, Commercial, Residential Kitchen
Urinal, Sta11/Wa11
Wash Basin/LavaLory, Single
water Closet, Public Install-ation
Water Closet, Private
Miscellaneous
TOTAL FIXTI.IRE UNITS =13
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
aft,er annexaLion dat,e, credits are cal-culated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable: 0 X 0.00 = 0.00
fmprovement (if after annexation date): 0 x 0.00 = 0.00
CREDIT TOTAL = $0.00
(If tand value is mulLiplied by 1 then the parcel/1and credit is not accurate.)
1
2
3
6
2
6
1
3
2
z
2
1
A
4
0
0
0
0
0
0
0
0
0
tt
0
0
0
1
0
0
0
0
0
0
0
n
U
0
0
U
0
0
0
1
t2
0
0
['
COI\4 M E RCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfielct, Oregon g7477
s1'llrAIGFlELr)
?h
JOB NUMBER
INSPECTION LtN E: 726-3769
OFFICE: 726.3759
LOCATION OF PROPOSED WORI(:_5 e /tbryZ,zrfu-
ASSESSORS MAP:/7 3 ^25^7
DESCRIPTION OF WOFK
NEW _._-.. REMODEL
TAX LOT:
PHON E 7 4q-Ot't I
STATE:at ZIP:?
,' ADDrroN X DEMoLTSH orFrER VALUE: _@.*
NAME ADDRESS PHON E,
ARCH ITECT:
CO NT
G EN EFAL:
PLUMBING
MECHANICAL
S NAME ADDRESS 17*,,t
CONST.
CONTRACTOR /EXPI R S PHON E
LZ,
/1.
n
Y
I
c
OWNER
ADDRES
aUI'I Y:
_ OFFICE USE _
ZONING
FLOOD PLAIN
CONSTR. TYPE
HEAT SOURCE:
LAND USE:
/ OF UNITS
OCCY GROUP:
/ OF STOFIES
OUAD AREA:
A OF BLDGS:
LIGHTING POWEB BUDGET:
WATER HEATEB:
SQ. FT.s/so. FT.VALUE
TOTAL VALUE OF PROJECT
XSQ. FTG MAIN
SO, FTG ACCESS
SO, FTG OTHER
PLAN CH ECI( FEE RCPT"DATE BY3".a7
EUILDING PERMIT __52. Sa PLUMBI NG -r'D?DEMOLITION
5% Slate
Su rcharg e
11 1
t3 -2.{--"-r/z-s;2?OMECHANICALFENCE
VALUE S
5% Siate
Su rcharq e ;z SIDEWALK
FT
SUBTOTAL
PERM ITS
,/ /--> t ,t-// r'\ /'-/2, I r'
,*.82CU RBC UT
FT
77a.tu
PAVI NG SYSTEMS
DEVELOPMENT.
TOTAL PERMIT FEES
EXCLUDING ELECTRIC^L
E LECT RI CA L
TOTAL PERT\4IT
tl'f,[c /,-
().s- t,7 ----.tr!y:i'e'
NO.I ree CHARGE
4 Single Fixture 7z.e
Relocated Bldg
{new f ix. addtl)
Walcr Service
tt
Sanitary Sewer
ft
Storrn Sewer
fr
tsackiiow Device
Ja.*
_No.__l
-CHABGE
trFtr
Furnace/burner & vent
< 100,000 BTUs
Furnacc/burner & vcnt
Floor furrrace and vent
> 100,000 BTUs
SuspendecJwatTti-ftoor -mounted unit heater
Appliancc Vent
separat c
Stationary cv;rp.
cooler
Vcrlt Fan/Si|r0le
duct
apa rt
t9
CC
hood ancJ ciuct
AUStEXaltCA
Pcrmit lssuancc s10.00
4>/,*TOTAL PERMIT
-%eoa7l-
,7OO
HANDICAP ACCESS:
f,t'z5% Srate
Su rc harqe
.?s
_ z9r-{
VAPOR B,ARRIERS: To bc
n':-:'dc ;:':'-'l' "c
irs la:lrti(-'r) c{
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to installlng
any roof covering.
SIDEV/ALI( & DRIVEWAY:
Hequirecl for ai.i uorrurcie
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
pl ac e.
CURB AND APPROACH
APRONS: After forms are
erected but prlor to placing
concrete.
'ln addition to the inspec,
tions specified, the Buitding
Of f icial may make or require
other inspections of any
construction work to ensure
compllance with the Building,
City or Development Code.
WU'V v.YY'\a W
By signature, I state and agree, that I have carefully exarnined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and allwork performed shall be done ir') accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertainlng to'the work described herein, and that NO OCCUpANCy
will bc made of any structure witltout perrnission of ttrc Building Safety Division. I further certity that only contractors and employees
who are in conrpliance with ORS 701.055 will be uscd on this project.
I further agree tO enSUre that all required irrspections are requested at the proper ti1.1]e, that project address is readable f ronr the
front of the property, and the approved set of plans will remain on the site at all
o4LSignature Date
I
card is located at th
n
street, that t
times during
,n FINAL PLUMBTNG
/ FINAL ELECIRICAL
SITE PLAN,REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after rhe final ptumbing, etectricat,
mcchanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy h;ls been issued by the Building Division
and posted on thc prcmises.
_J-
V FINAL FI
ADDITIONAL COMMENTS
FINAL MECHANICAL
IRE DEPART
5re,3.r74
M ENT<e?
PLANS REVIEWED BY
AMOUNT RECEIVED
oNe-llZ;%-
DATE PAIDVALIDATION
RECQPT I:RECEIVED BY:
-IIEOUIRED INSPECTIONS \_/
It is'tlre'responsibility of the pernrit holcjer to sco tl)at all irrspcctions aIc n)adc at tht: 1;ropcr tirnc. To re(lucst an irrsl.)cctiorr, call
726.3769 (recorder), state your City designated job number,.iob address, type of inspection recluested and when you will be ready
for inspection. Requests received beIore 7:00 a.nr. will be made the same worklng day, requests made af ter 7:00 a.m. will be made
the follo\,ving lvork day.
SITEIINSPECTION: TO bC .,\, ROUGH PLUMBING, PAVING: Aftcr 9TAVCI iS iN
made a'f ter excavation, but ELECTRICAL & place but prior to placing
prior t.o setup of forrns. MECHANICAL: No worl( is to asphal t or concrete.
a. ,--.......-- be covercd until these
X uNDERSLA(:P-I u.!4-q11D inspections have been made sPECIAL lNSPEcrloNS: ln accordance
ELECTRICAL-&i and approved. section 306 0f the state speciatty code
MECHANICAL: To be made a special inspector shall be ernployed
before any work is covered. ATTIC DRAFT STOPS & 5y the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A
FOOTINGS & FOUNDATIONS: copy of the special testing reports sl'\all
To be nrade after trenches are FIREPLACE: Prlor to placing be furnishecj to the Building Division.
excavated and forms arc facing materials and before
erected, ail steet in ptace, but {raming inspection srRUcruRAL coNcRETE: ln
prior to placing concrete. _, FRAMING: To be made atter excess of 2500 PS.i. (306 a.1)
CoNCRETE SLAB: To be thc roof' all f raming' f ire
made af ter a, insrab brrirdins Bl::x i:.":ff :ffi:[?,i';l:r. BI,3,."JJf3,| ,Yu=i3o]',rrr, ,,
service equlpment, conduit, and vents are complete andpiping, accessories and other
ancirarv equipment items are :x".';::1"",]i""ii:,'J'JJ;[3:?: Bl?,:rT?;],?T[B3,tl]:".in place but before any tighte-ning operations. (306concrete is placed. INSULATTON & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barrlers are in place but FIREPROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43.8.dralnage llnes. To be made board lnterlor wall covering ispribr to covering or filling applied.trenches. SPEC|AL GRAD|NG,
,NDERFL..R: p'umbins -_- [i::,1'"1rm:3]"wALL: ix:i;Tii[#],",5Jb'iT,"-
electrical, mechanical. To be according to plat'ls. Chapter 29)
made prior to installation of
ftoor insulation, cJecking or - r'I- LATH AND/OR GYPSUM GLU'LAM BEAMS: lrlspcction
f loor sheathing. BOARD: To be made af ter all Certi{icate by arr approvecl
lathing and gypsum board, a0ency, furnishecl to the City's
POST & BEAM: To bc made interior and exterlor, is in Building Division be(ore
prior lo instaltation of floor place but before any beams are placed' (2501 U B.C.
insulatlon, decking or floor plastering ls applied or before STDS' 25'10'11)'
sheathlng. - Sypsum board loints and
fasteners are taped and SIRUCTURAL MASONRY: (306
FLooR INSULATToN & f inished a'7\