Loading...
HomeMy WebLinkAboutPermit Building 1997-01-14SPRINGFIELD Page 1 CITY OF SPRINGFIELD SYSTEI{S DEVELOPMENT CHARGE (COMMERCIAI, / IITDUSTRIAL) CITY OF SPilNGFIEIT', OREGON Name or Company: RICK STEPINA LOCAIiON: 1,475 MOHAWK BLVD Developement Tlpe: C Building Size Job No.: 950003A Lot Size Sq Ft 1. STORM DRAINAGE Impervious Sq Ft 1-.0 X 2. SA}IITARY SEWER - CITY Number Of PFUs 1.0 X 13 (see Page 2) 3. TR,AI{SPORTATION Number Of Units 5. ADMINISTRATIVE FEES Base Charge (SubEotal Above) X 43.43 Per PFU = X Trip Rate X Cost Per Trip X 0.21-0 Per Sq Ft = Per PFU + MWMC Admin Fee 18.7s0 Transportation Total 4. SAIiIITARY SEWER - MT'IMC Number Of PFUs 0 MhMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SITBTOTAL - (Add ltema 1, 2, 3 & 4) $o. oo $s64. s9 $o. oo $o. oo $0.00 $o. oo $s54 . s9 #28.23x 0.50 TOTAI, SDC Reviewed By: TROY MCALLISTER Date: 04/Ta/96 $s92.82 SPRINGFIELI, Job Number: 950003A Page 2 FIXTURE I'NIT CALCULATION TABTE CITY OF SPilNGFIEID, ONEGON Flxture Type Number of New Fixture Uni-t Equj-valent Fixture unl_ts Bathtub Drj-nking Fountain Floor Drain Interceptors For Grease/Oi1/Solids/utc Inteceptors For Sand,/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/eLc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang S5-nk, Bar, Commercial, Residential Kitchen Urinal, Sta11/Wa11 Wash Basin/LavaLory, Single water Closet, Public Install-ation Water Closet, Private Miscellaneous TOTAL FIXTI.IRE UNITS =13 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured aft,er annexaLion dat,e, credits are cal-culated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: 0 X 0.00 = 0.00 fmprovement (if after annexation date): 0 x 0.00 = 0.00 CREDIT TOTAL = $0.00 (If tand value is mulLiplied by 1 then the parcel/1and credit is not accurate.) 1 2 3 6 2 6 1 3 2 z 2 1 A 4 0 0 0 0 0 0 0 0 0 tt 0 0 0 1 0 0 0 0 0 0 0 n U 0 0 U 0 0 0 1 t2 0 0 [' COI\4 M E RCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfielct, Oregon g7477 s1'llrAIGFlELr) ?h JOB NUMBER INSPECTION LtN E: 726-3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORI(:_5 e /tbryZ,zrfu- ASSESSORS MAP:/7 3 ^25^7 DESCRIPTION OF WOFK NEW _._-.. REMODEL TAX LOT: PHON E 7 4q-Ot't I STATE:at ZIP:? ,' ADDrroN X DEMoLTSH orFrER VALUE: _@.* NAME ADDRESS PHON E, ARCH ITECT: CO NT G EN EFAL: PLUMBING MECHANICAL S NAME ADDRESS 17*,,t CONST. CONTRACTOR /EXPI R S PHON E LZ, /1. n Y I c OWNER ADDRES aUI'I Y: _ OFFICE USE _ ZONING FLOOD PLAIN CONSTR. TYPE HEAT SOURCE: LAND USE: / OF UNITS OCCY GROUP: / OF STOFIES OUAD AREA: A OF BLDGS: LIGHTING POWEB BUDGET: WATER HEATEB: SQ. FT.s/so. FT.VALUE TOTAL VALUE OF PROJECT XSQ. FTG MAIN SO, FTG ACCESS SO, FTG OTHER PLAN CH ECI( FEE RCPT"DATE BY3".a7 EUILDING PERMIT __52. Sa PLUMBI NG -r'D?DEMOLITION 5% Slate Su rcharg e 11 1 t3 -2.{--"-r/z-s;2?OMECHANICALFENCE VALUE S 5% Siate Su rcharq e ;z SIDEWALK FT SUBTOTAL PERM ITS ,/ /--> t ,t-// r'\ /'-/2, I r' ,*.82CU RBC UT FT 77a.tu PAVI NG SYSTEMS DEVELOPMENT. TOTAL PERMIT FEES EXCLUDING ELECTRIC^L E LECT RI CA L TOTAL PERT\4IT tl'f,[c /,- ().s- t,7 ----.tr!y:i'e' NO.I ree CHARGE 4 Single Fixture 7z.e Relocated Bldg {new f ix. addtl) Walcr Service tt Sanitary Sewer ft Storrn Sewer fr tsackiiow Device Ja.* _No.__l -CHABGE trFtr Furnace/burner & vent < 100,000 BTUs Furnacc/burner & vcnt Floor furrrace and vent > 100,000 BTUs SuspendecJwatTti-ftoor -mounted unit heater Appliancc Vent separat c Stationary cv;rp. cooler Vcrlt Fan/Si|r0le duct apa rt t9 CC hood ancJ ciuct AUStEXaltCA Pcrmit lssuancc s10.00 4>/,*TOTAL PERMIT -%eoa7l- ,7OO HANDICAP ACCESS: f,t'z5% Srate Su rc harqe .?s _ z9r-{ VAPOR B,ARRIERS: To bc n':-:'dc ;:':'-'l' "c irs la:lrti(-'r) c{ decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installlng any roof covering. SIDEV/ALI( & DRIVEWAY: Hequirecl for ai.i uorrurcie paving within street right of way, to be made after all excavating complete and form work and sub-base material in pl ac e. CURB AND APPROACH APRONS: After forms are erected but prlor to placing concrete. 'ln addition to the inspec, tions specified, the Buitding Of f icial may make or require other inspections of any construction work to ensure compllance with the Building, City or Development Code. WU'V v.YY'\a W By signature, I state and agree, that I have carefully exarnined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and allwork performed shall be done ir') accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to'the work described herein, and that NO OCCUpANCy will bc made of any structure witltout perrnission of ttrc Building Safety Division. I further certity that only contractors and employees who are in conrpliance with ORS 701.055 will be uscd on this project. I further agree tO enSUre that all required irrspections are requested at the proper ti1.1]e, that project address is readable f ronr the front of the property, and the approved set of plans will remain on the site at all o4LSignature Date I card is located at th n street, that t times during ,n FINAL PLUMBTNG / FINAL ELECIRICAL SITE PLAN,REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after rhe final ptumbing, etectricat, mcchanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy h;ls been issued by the Building Division and posted on thc prcmises. _J- V FINAL FI ADDITIONAL COMMENTS FINAL MECHANICAL IRE DEPART 5re,3.r74 M ENT<e? PLANS REVIEWED BY AMOUNT RECEIVED oNe-llZ;%- DATE PAIDVALIDATION RECQPT I:RECEIVED BY: -IIEOUIRED INSPECTIONS \_/ It is'tlre'responsibility of the pernrit holcjer to sco tl)at all irrspcctions aIc n)adc at tht: 1;ropcr tirnc. To re(lucst an irrsl.)cctiorr, call 726.3769 (recorder), state your City designated job number,.iob address, type of inspection recluested and when you will be ready for inspection. Requests received beIore 7:00 a.nr. will be made the same worklng day, requests made af ter 7:00 a.m. will be made the follo\,ving lvork day. SITEIINSPECTION: TO bC .,\, ROUGH PLUMBING, PAVING: Aftcr 9TAVCI iS iN made a'f ter excavation, but ELECTRICAL & place but prior to placing prior t.o setup of forrns. MECHANICAL: No worl( is to asphal t or concrete. a. ,--.......-- be covercd until these X uNDERSLA(:P-I u.!4-q11D inspections have been made sPECIAL lNSPEcrloNS: ln accordance ELECTRICAL-&i and approved. section 306 0f the state speciatty code MECHANICAL: To be made a special inspector shall be ernployed before any work is covered. ATTIC DRAFT STOPS & 5y the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTINGS & FOUNDATIONS: copy of the special testing reports sl'\all To be nrade after trenches are FIREPLACE: Prlor to placing be furnishecj to the Building Division. excavated and forms arc facing materials and before erected, ail steet in ptace, but {raming inspection srRUcruRAL coNcRETE: ln prior to placing concrete. _, FRAMING: To be made atter excess of 2500 PS.i. (306 a.1) CoNCRETE SLAB: To be thc roof' all f raming' f ire made af ter a, insrab brrirdins Bl::x i:.":ff :ffi:[?,i';l:r. BI,3,."JJf3,| ,Yu=i3o]',rrr, ,, service equlpment, conduit, and vents are complete andpiping, accessories and other ancirarv equipment items are :x".';::1"",]i""ii:,'J'JJ;[3:?: Bl?,:rT?;],?T[B3,tl]:".in place but before any tighte-ning operations. (306concrete is placed. INSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barrlers are in place but FIREPROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43.8.dralnage llnes. To be made board lnterlor wall covering ispribr to covering or filling applied.trenches. SPEC|AL GRAD|NG, ,NDERFL..R: p'umbins -_- [i::,1'"1rm:3]"wALL: ix:i;Tii[#],",5Jb'iT,"- electrical, mechanical. To be according to plat'ls. Chapter 29) made prior to installation of ftoor insulation, cJecking or - r'I- LATH AND/OR GYPSUM GLU'LAM BEAMS: lrlspcction f loor sheathing. BOARD: To be made af ter all Certi{icate by arr approvecl lathing and gypsum board, a0ency, furnishecl to the City's POST & BEAM: To bc made interior and exterlor, is in Building Division be(ore prior lo instaltation of floor place but before any beams are placed' (2501 U B.C. insulatlon, decking or floor plastering ls applied or before STDS' 25'10'11)' sheathlng. - Sypsum board loints and fasteners are taped and SIRUCTURAL MASONRY: (306 FLooR INSULATToN & f inished a'7\