Loading...
HomeMy WebLinkAboutPermit Building 1999-09-27COM M ERCIAL/ I N DUSTRlAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPRI'{GFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 3 lcLOCATION OF PROPOSED WORK: ASSESSORS MAP:TAX LOT PHONE:{-l s ZIP: D c>LSTATE: .3s-e-8, r.\nrs Vr z-z* fuOWNER: ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH OTHER VALUE: DESCRIPTION OF WORK: trtrr\uAtrilr-al. NAME ADDRESS PHONE ADDRESS EXPIRES PHONE (" ELECTRICAL: CONTRACTOR'S N ARCHITECI PLUMBING: GENERAL: CONST. CONTRACTOR # PLU MBING NO FEE CHARGE I Single Flxture /o .f/rd Relocated Bldg. (new fix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft. Backtlow Device TOTAL PERMIT / 5?o MECHANICAL NN trtrF NHA tr^tr Furnace/burner & vent <100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. c.ooler Vent Fan/Single duct Vent from System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE - LAND USE: * OF UNITS: HANDICAP ACCESS: LIGHTING POWER BUDGET: ZONING: OCCY GROUP: '+ OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE; HEAT SOURCE:WATER HEATER: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF,PROJ x x X SQ. FTG MAIN SQ, FTG ACCESS SO. FTG OTHER DATEPLAN CHECK FEE BYRCPT# /4,tu BUILDING PERMIT PLUMBING /;,@ DEMOLITION 7% state Surcharqe #;?',*f" /?r*4 f /,ro MECHANICAL FENCE VALUE $ - SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PEBMIT FEES EXCLUDING ELECTRICAL Y 0 FLOOD PLAIN: 7%stare Surcharoe REOUIRED INSPECTIONS It ls the responsiblllty of the permit holder to see that all lnspectlons are made at the proper time. To request an inspection, call 126.g769 (recorder), State your City designated job number, job address, type of inspection requested and when you will be ready for inspeclon. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work daY. SITE |NSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. Il"=;j/:X."lli Norryork is to asphalt or concrete' UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELEGTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work ls covered. ATTIC DRAFT STOPS & ny ine Owner/ Contractor during CURTAIN WALLS construction of the following work. A FoOTtNGs & FouNDATIoNS: E,DEDT AnE. r copy of the special lesting reports shall To be made after trenches are FIREPLACE: Prlor to placing be furnished to the Building Division. excavated and forms are faclng materlals and before erected, all steel ln place, but framing inspectlon' srRUcruRAL CoNCRETE: ln prlor to placing concrete. FRAMING: To b€ mado aft€r excess of 2500 PS.l' (306 a'1) coNcRErE sLAB, ro be H:J,ffilji|j,]'iil'Jlfl;t[,? ,n srRUsruRAL wELDS: made after all lnslab bulldlng ptace aid all ptpes,ihimneys Performed on the iob. (2722 l) servlce equlpment, conduit, ind vents are'cbmplete ancL !1,'J'?,?;""".t;:{L? ?i:l":'::J *?'fl::["",lHI':,X'XJ;139:1Y 5l|,lfI?E]*ol[,?P*lST".ln place but before any tlghtenlng operatlons, (3Oo concrete ls placed. INSULATTON & VApOR a,6) BARRIER: To be made after all UNDERGROUND: Plumblng, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barriers are ln place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. dralnage llnes. To be made board interior wall covering is prlor to covering or filling applied. S'ECIAL GRAD'NG,trenches. ,NDERFL..R: p,umbins I*:,$'"="'fl*'J3l:Hl"' ilifIt'iil-til:,5Jb'i|"t electrlcal, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulatlon, decklng or LATH AND/oR GYPSUM GLU'LAM BEAMS: lnspection floor sheathi;S: -- BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the city's poST & BEAM: To be made lnterior and exierlor, ls in - Building Division before prlor to lnstallation of floor place but before any beams are placed' (2501 u'Bc' lnsulation, decklng or floor irlastering ls applied or before STDS' 25-10J1)' sheathlng. gypsum board ioints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR INSULATToN & finlshed' a'7\ VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams groutlng or vertlcals ln accordance with UBC 2415. r ROOF SHEATHING AND NAILING: Prlor to lnstalllng any roof coverlng. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specified, the Building Official may make or requlre other inspections of any construction work to ensure compliance with the Building, Clty or Development Code. By signature, I state and agree, that I have carefully examlned the completed appllcation and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Sprlngfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compllance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper tlme, that project address is readable from the street, that the permlt card ls located at the front of the property, and the approved set of plans will remaln on the site at all Signat Date times durlng on ,/z -*VALIDATION:AMOUNT RECEIVED: 2RECEIPT *:RECEIVED BY: DATE PAID: -x FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspectlon. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this lnspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE