Loading...
HomeMy WebLinkAboutBuilding Plumbing 1996-09-20COMM ERCIAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fifln Street, Springfield, Oregon 97477 SPFlINGFIELO t21JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:Wohnil lt Bhlr:[ ASSESSORS MAP t1c ?533,TAX LOT:ffi qoa PHONE STATE:zte, ? 7477 OWNER: ADDRESS: CITY: ADDITION OTHER VALUE:DEMOLISH DESCRIPTION OF WORK: NEW--- REMODEL NAME ADDRESS PHONE ADD RESS EXPIRES PHONE a 7 ELECTRICAL: ARCHITECI CONTRACTOR'S NAME MECHANICAL: CONST. CONTRACTOR a G EN ERA L: PLUM BI NG NO.FEE CHARG E Single Fixture Relocated Bl new fix. addtl ft.{0. co Sanitary Sewer ft 57,2.oo <q ).1nStorm Sewer ft Backf low Device (k t5.tn ,-7 5.L,tA u TOTAL PERMIT L( Fur nace/burner & vent < 100,000 BTUs rnace/burner & vent O BTU Fu >1 Floor furnace and vent oorWAor mounted unit heater U se parate ppliance tat nary evap. cooler ngle duct Ven or ht apa rt f rom nt Mec exhauanca hood and duct Permit lssuance $10.00 TOTAL PERMIT HANDICAP ACCESS: - FLOOD PLAIN: ZONING: LIGHTING POWER BUDGEI WATER HEATER: _ OFFICE USE _ OCCY GROUP: * OF STORIES: QUAD AREA ,d OF BLDGS CONSTR. TYPE HEAT SOURCE: LAND USE: , OF UNITS SO. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY 5q lc BUILDING PERMIT PLUMBI NG 5 2.o o DEMOLITION 5% State Surch 5% State Su rch I /e .oaMECHANICALFENCE VALUE o 5% State Su SIDEWALK FT. SUBTOTAL PE RM ITSPAVINGCURBCUT FT. SYSTEMS DEVELOPM ENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL \___-./ - Nl r'l trtrtr CHAFIGF REOUTRED INSPECTIONS It is the responsibitity of the permit holder to see that all inspections are made at the proper time. To request an inspection' call 726.376g(recorder), state your city designated iob number, job address, type of inspection requested and when you will be ready for inspection. Requests ieceived bef ore 7:00 a.m. will be made the same working day, requests made after 7:00 a'm' will be made the following work daY. S|TE TNSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setu;;;;;!.--' f"=:ltg."t"ti,,*,?XTn'" t' asphart or concrete' UNDERSLAB PLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELEcTRtcAL & and approved. section 306 of the state specialty code MECHANICAL: To be made ^--rA ^^AFT a special inspector shall be employed before any work is covered. ATTIC DRAFT sroPs & by the owner/ contractor during CURTAIN WALLS construction of the following work. A ]?j,i"%t:#t?J,llT:r'"'" tacins materiars and before erected, a1 steer in praca, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete' FRAMING: To be made after .eicess of 2500 P'S'l' (306 a'1) the roof, all framing, fire coNcR.ErE SLAB: ro be brockins and braciis are in Eln:,flyflnt il5tioT'frrr, ,, made after all inslab building place and all pi pes, chimneys service equipment, conduit, and vents are complete and piping, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING: ancillary equipment items are and mechanlcit are'dpproveOl During all bolt installation and in place but before any tightening operations. (306 concrete is placed. INSULATION & VAPOR a'6) BARRIER: To be made after all UNDERGROuND: Plumbing, insulation and required vapor SPRAYED oN electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC. storm sewer' water and before any lath or gypsum standards 43-B' drainage lines. To be made board interior wall covering is prior to covering or filling applied. SPECIAL GRADING, trenches. EXCAVATION AND FILLING: ,NDERFL..R: prumbins [:?:,].t;'f;X*i3[Httt' *x;g,:il'iwork' (306 a'11 & electrical, mechanical. To be according to plans' made prior to installation of vnc,,i^ GLU.LAM BEAMS: lnspection iltil s::,x;i';;;;';n "' bt'jl3'.r?3J,.fJIjl'["" certiricate bv an approved rathins ano gypsum board, et?,Hl'rtH.,li3l'"",f JSrl?: "'t''' ;:,;I,1,:5[f;,1;"0;,'il3:? I:""':i{i:%}:':",ii'" ': .- be'ms zre praced (2501 u Bc insutation, decking or f toor [tistering i" ippriLo or before STDS' 25-1011)' sheathing. ' Sypsum board joints and fasteners are tiped and STRUCTURAL MASONRY: (306 FLooR INSULATIoN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating comPlete and form work and sub'base material in place. CURB AND APPROACH APRONS: After forms are erected but Prior to Placing concrete. PLANS REVIEWED BY 'ln addition to the insPec' tions specified, the Building Official may make or require other inspections of anY construction work to ensure compliance with the Building, City or DeveloPment Code. SITEPLANREVIEwBoARD:Mustberequested2daysinadvance oi in" J"i" you wish inspection. All project conditions such as i."O"""pirg1 parking lot stri ping, etc' must be completed before requesting this insPection. FINAL BUILDlNG: Requested after the final plumbing, electrical, rnl"ntniC.L and Fire Department inspections are made and approreO. No occupancy of the premises can be made until a clltiiicate of occupancy has been issued by the Building Division and posted on the Premises. ADDITIONAL COMMENTS: DATE By signature, r state and agree, that r have carefuily examined the compreted apprication and do hereby certify that ail information herein is true and correct, and rfurther certif; th;t any and ail work performed shall be done in accordance with the ordinances of the city of springfield, and the Laws of the state of oregon pertainlng to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Builiing safety Di-vision. I further certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this project' I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all ?-to- Si gnatu o times during const ru ton s7. lc VALI DATION: ?- RECEIVED BY: DATE PAIDAMOUNT RECEIVED: RECEIPT #