HomeMy WebLinkAboutPermit Building 1994-06-02CO M M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fillh Street, Springfield, Oregon 97477
SPFINGFIELO JoB NUMBER 7728?4
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:/2.a ?-2)*=>TAX LOT 1@7
/79, fcJz:2
PHONE
ZIP:
c
STATE:
ADDRESS:
CITY:Ztt4 €/YE'T
OWNER:
NEW
-
REMODEL ADDITION DEMOLISH OTHER 22aa- u>VALUE
DESCRIPTION OF WORK:
PLUMBING:
EI EffOIA I .
ADDRESS PHONENAME
R#EXPI RES PHONEADDRESSCONTRAGTOR'S NAME
ARCHITECT:
MECHANICAL:
CONST,
CONT
GENERAL:
NO.FFF CHARGE
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
MECHANICAL
NO FFtr CHAFIGF
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
>100.000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Perrnit lssuance $10.00
TOTAL PERMIT
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
FLOOD PLAIN:
LIGHTING POWER BUDGET:
WATER HEATER:
_ OFFICE USE)/
OCCY GROUP:
,r OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
VALUESQ. FT,$/so. FT.
TOTAL VALUE OF PROJ
X
X
x
SQ. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
DATEPLAN CHECK FEE BYRCPT#
86.7;
BUILDING PERMIT 8o_:;o PLUMBI NG DEMOLITION
% State OJcn-v2t
5% State
Su rc harqe
I
MECHANICAL FENCE
VALUE $
-
% State
Su
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES.
EXCLUDING ELECTRICAL
REQUTRED INSPECTTONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & I place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLABPLUMBtNG,inspectlonshavebeenmadeSPEclALlNSPEcTloNS:lnaccordance
ELECTRICAL & and approved. Section 306 of the State Specialty Code
MECHANICAL: To be made a speclal inspector shall be employed
before any work is coverecl. ATTIC DRAFT STOPS & by the Owner/ Contractor durin!, CURTAIN WALLS construction of the following w6rk. A
FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished io the Buildi-ng Division.
excavated and forms are facing materials and before
erected, ail steel in place, but framing lnspection' srRUcruRAL CoNCRETE: lnprior to placing concrete. FRAMINGT To be made after excess of 2500 P.S.l. (306 a.1)
coNcRETE SLAB: To be the roof, all framing, fire
made arter an insrab buirdins 3i::5 ::.':fl 3ffi:::?ri';l:r" FII8,H"'X3"t,Y5tT',rrr, ,service equipment, conduit, and vents are'complete anclpiping, accessories and otherinciriry equipment items are :X?';:*"",lHi':,X,f#[3:t: Bl?,If],ffi]noT,l",?i"THt"oin place but before any tighte-nlng operations. (306concrete is placed. INSULAT|oN & vApoR a.6)
BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are ln plabe but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-g.drainage llnes. To be made board Interlor wall covering isprior to covering or filling applied.irenches. 4+?., SPECIAL GRADING,
,NDERFL..R: prumbins Yltf;S'"?fmX3[Hl"' Ef,iUt'lil'-tii:,5Jb:],"t
electrical, mechanical. To be accordlng to plans. chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection
floor sheathing. - BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency, furnished to,the City's
poST & BEAM: To be made interloir and 6xierlor, ls ln ' Building Divislon before
prior to installatlon of floor place but before any beams are placed' (2501 U.BC.
insulation, decking or floor plasterlng ls applied or before STDS' 25'10,11)'
sheathing. - Sypsum board joints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR TNSULATToN & finished. a.7)
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
on to th
ions specified, the
v
x
t
lnspec-
Bullding
Official may make or require
other inspections of any
constructlon work to ensure
compliance with the Bullding,
Clty or Development Code.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all informailonhereln is true and correct, and I further certify that any and all work performed shall be done ln accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUpANCywill be made of any structure withgut permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this proJect.
I furtheragree to ensure that all required inspections are requested at the
property, and the approved set of plans will remain on the site at all
Signature Date
proper time, that project address is readable f rom thestreet, that the permit card is located at the front of the
times during c on.
VALIDATION ,25.-,o
RECEIVED BY:
AMOUNT RECEIVED:
RECEIPT T:
F]NAL PLUMBING
FINAL ELECTR]CAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days ln advanceof the date you wish inspection. All project conditioni such aslandscaping, parking lot stri ping, etc. must be completed beforerequestlng thls inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,mechanlcal and Fire Department inspections are made and
approved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divislonand posted on the premises.
ADDITIONAL COMMENTS:
PLANS BEVIEWED BY DATE
DATE PAID: 4'z '?<-r
Manville
It I . Cln.re.ificntiorrs
Class A
Max. Slope: 1"
Deck: Non-Combust. &
Combust.
lnsulation: none
Surfacing: Cap Sheet
Class B (see Class A)
ClassG(seeClassA&B)
Tlrree Ply
Mineral-Surface
Fiber Glass
Built-Up Roofs
Nailable Deck
Sheathing Paper
(ll Flequired)
GlasBase
or Venlsulation
Asphalt
S6recification rrlo. 3GNC
For use over Plywood or other
Nailable Decks on lnclines ol
Yc" lo 6" per Foot
For Region 3 only
o Nails
9"
2"t ' GlasKap
. ' Mineral Surlace .' Cap Sheet . . .
End Laps Broken
3'Apart (Min.) ,
.
oo)(uc
Eo
I
18"-:l
a Asphalt
(o(o
@ - GlasPly
Premier or
GlasPly lV
"{} ! (;.,}trarnl
This specification is for use over any type of structural
deck (without insulation) which can recelve and
adequately retain nails or other types of mechanical
fasteners as may be recommended by the deck manu-
facturer. Examples of such decks are wood and
plywood. This specification is not for use over light-
weight insulating concrete decks either poured or pre-
cast or over fill made ol lightweight insulating concrete.
Nole: All general instructions contained in thecurrent Manville
lndustrial/Commercial Roofing Systems Manual shall be con-
sidered part of this specification.
Flashings: See section on BUR Flashings, Manville
lndustrial/Commercial Roofing Systems Manual.
"n? ltlrlorirrlelinl /()O sq ft. of rlof area
Sheathing Paper: Wood board decks only .1 layer
Felts: GlasBase'" or Ventsulation@ Felt . 1 layer
GlasPly@ Premier or GlasPly@ lV* . . . 1 layer
GlasKap@ MineralSurfaced Cap Sheet ..... 1 layer
Bitumen: Befer to Para.7.7 or 11.0.3.2
Approx. installed weight (lbs.): 145 1o220
.Oll 11.{rrr!ier:?inn f.f Qr:r! i 1161
Over wood board decks one ply of sheathing paper must
be used under the base felt next to the deck.
Using GlasBase, start with a 24" width. Following felts to
be applied full width, lapping each felt 2" over the pre-
ceding one. Nail the laps at 9" centers and down the
longitudinal center of each felt nail two rows of nails with
rows spaced approximately 11" apart and nails stag-
gered on approximately 18" centers. Use nails or fas'
teners appropriate to the type of deck.
Starting at the low edge of the roof area apply one 18"
wide, then a full 36" wide GlasPly Premier or Glas Ply lV;
overlapping the preceding felt by 2". All following felts
are to be applied full width with the same 2" overlap.
lnstall each felt so that it shall be firmly and uniformly
set, without voids, into the hot asphalt (within 25"F of
the EVT) applied just before the felt at a nominal uniform
rate of 23 lbs. per square over the entire surface.
Prior to application, cut the cap sheet into handleable
lengths (12'-18') and allow to flatten. Starting at the low
edge of the roof area, apply one layer of the cap sheet,
being sure to maintain 2" side laps and 6" end laps over
the preceding sheets. Apply the cap sheet in a fullwidth
mopping of hot asphalt (approx. 20" F above the EW to
maximize bonding) at the approx. rate of 23 lbs/sq to the
ply sheet(s), also applying asphalt to the side lap area on
the backside of the cap sheet. Then flop the cap sheet
into the hot asphalt. At ambient temperatures below
70oF, see the cold application section of the Manville
lndustrial/Commercial Roofing Systems Manual. The
cap sheet must be firmly and uniformly set into the hot
asphalt with all edges well sealed.
Nailing: For slopes greater than 1" per foot: nailing is
required. Refer to Para. 11.0.6.
'GlasPly Premier required lor No Dollar Limit (NDL) Guarantees.
BU 560Sec 11 Pg 18 11 d9
(o
(t)