Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-06-071ar+.*z COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fif|n Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK .1 ASSESSORS MAP -4 .? SPRINGFIELO ?fr, JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOI: '<L/ PHON E: Fazrye ztP: ? > reaSTATE:CITY: ADDRESS: OWNER: NEW -- REMODEL ,,r ADD|TION DEMOLTSH OTHER VALUE CDESCRIPTION OF WORK: GENEFIAL: ELECTRICAL: NAME ADDRESS PHONE ADD RESS EXPI RES PHON E ARCH ITECT: CONTRACTOR'S NAME M EC HA N ICAL: PLUMEING: CONST. CONTRACTOR # PLUMBING NO FEE CHARG E Relocated Bld (new fix. addtl s ) Water Service ft Sanitary Sewer tt Storm Sewer ft Backflow Device TOTAL PERMIT MECHANICAL NO trtrtr I EHA FIG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent se parate Stat ionary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct/44/22*' Permit lssuance $10.00 TOTAL PEBMIT /rr _ OFFICE USE _ ZONING HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER OCCY GROUP # OF STORIES QUAD AREA: I OF BLDGS: LAND USE: , OF UNITS SQ. FT.$/SQ. FT,VALUE TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ, FTG OTHER PLAN CHECK FEE RCPT#DATE BY Q6:.>e BUILDING PERMIT PLUM BI NG DEMOLITION 5% State Su rc harg e 5% State Su rc h arqe MECHA ./z--'/)-'>'FENCE VALUE $ 570 State Surcharoe fr ,f,SIDEWALK FT. SUBTOTAL PERM ITSPAVINGCU RBCUT FT. SYSTEMS D EVELOPMENT TOTAL PEBMIT FEES EXCLUDING ELECTRICAL for ?2. /Bo-zs Single Fixt ure CONSTB, TYPE: HEAT SOURCE: REQUIRED INSPECTIONS It is the responslbility of the permit holder to see that all inspectlons are made at the proper time. To request an inspection, call726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be readyfor inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be madethe following work day. slrE INSPECTION: To be X !g_u-q! llgMBtNG, pAVtNG: After sraver is in [,il,.",3t1"J,,"X?,?Jid'; o'' ' ffir.on work is to ::XAR'J,tJ:'"'.',:,p-i""lng UNDERSLAB pLUMBING, inspections have been made SpEC1AL INSpECTIONS: tn accordance before any work ls covered. ATTIC DRAFT STOPS & by the owner/ Contractor duringCURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: E,hF6, copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished io the Building Division. excavated and forms are facing materials and before , erected, all steel in place, but f raming inspection. STRUCTURAL CONCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 ps.t. (306;.1) coNcRETE SLABr To be the roof' all framing' fire made arter a, insrab buirdins 3l::5::.":ff il'i:I?;,Hj:r" EIX3,T"'f3"t,Yutf3ol',rrr, ,,service equipment, conduit, and vents are complete andpiping, accessories and other incirary equipment items are n:';::lj,li""ji:fl'JJ;[?::: Bl?lrTi:]?T*,?l,hi}i..in place but before any tightening operailons. (306concrete is placed. lNsuLATloN & vApoR a.6) BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are ln place but FIREPROOFING: U.B.C.storm sewer, water and before any lath or gypsum standards 43-8.drainage lines. To be made board interior walllovering lsprior to covering or f illlng applied.trenches. SPEC|AL GRADING, ,NDERFL..R: p'umbins [:::,s';'fm'J3[Hf"' il:i;xxi]-:1i",5;::],"1 electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. - BOARD: To be made after all Certif icate by an approved lathing and gypsum board, agency, furnished to the City's pOST & BEAM: To be made interior and exieriol is in Building Division be{ore prior to instailation of ftoor place but before any :3fl:":t?J]aced. (2501 U.BC. insulatiOn, decking or floor plastering is applied or before rru>' zc'ru,ll)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installlng any roof covering. SIOEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. 'ln addition to the inspec- tions specified, the Building Off icial may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify thit all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Buildlng Safety Divlsion. I further certlfy that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agrde to ensure that all required inspections are requested at the proper time, that project ad DateSignatureI street, that the pe rmlt card ls located at the front of the times durlng construc y, and the approved set of plans wi ldress is readable from the ll remain on the sitejat all -//-v 75 VALIDATION ?,6 RECEIVED BY: DATE PAID:AMOUNT RECEIVED: RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All proiect conditions such as landscaping, parking lot stri ping, etc. must be completed before requestlng this inspection. FINAL BUILDING: Requested af ter the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certiflcate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS PLANS REVIEWED BY DATE n3v X (atnwttrt l /.tl, (tE auz3lb lUr zrvfiG KD Euoeuo , etu Qt(ot-q4tqrzt ET S/,,1 /o,-l,nt tZoowt frr,a,,t lQnz- tuohaul< S Pzr,ie , ot Szllz Ot,ltvtt* 15xrro... rS*n6u -(fir.. t>8t or/< 4 / thoap t Otv 77t/'4)</(3'/s?( 61uI g ,fi"tru( 6n* 7'4*yo RPr:l"Toe r''-[t llo' l"