Loading...
HomeMy WebLinkAboutPermit Building 1995-09-13CO M M ERC IAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 !iPFIINGFIELO 251aan-JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:4a*r--revNfxu- @leL ASSESSORS MAP:TAX LOI: PHON E: at 4-1STATE:ZIP L-V 4-CITY: ADDRESS: OWNER l37A M, HA\^/lz- bvv> NEW - REMODEL ADDITION DEMOLISH OTHER o?n,qVALUE: DESCRIPTION OF WORK:L- NE\ / MEryl N4ECHANICAL: PHONENAMEA.DDRESS EXPI RES PHONE 77 ADDRESS ]surJ r-tf 3$64 u't PLUMBING ARCH ITECT: ELECTRICAL: CONTRACTOR'S NAME GENERAL:Ar- CONST. CONTRACTOR , PLU MBING NO.FEE CHARGE Single Fixt ure Relocated Bldg (new f ix. addtl) Water Service ft Sanitary Sewer ft. Storm Sewer f t. Backflow Device TOTAL PERMIT M ECHAN ICAL Ntn FFF CHA TIG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent se pa rat e Stationary evap. cooler Vent Fan/Single duct Vent f rom Sys AC lem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER: OCCY GBOUP: I OF STORIES: QUAD AREA: r OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE 35cn TOTAL VALUE OF PROJ X X X SO. FTG MAIN bLl. r lLr AUUtr)D SO. FTG OTHER RCPT#PLAN CHECK FEE DATE BY / 30 'o/ BUILDING PEHMIT b2,''PLU M BI NG DEMOLITION 5% State Su rcharge 3.'3*/j ,ct 5% State Su rc harqe 4oUaA b2';o MECHANICAL FENCE VALUE S 5% State Surcharqe SIDEWALK FT. SU BTOTAL PERM ITS PAVI NG CU RBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL -\ I \ Wet++z 5ppNAFLevo It is the responsibirrty or the pe-rmit no[.,,. ":j,3Y:fPrJ]::::tJ:]: *,"1.op", time. ro request an inspection, ca,726'3769 (recorder), state your City designated iob number, job address, type of inspection requested and when you wi1 be readyfor lnspection. Requests received before 7:00 a.m. will be made the same working day, requests made af ter 7:00 a.m. will be madethe following work day. slrE INSPECTIoN: To be RoucH PLUMBING, pAVtNG: After gravet js inmade after excavation, but ELECTRICAL & place but priorlo placingprior to setup of forms. MECHANICAL: No work is to asphalt or concrete.be covered until these UNDERSLAB PLUMBING, inspections have been made SPECIAL INSPECT|ONS: tn accordanceELECTRICAL & and approved' section 306 of the state speciatty codeMECHANICAL: To be made ATT'^ nDAET --^-- - a special inspector shall be empr'oyeo--before any work ls covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: E,6E6, copy of the special testing reports shalt To be made after trenches are FIREPLACE: Prior to placing be furnished io the Building Division. excavated and forms are facing materials and before -.-- erected, all steel in place, but framing inspection. STRUCTURAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 pS.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after a, insrab buirdins 3i::5:H..:ff 3ffi:::?f,';l:r" 8lx:,.TJJ3nt,Y5.rT,,rrr, ,,service equlpment, conduit, and vents are complete andpiping, accessories and other incir-arv equipment items are ffiH::[#i""ii:fl JJ;[i::: Bl?XrTiE],?l[g,o*tlH:". concrete is placed. |NSULATIoN & vApoR a.6) BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barriers are ln pijce Urt --- FIRE,ROOFING: U.B.C.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior walltlvering isprior to covering or f illing applied.trenches. SPEC|AL GRAD|NG, ,NDERFL..R: prumbins i:::,S"":'fmX3[Hi"' Ef,lU1']il"^,:lL',fJb'lT,"ielectrical, mechanical. T6 be according to plans. Chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU-LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certif icate by an approved lathing and gypsum board, agency, furnished to the City's pOST & BEAM: To be made interior and exterior, ls in Building Division before prior to installation of floor place but before any beams are placed. (2501 U.B.C. insulation, decking or floor plastering is applied or before STDS. 25'10,11). sheathlng. - Sypsum board ioints and fasteners are taped and STRUCTURAL MASONRy: (306 FLooR rNsuLATroN & finished. a.7\ VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or vertlcals in accordance withuBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIOEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. " ln addition to the inspec-tions specified, the BuildingOfficial may make or require other inspections of anycon$truction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certi{y that any and all work performed shall be done in accordance with the ordinancesof the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that No 6CCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. requested at the proper time, that project address is readable from theproperty, and the approved set of plans will remain on the site at all Date times durln o co-astruction. ignature I further agree to ensure that all required inspections are street, that the permit card ls located at the front of the 7 So.o tAMOUNT RECEIVED RECEIPT #RECEIVED BY: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FtRE DEPARTMENT slrE PLAN REvrEw BoARD: Must be requested 2 days in advanceof the date you wish inspection. Alr project conditionL such aslandscaping, parklng lot stri ping, etc. must be completed beforerequesting thls inspection. FINAL BUTLDTNG: Requested af ter the finar prumbing, erectricar,mechanlcal and Fire Department inspections are male andapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Buirding Divisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE VALIDATION:DATE PAID: