HomeMy WebLinkAboutPermit Electrical 1985-02-06INSPECTION L
7?6-37 69
NE
COMB I LI
Job Address I a EIIERGY SOURCES:
Hea t
l,later Heater
Ranqe
So. Ftg. l.la in_
sq. Ftg. Access.-
Sq. Ftg. Other_
_tlew_Add_A1 ter_Pep.
_Fence_Demo_C ha nge/ U s e
-other-
dN
Doa+
Oa
tJ
LegaI Description
Value of l.Jork
Owner
ss PO Box 430 W-400
Be .f €,exas
Des e.,n9 e
Farni Gara
Construction Lender
Addres s Phone
f U I -(
DE5 I GN EAI.l name address I ics. no.exDt res ohone no.
Pri mary
Structura I
E I ectri ca I
Mechan i ca I
CONTRACTORS n ame address''I i cs. no.exDt res ohone no- )
Genera I
Pl umbj nq /7
I
PLUI4B I NG ELECTR I CAL I4ECHAN I CAL
NO FFF C HA RGF NN FFF CHA PG F l'lO FFF C HARGF
Each single fixture Residence of
SQ FT
furnace/burner to
BTU' S
Relocated building
(new fix. additionai )
New ci rcui ts al ts
oa exten s i on s -ott>
Floor furnace
and vent
S. F. Residence(l bath)SERV I CES Recessed wal I
Soace heater and vent
Duplex (l bath) each Al4-A**ttt-t50
Additional bath Temporary C#structi on Apol iance vent
seoa ra t-e
[,later servi ce Chan
res i
ge in existing
dencp
Stati onar-v evap,
cool er
Sewer multifami1y, comm. or
Tndristrial
Vent fan with
sinqle duct
Storm Sewer 0f s Vent systern apart from
heatinq or A.C.
c0Mr.1./IND. FEEDERS Mechanical exhaust
hood and duct
Insta l I /al ter/re1 ocate
di stri h- fpedprc l,Jood stove/heater
0f amps
ISSUANCF OF PFRI,IIT
TOTAL CHARGES TOTAL CHARGES #TOTAL CHARGES
WHERE STATE Lltl REQUIRES that the Electricat work be done byshall not be valiC unti'l the label has been signed by an Electri,
an Electrical Contractor, the electrical portion of this pernit
ca1 Supervisor and returned to the Building Division
I HAVE CAREFULLY EXAI"IINED t he comp Ieted apnlication for oermit, and do hereb.V certify that all i
rformed shall be done in accordance with
nformation hereon is trueand correct, and I further cer tify that any and all work 0e the 0rdinances of the Cityof Springfield and the Laws of the State of 0regon Dertaining to the work described herein , and that NC 0CCUPAHCY will be madeof any
Board i
structure without the permission of the Buil di ng
70t
Division. I further certi fy that my reqistration r,rith the Builder'ss in full force and effect as required by ORS .055, that i f exempt the basi
055 wi'l I be used
s for exemption is noted hereon, and thatonly subcontractors and employees who are in comcliance with 0l?S 701 on this nroject.
I'lAl'tE(please print et-crr'I 5
Zone Const ts Sq. Ftg
t,
l{a i n Va luexFire Zone Bedrooms Load Ftg. Access.Value
Flood Plain Stories Occ.y Group Sq. FtS x Value
TOTAL VALUATION_----
. Other
BUILDING PERI'IIT
Charges and
Surcharges
Plan Ck. Comm/Ind
65%/81dq Per Fee
Systems Deve
Charqe fl.51 I opment
I
Plan Ck. Res
30%/81dq Per Fee
PLUI4BING PERMIT
Charges and
Surcha rges
Fence v
D6mo
ELECTRICAL PERI|IT
Charges and ,, iSurcharges P' 't
Si dewa I k
A/C Paving Total Comb. Permit
T,IECHANICAL PERMIT
Charges and
Surc ha rges
Curb Cut
TOTAL 3/.ry
HlilUzl
COMBINATION APPLICATION/PERMIT (CAP)
I. Applicant to furnishA. Job AddressB. Legal Description1. example- Tax Lot 100, Lane County Map Reference
17 03 43?. example- Lot 1. Block 3, 2nd Addition to
SFFTn--n g f i e I d E s ta tesC. Name, etc. of owner and construction lenderD. Energy Sources r )
1. exampl e-2. eiffiI-e-E. Square foota
hea t/e ical or forced air gas
wa r e or solar
ge or valuat o0'c.
F
l. example- 1250 sq. foot house, 500 sq. foot garage2. example- if new project, check new - if addition,
check add, etc.
Building permit information:1. example - construct single family house with an
attached garage
2. example - remodel existing garage into family room3. example - convert singie family residence into
restaurant (change of use)
Value of work as defined in Section 303 (a) of theStructural Specialty Code
DESIGN TEAM AND CONTRACTORS
To avoid design or construction delays, Building
Division Staff must be able to contact appropriate
persons regarding design information or job site
G.
H
corrections, etc.II. Abbreviated Plumbing, Mechanical,A. Except where blank spaces occuportion of the Mechanical and
the appl icant need fill-r'n onlto the appropriate item(s) toB. Full Plumbing, Mechanical, and
are available at the Building
&r
El,
v
be
E
Di,
Electrica l Schedules'in the description
ectrical Schedules,
the No. Boxes adjacent
installed
lectrical Schedules
vision1. To conserve space on the permit form the schedules
have been abbreviated2. If the item(s) to be instal led are not covered on
the abbreviated schedules you should consult thefulI schedulesC. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULESD. As noted on the CAP, the label must be delivered to theelectrical contractor for signature by his electrical
supervisor. The general contractor is not authorized
to sign the electrical label.III. Appiicant to sign and date
l,Ihenever possible, the initial appfication wiII be used as
a worksheet only. l,lhere possible, Building Division Staffwill prepare a type wnitten copy and return it to the
applicant at the time the actual permit is issued for his
signature.IV. Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable r,/hen the permit is issued.
V. FOR OFFICE USE ONLY
PERMIT VALIDATION
p # Lqtar
alt/n'
Permi t Cl erk
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPAIICY:
Permit app'licant exempt from registration with the Builder's Board because:
Additional Proiect Information:
PLANS REVIEI,JED BY:
name Si g nature date