HomeMy WebLinkAboutPermit Building 1985-01-04Job Address:
Orrner:
SITE INSPECTION:-:after excavatron
to setup cf forns.
lJNDERSLAB
To be nade
, but Priot
Phone
Phone:
ATTIC DRAFT STOPS & CURTA.I}I WALLS
?RO?ER TIllE,
TRONT OF T1lE
JOB NIJ}{BER'
Con tractors
day,requests
7rl
STRIJCTURAL CONCRETE: IN CXCCSS Of 3OO.
P.S.L (306 a.1.)
STRUCTUR{L I'IELDS: Preformed on the
job. (2722 f)
HIGH STRENGTH BCLTINq: During all
E6tt instattaticn and tighting
operations (306 a.5)
SPRAYED ON FIREPROOFING: (U.B.C.
StanCards 43-8)
SPECIAL ING EXCAVATION A,\D
a. 11
E cffi-ter zs;
GLU-LAM BEAt'lS: Inspection Certificate,
by an approved agencY, furnisheC to
the Cityts Building Division before
beans are placed. (2501-U.B.C. STDS.
2s-10,11) .
* In addition to the inspections
specified hereon, the Building
Official :nay nake or require other
inspections of any construction
work to ascertain compliance with
the Building, City or Zoning Codes.
S: In accordance tr'i th
on t Bui lding Code a special
inspec tor shall be emPloYed by the 0wner/
tor during construct i on of the
fcllowing uork'A coPY of the sPecial
testing reports shal1 be furnished to the
Building Division
e
FIREPLACE: Prior to Placing facing
materGr! and before franing
in sp ect ion .
ffinu'ool
required vapor barriers are in place
bui before anY lath or gYPsur board
interior wa11 covering is applied'
FRAMING: To be made after the roof,
Eil-Eir;.ng, fire blocking and
bracing are in Place and all PiPes,
chimneys and vents are conplete and
the rough electrical, plurnbing and
heating wires, PiPes and ducts are
approved.
FIRE E SE!484II9N-I4!!: Located &
BE .|CCESSIBLE, ADJIJSNENT
tr
8
ffii,uli*o"
service equiPnent, conduit, PiPing,
accessories and other ancillarY
equipment items are in Place -butUetore any concrete is Poured'
FOOTINGS & FOUNDATIONS: To.be rnade
;?te;-treilIes arc excavated and
forms are erected, all steel in
place, but prior to pouring concrete
INDEBaROUNp: Plumbing, Electrical'
6-;itary Sewer, Storln Seweil
Water anC Drainase lincs. To be
-
nade prror to coverlnt or r].rrlng
trenches.
UNDERFL0CR:, Plumbing, Electrical,
Mechanical. To be nade Prior to
installaticn of floor insulation,
decking or floor sheathing.
POST & BEAM: To be made prior to
any covered
G'stAllailoi of floor insulation,
decking or floor sheating..
FLOOR INSULATION 6 VAPOR BARRIERS:
To be nade prior to installation
of decking or flcor sheating.
IIASONRY: Steel location, bond beams
groutIi-g or verticals in acccrdance
with U.B.C. Section 2415.
ccnstructeC accorCing to Plans
LATTI GYPSIJM BOARD INSPECTION
er
g)?surn boarcd, interior and exterior'
is in place but before any Plasteri
is applied or before gypsum board
jcints and fasteners are taPed and
finished.
WOODSTOVES: After installation is
;onpieGa;
SIDEWALK & DRIVEWAY:Required for
al1 concrete paving within street
right-of-way, to be made after all
excavating complete 6 form work &
sub-base naterial in place.
CURB .AND .{PPROACH APRON: After forms
@pouring
concrete.
PARKING LOT: After gravel is in
place but prior to placing asphalt
or concrete.8ffi"until these inspections have b
ROOF STIEATHING A}ID NAILING@
made and approved
FIN.q,L PLI'MBING
FINAL ELECTRICAL
FINAL MECHANICAL
FTNAI, FTRE DEPARTMEIIT
Prior
covered
,een
CIIYTS SIIE PLAN REVIEW BOARD INSPECTION: Must be requested 2 days in advance of the date you
suchaslandicaping,pu,iinglotstri.pi.ngetc.must
be conpleted befcre requesting this inspection.
l-Fl FINAL B[IILDING: Must be requesteC after the final plumbing, Electrical, llechanical and Fi:.eL I Dcpartment inspections are made and approved. No occupancy of the premises can be made untila certificate of occupancy has been issued by' the Building Divisicn and posted on the pfenise
*ALL LTANHOLES .4ND CLEANOUTS III]ST
-
INSP
B
T0 BE I,IADE A? NO cosr ro THE CIry.
Your CitY Designated Job Number Is: