Loading...
HomeMy WebLinkAboutPermit Plumbing 1997-11-13CO M M ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fifin Street, Springfield, Oregon 97477 JoB NUMBE R ??/€?5- INSPECTION LINE: 726-3769 OFFICE: 726-3759h, /S 7C ,4oLta,^ll( SPRINGFIELD LOCATION OF PROPOSED WORK ASSESSORS MAP;TAX LOT: ,-ffi-5,f0^/€1{PHON E: l6e AJ4C\STATE:ztP .5 4CITY: ADDRESS OWNER: NEW - FIEMODEL ADDITION DEMOLISH OTHEFI VALUE: DESCRIPTION OF WORK: I ADDRESSNAME PHONE ADDRESS EXPIRES PHONE ELECTRICAL: ARCHITECT: CONTRACTOR'S NAME MECHANICAL: CONST. CONTRACTOR # GENERAL: PLUMBING PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft /2?Sanilary Sewer ft /au Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NN F'FF EHARGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent from System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE -HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGEI WATER HEATER CONSTR. TYPE: HEAT SOUBCE: LAND USE: # OF UNITS OCCY GBOUP: * OF STORIES: QUAD AREA: * OF BLDGS: VALUESO. FT,$/SQ. FT. TOTAL VALUE OF PROJ X x SQ. FTG MAIN SO. FTG ACCESS SQ. FTG OTHER RCPT'PLAN CHECK FEE DATE BY /v-?> BUILDING PERMIT PLUMBING /a.n DEMOLITION 5% State Surcharge 5% State Surcharqe re 7:.4,2D MECHANICAL FENCE VALUE $ 5% State Surcharge SIDEWALK FT, SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL > ZONING: REOUIRED INSPECTIONS It is the responsibillty of the permit holder to see that all lnspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:O0 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the tollowing work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB PLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRICAL & and approved. section 306 of the state specialty code MECHANICAL: To be made a special inspector shall be employed before any work ls covered. ATTIC DRAFT STOPS & by the Ownei/ Contractor duringcuRTAlN WALLS cbnstruction of the following w6rk. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished io the Buildi-ng Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' STRUCTURAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 p.S.l. (306 a.1) coNcRETE SLAB: To be the roof, all framing' fire made after an rnsrab buirdins 3l::5 ::.':ff 3F:Ir";ffi;:r" F:Iy,fl"',X3.t,Y5ilTirrr, ,service equipment, conduit, and vents are.complete andpiping, accessories and other incittary equipment items are :|i'fl::1"",1i""j[,X'JJ;[3:1: Bl?lf],?E]noT,l".?i,"tl$X"oin place but before any tightening operations. (306concrete is placed' lNsuLATloN & vApoR a.6) \/ uNDERGRoUND: prumbino. BARRIER: To be made after all;,x;Hri'.'ffi Nil,Tiilitfl;:1x:{i!;'"' Eiffih".?i^;G:UBCstorm sewer, dralnage llnes. To be made board interlor wallloverlng isprior to covering or filling applied.trenches. etsrllvv. SPECIAL GRADING, ,NDERFL..R: prumbins [lT:,S'.="'f;I'1'J3l:H]"' if,flt![l'-tli:,5Jb'i],"t electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulation, decklng or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspectlon floor sheathlng. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the City's pOST & BEAM: To be made lnteriol and exierlor, Is in ' Building Division before prlor to lnstallation of floor place but before any lgams are placed. (2501 U.BC. insulation, decklng or floor flastering ls applie6 or before STDS' 25-10,11). sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY (306 FLOOR TNSULATTON & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof coverlng. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specified, the BuildingOfficial may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Divlsion. I further certify that only contractors and employeeswho are in compliance wlth ORS 701.055 will be used on this project. Signal Date /3*7 ) ocdted U nred S ect Son rearereqp U atested theq at he ro nt o he and thpropertv, L arc that the perm du proper time, that project address is readable from the e approved set of plans will remain on the site at all I further agree to ensure that all it card is I rction. VALIDATION q 3-?,AM NT RECEIVED RECEIPT *:RECEIVED BY: DATE PAID FINAL PLUMBING FINAL ELECTRICAL FINAL FIRE DEPARTMENT SITE PLAN REVTEW BOARD: Must be requested 2 days in advanceof the date you wish lnspection. All proJect condition's such aslandscaping, parking lot striping, etc. must be completed beforerequestlng thls inspection. FINAL BUILDING: Requested after the final plumbing, electricat,mechanlcal and Fire Department inspections are made andapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE FINAL MECHANICAL