HomeMy WebLinkAboutPermit Mechanical 1994-01-24COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Fiflh Street, Springfield, Oregon 97477
4,000
SPRINGFIEL()
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:
ASSESSOFIS MAP:TAX LOT:
683-9001Metco Investment Realtv PHONE:
Euqene.ZIP:91497STATE:OR
315 E. 13th
CITY:
ADDRESS:
OWNEFI:
NEW
-
FIEMODEL X ADDITION DEMOLISH OTHER
Replace gas package q!r! !! laAf
VALUE
DESCRIPTION OF WORK:
GENERAL:
EI EffiOIAAI
ADDRESS PHONENAME
ADDRESS EXPIRES PHONE
ene. 0R 97402 #00460 6/27/94 342-8t07Comfort Flow Heatinq 855 W. 1st, Eug
CONTRACTOR'S NAME
ARCHITECT:
PLUMBING:
MECHANICAL:
CONST.
CONTRACTOR /
PLUMBING
NO.I FEE CHARGE
Single Fixture
Relocated Bldg.
(new f ix. addtl)
Water Service
fr
Sanitary Sewer
ft
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICAL
NO FEE .HA R/]F
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
-Gas Package Unit./ 1nn OOO FtTl lc
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE -
LAND USE:
ZONINGY OF UNITS:
HANDICAP ACCESS:
FLOOD PLAIN:
LIGHTING POWER BUDGET:
WATER HEATER:
OCCY GROUP:
* OF STOBIES:
QUAD AREA:
I OF BLDGS:
CONSTR. TYPEr
HEAT SOURCE:
VALUEso. FT.
X
SQ. FTG MAIN
SO. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE BYDATE
BUILDING PERMIT PLUM BI NG DEMOLITION
5% State
Surcharge
5% State
Surcharqe
MECHANICAL 5 FENCE
VALUE $
5% State
Su rcharq e
SIDEWALK
FT.
SUBTOTAL
PERM ITS
tWn a,nrL o ec CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL o15.rq
t
$/SQ. FT.
TOTAL VALUE OF PROJECT ; r
r)')
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job4umber, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m ill be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
ROUGH PLUM
HANICAL: N rk is to
s have been made
approved
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUN D: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
RooF sHEATHTNG AND iHffi^H'^fi'"r:'of""!|'"
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
E
be covered
tns
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all f raming, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owneri Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 PS.l. (306 a.'1)
STRUCTURAL WELDS:
Performed on the job. (2722 t)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
STRUCTU RAL MASONRY: (306
a.7)
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
e
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
requested at the proper time, that project address is readable f rom the
the property, and the approved set of plans will remain on the site at all
ig Datere /- z,z-7?
I further agree to ensure that all required Inspections
street, that the perm card located the front o
ti es during const lon
DATE PAID
RECEIVED
'ALIDATIO AMOUNT RECEIVED
RECEIPT #
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
bt)
COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
SPRINGFIELO
1360 }X]I{AVK B\TI,D.,SPRT}{GFIND, OR 971t77
LOCATION OF PROPOSED WORK
ASSESSORS MAP:/2-a- -at- R \TAX LOT:
E1'GU$ECITY: STATE:
},IETM IN\ESTI,IMW REALTY / STU BURGT 683-9001PHON E
315 E. l3Tr{.,EUGENE
1:.
ADDRESS:
OWNER:
97401
ZIP:
-
RE-ROOF
4E00.00VALUE:
DESCRIPTION OF WORK:
MECHANICAL:
-
NAME ADDRESS PHONE
Eugene
a
ARCHITECT:
PLUM BI NG
G EN ERA L:
CO\]STRUCTION ASSOCIAMS
CONTRACTOR'S NAME ADD RESS
CONST.
CONTRACTOF '
74662
EXPIRES
8-4-94
PHON E
688-8385
ELECTRICAL:t
PLUMBING
NO.FEE CHARGE
Single Fixture
Relocated Bldg.
(new f ix. addtl)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
NO trFF
<100,000 BT Us
Furnace/burner & vent
Furnace/burner & vent
>'t00,000 BTUs
Floor furnace and vent
Suspended wali oilloor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
s10.00Permit lssuance
TOTAL PERMIT
_ OFFICE USE -
LIGHTING POWER BUDGET:
LAND USE:
HANDICAP ACCESS:
-
FLOOD PLAIN:
ZONING:
OCCY GROUP:
I OF STORIES:
QUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
* OF UNITS:
WATEFI HEATEB:
SQ. FT.$/so. FT.VALUE
TOTAL VALUE OF PROJ
X
x
x
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
PLAN CHECK FEE RCPT#DATE BY
BUILDING PERMIT 57-sa PLUM BI NG DEMOLITION
5% State
Su rcharge z-53 5% State
Surcharge
MECHANICAL FENCE
VALUE S
5% State
Surcharge
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICA-
JoB NUMBER-?-38<€-
INSPECTION LINE: 726-3769
OFFICE: 726-3759
MECHANICAL
^Hn anE
v REOUIRED INSPECTIONS .-
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an irlspection, call
Z26.g169 (recorder), state your City designated job number, job address, type o{ inspection requested and when yc u will be ready
for inspection. Requests received before 7:OO a.m. will be made the same working day, requests made after 7:00 a.rn. will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work js covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be'' made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before anY
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
t
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
f loor sheathlng.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheath i n g.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these. inspgctions have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
. the roof, all framing, fire
blocking and bracing are in
place and all Pi Pes, chimneYs
and vents are complete and
the rough electrical, Plumbing
and mechanical are apProved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vaPor
barriers are in place but
before any lath or SYPSUm
board interior wall covering is
applied..
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before anY
plastering is apPlied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
APRONS: After forms are
erected but Prior to Placing
concrete.
PAVING: After gtavel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the followtng work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETET ln
excess of 2500 PS.l. (306 a.l)
STRUCTURAL WELDS:
Performed on the iob. (2722 t\
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthworl(. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: Inspection
Certificate by an approved
agency, f urnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
srDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7)
'ln add tion t e inspec
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
verticals in accordance with place.
uBc 2415'
cuRB AND APPR.A.H
ROOF SHEATHING AND
NAILING: Prior to installing
any roof coverlng.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct,-and lfurther certify that any and all work performed shall be done in accordance with the ordinances
of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that No oCcUPANCY
will be made of any struciure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this proiect'
I further agree to ensure that all required inspections are requested at the proper time, that project address is rc;:lable from the
street, tn"-t tn" permlt card is located at the front of the property, and the approved set of plans will remain on the site at all
l2-lDateSignature 4 b
times during construction
VALIDATION o 9L
5AMOUNT BECEIVE
RECEIPT *:RECEIVED BY:
DATE PAID
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 da5'5 in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this insPection.
FINAL BUtLDING: Requested after the final plumbin0. electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be madc until a
Certlflcate of Occupancy has been issued by the Building Division
and posted on the Premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
-
.V
d
i
i
'-4-
CTNEILHS;
U. L. CLASS A/SL0PE RANGE: 0" lo 1/2"
nailable deck
Nt 24-CAP
MATERIAL REOUIRED PER ll)l] SOUARE IEET
OF ROOF AREA
Mechanical Fasteners
Conbase W-1 lV 1 ply
Conply A-lV 2 plies
Asphalt', plies
Asphalt', Surface Oype lll)
Concap
As r€quired
25 lbs.
22 lbs.
60 lbs.
25 lbs.
75 lbs.
'i
I
l
i
i
l
Accessories and Flashing Materials as Rsquired
:.-. ni :.j r-I
APPL|GAT!0tl..
THE ROOF DECK shall bo firm, c iry ar( pty.,vood sheathrnE :hal bo Bupportod on ail edges
and pdrorly nailed. Ply clips ar€ nor dttoheo tci: ng is allowed
THE CANT STRIP shall b€ nailed to lhe deot \\,ri r )pcr tength mechanrcd tastongr! 12, oc.
coNBAsE w'1 lv shall bo applied al right .rr,ltes , he conlinuous,oints ol th€ surlaca lo be rcotod. con.
bass wn lv shall be lapped 2" on sides and 6" . ( .r rrj L:tp so th6 ltow oi water is oror or paraltsl to, but
ne\,€r against the laps. Turn up 2" abov: tcp ol c r , r I {alls and vertrca surfacss, ir€chinically fasten g"
o.c. on laps and slagger rwo (2) rowg 18' o.c. 12 i j r irc,n each edge /. rernate: i/bchanbally t;srsn with
aPProY€d staplenapo method Rows of tape si ari I ).. Stapto spaiinc shall comply wi0! minulacturer!
r6quirgmentt
CONPLY AIV shali be lapped so the ,low oi \1 iri,I ),. or parallol to, br I iever agalnst, th6 lap6. Ail Bnd
laPs shall bo at least 4" and adjacent ond lar,; llr bc .rt kiast 12,, aparl
EMBED two (2) plies Conply A-lV in shin3le f:shr( . laDpirg 19" with a 17" Exposure.
EMBED the full width ol each sheel in h]l as halr rpp|ed a, a nomrnal raie ,rf 30 lbs. per lOO sq. tt. of root
al€a. Each ply shall be lighlly broomed, usine a rr derately ioft commerci3t push broom, a! il is applied. All
Pli58 shall b€ turnod up 2" abovs the cant an i sli oe sol| moptEd to it).r lant and rr6tlical wall. Buckle! or
lishmoutfu shall be cut ..nd roparred procgrly
CONCAP shall be cut inro 12-18' longths and rllo,. i 1,, etl,rn Appty par.,t,e to undorlying rcoling. Concep
shall b6 lapped 2" on sides and 6' on ends. ,\dja:,;. ,nd ldps shall bo staggerod at Lad 3'apart. t-ap eo
the iorv oI water is over or parallel tO, but n6v:r a. , -si. the laps. Emb6d the full widut c[ caah l2n8' bngth
l!b_!!!i!oltr solid mopping o, hot esphall aprtia, a fonr nal rais ol 25 ,bs. psr 100 sq. ,l ol rco, area.
THEFE MUST BE COMPLETE CONTACT BE''/VE, J C:,NClP ANO MOPPII,IG ASPHALf.
VALLEYSI TATERWAYS shall roceivo an ,xlra i;e f Conpl,, A-lV which sn3lt b€ at loast 36" wid6. lt shafi !r.
tend al leasl 8" up inclines out of valley:. Thi pr., ralt b6 I rid on top of base shget prlor b apdication ol
other pligs, Emll€d the ruit width of eact she( ir j,rlornr ,nopping ot irc! isphall appliad d a nominal r&
ot 30 lb8. por 100 sq. ft. ol root araa"
ON SLOPES exceeding 1-ih, pot loE/.. h ,t asF ,r.r
ol rool area. All BUFI shall be applied p,.rallol : tt
shoets ghall be "back-narled" to thg dec ( or v t(l
sch6duls:
- i e clrec ar a n : r, rate ol 25 lbs. psr 100 sq. lt.J l(- rr C r s, .' ' per toot and gr€ater the !{y, ro . . '--..rJr,,,1 s. a,ions) p€r th6 lollfling
Ply ShaGls Nail these Dlslance! Fr,,m B. :i ::2 18"
3 12"
4 18"
Concap shall be back nailed wilh two (2i tos r., r i r e.€ r -?" o.c
OPrON: The above specrfication may be appt ,i I t C I ocess adhe- .: ?/ attecting lho lollowing
substitutions:
1. Substitute 3 gallons Conheaivo EEr 1{)0 sc r,
2. Substitut€ Contase UJ{ lV as a plr sheot ,
' Relsr to section 2.15, pago 18, for pr()por I r{, I
" ALL application requiremenls lrom tha "Gc'r, r
spociflcations.
)11 ?rj hoi asphalt.
r r fonily ,\-lV is re(,. . I
rnl .t at phall lor sloi r i' volved.
: r, [,rre, rents ' sectic. ir e ccnsidcred parl of thsso
o
l.