Loading...
HomeMy WebLinkAboutPermit Electrical 1997-04-16COMM ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 3{o TAX LOT: SP]II]r.GFIELTT JOB NUMBER WOFar0 2fr, q7e151 aooZ-LOCATION OF PROPOSED ASSESSORS MAP: INSPECTION LINE: 726-3769 OFFICE: 726-3759 PHON E: 4zqzzCITY:ztPSTATE: 4 ADDRESS:I 7'io We ha "tK OWNER: OTHER VALUE:et/ADDITION DEMOLISH DESCRIPTION OF WORK: NEW- REMOD NAME ADDRESS PHONE ADDRESS EXPI RES PHONE /d €o.tzt?,l (-MECHANI -Zzu,, G E N ERAL: CONTRACTOR'S NAME ARCHITECT: ELECTRICAL: ll ao)S- t2 -q4 PLUM BING: CONST. CONTRACTOR # PLT-IMBING NO.FEE CHARGE Single Fixture Belocated Bldg (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL NO trFtr 1:HA FIGF Furnace/burner & vent <100,000 BTUs /Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent Sys from AC tem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE - LAND USE: ZONING HANDICAP ACCESS: FLOOD PLAIN WATER HEATER: OCCY GROUP: * OF STORIES: QUAD AREA: I OF BLDGS: CONSTR. TYPE: HEAT SOURCEI SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY BUILDING PERMIT PLUMBING DEMOLITION 5Yo State Su rch aro e 5% State Su rcharoe MECHANICAL l[, tr( )FENCE VALUE $ 5% State t 2et Surcharoe- ' J to ,1,SIDEWALK FT. SUBTOTAL PERMITS pa Jn t1in ht*n CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL LIGHTING POWER BUDGET: * OF UNITS: It is the responsibility of the permit holder to s 726.3769 (recorder), state your City designated REQUIRED INSPECTIONS ee that all lnspections are made at the job number, job address, type of inspec proper time. To request an inspection, call tion requested and when you will be ready SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: IN excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 t) HlGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.'11 & Chapter 29) GLU.LAM BEAMS: lnspection Certiflcate by an approved agency, furnlshed to the City's Building Division before beams are placed. (2501 U.BC. STDS. 2s.1Ol1). STRUCTURAL MASONRY: (306*A*( aaLJ- for inspection. Requests received before the following work daY. SITE INSPECTION: To be made after excavation, but prior to setuP of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in Place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before anY concrete is placed. UNDERGROUNDT Plumbing, electrical, gas, sanitary sewer, storm sewer, water and dralnage llnes. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathlng. POST & BEAM: To be made prior to lnstallation of floor insulatlon, decking or floor sheathing. FLOOR ]NSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or vertlcals in accordance with uBc 2415. I be made the same working daY,requests made after 7:00 a.m. will be made ROUGH PLUMBING,PAVING: After gravel is in place but prior to Placing is to asphalt or concrete. these ,.Y, ROOF SHEATHING AND NAtLING: Prior to lnstalling anY roof covering. inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to Placing tacing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all piPes, chimneYs and vents are complete and the rough electrical, Plumbing and mechanical are aPProved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vaPor barrlers are ln place but before any lath or gYPSum board lnterior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND'OR GYPSUM BOARD: To be made after all lathing and gypsum board, lnterlor and exterior, is in place but before anY plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but Prior to Placing concrete. 'ln addition to the inspec' tions specified, the Building Officlal may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. (r ICAL:EC By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify th.at all information hereln is true and correct,-and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that No ocCUPANCY will be mide of any struciure without permission of the Bulldlng Safety Divlsion. I further certify that only contractors and employees who are in compllance wlth oRS 701.055 will be used on this project. ns are requested at the proper time, that proiect address is readable f rom the /6DaSignature I further agree to ensure that all required inspectio street, that the permit card is located at the front of and the approved set of plans will remain on the site at all times durlng n stru ct ion 4-Lb - VALIDATION:7 RECEIVED BY: DATE PAIDAMOUNT RECEIV RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVTEW BOARD: Must be requested 2 days in advance of the date you wish inspection. AII proJect conditions such as landscaplng, parking lot striping, etc' must be completed before requestlng thls insPection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanlcal and Flre Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the Premises. ADDITIONAL COMMENTSi PLANS REVIEWED BY DATE