HomeMy WebLinkAboutPermit Building 1996-10-08CO M M E RCIAL/ lN DUST RlAu
PERMIT APPLICATION
225 Fi'ftn Street, Springfield, Oregon 97477
SPRINGFIELc,
LOCATION OF PRO
ASSESSORS MAP:[1tffi'
JOB NUMBER
INSPECTION LINE: 726-3769
FICE:726-3759
TAX LOT:
PHON E
STATE:ztP
OWNER:
ADDR
CITY:
LUEDEMOLISH OTHEB
DESCBIPTION OF WOR
NEW _- REMODEL ADDITIO
NAME ADDRESS PHON E
'S NAM DRESS EXPI NE
CONST.
CONT
MECHANICAL:
ELECTRICAL:
ARCHITECI:
PtUM BING
G ENER
CONT
Single Fixture
fix addt
Relocated B
er ce
ft
ft.
ani ary
ewerrm
Backf low Device
TOTAL PERMIT
rnace/ bu rner & vent
BTUs
Fu<l
Furnace/burner & ven
BTUs
Floor furnace and vent
oormounted unit heater
us pe or
pp ance
separate
at to nary evap.
oolc e
ngannt
duct
f rom
em apart
or
hood and duct
ec
Permit lssuance $10.00
TOTAL PERMIT
ZONING
FLOOD PLAIN
LIGHTING POWER BUDGET:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
Y OF BLDGS:
CONSTR. TYPE:
I
HEAT SOURCE:
HANDICAP ACCESS:
-
WATER HEATEB:
SQ. FT.
VALUE
TOIAL VALUE OF PROJ
X
x
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHEH
PLAN CHECK FEE RC PT,DATE BY
BUILDING PERMIT PLUMBING DEMOLITION
5% State
Surcha 5% State
h
FENCE
VALUE $5% State
rcha SIDEWALK SUBTOIAL
PERMPAVINCURBCUT
FT.SYSTEMS
DEVELOPM
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
NO FFF CHAFIG F
ft.
- OFFICE USE -
LAND USE:
; OF UNITS:
$/SQ. FI.
IoY''.I( ) -
ignature
Date
fon rmat nothalertioderehtyocatiandby3nacoppetednedhempfuamveareatthhvnanceshoherdanatedree,anrd ceStageACncoebonddrmeshByerfoalandworkhapcenyrtirtuhety CYandNUPAocccorrecdthNorUant,e anderehnSndberkwodentohenofsateOregonpertaiStoLaWSeth metidandeandSnoncon ployeestractorsCieofprisrt i aththtyofUhert vvloSInlySafetDBudnvthesofsionthoutUctrepermiStTUemadanyofbet.echSUonrojpsedb701RS055othncenmcohotep mfro heablreaderESSdSecadmhateprojroathpereareestedponsquectpU^tth req ^tteatsltoureNSndtnohereeremrtUherofanagplrovedUanheroppofethrty,p pethardSocitrmcthhatpetreetS
ti s during construction
- - REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.g76g(recorder), state your City designated iob number, iob address, type of inspection requested and when you will be ready
for inspection. Requests ieceived before 7:00 a.m. will be made the same working day, requests made af ter 7:00 a'm' will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
Prior to setuP of forms.
FIREPLACE: Prior to Placing
facing materials and before
framing insPection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
Place and all PiPes, chimneYS
and vents are comPlete and
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be f urnished to the Building Division.
the rough electrical, Plumbing
and mechanical are approved'
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening oPerations. (306
a.6)
UNDERSLAB PLUMBING'
ELECTRICAL &
MECHANTCAL: To be made
before anY work ls covered'
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in Place, but
Prior to Placing concrete'
bond beams g routing or
rticals in ac cordance with
uBc 2415
ROOF SHEATHING AND
NAILING: Prior to installing
ROUGH PLUMBING'
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and aPProved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
PAVING: After gravel is in
place but Prior to Placing
asPhalt or concrete.
STRUCTURAL CONCRETE: IN
excess of 2500 PS.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob. (2722 t)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43'8.
SPECIAL GRADING'
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnsPection
Certificate bY an aPProved
agencY, furnished to the CitY's
Building Division before
beams are Placed. (2501 U'BC'
sTDS. 25-1011).
STRUCTURAL MASONRY: (306
a.7)
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of anY
construction work to ensure
CONCRETE SLAB: To be
made af ter all inslab building
service equiPment, conduit,
PiPing, accessories and other
ancillarY equiPment items are
In Place but before anY
concrete is Placed'
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
Prior to covering or f illing
t re nc hes'
UNDERFLOOR: Plumbing,
electrical, mechanical' To be
made Prior to installation of
floor insulation, decking or
floor sheathing'
POST & BEAM: To be made
Prior to installation of floor
insulation, decking or floor
sheath i ng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made Prior to installation of
decking or floor sheathing'
MASONRY: Steel location,
INSULATION & VAPOR
BARRIER: To be made after all
insulation and reqPired vaPor
barriers are in Place but
before any lath or gYPSUm
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to Plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gYPsum board,
interior and exterior, is in
Place but before anY
Plastering ls aPPlied or before
gYPSum board loints and
fasteners are taPed and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
Paving within street right of
way, to be made after all
excavating comPlete and form
work andlub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but Prior to Placing compliance with the Building,
City or DeveloPment Code.
any roof covering concrete.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE D EPAR MENT
ADDITIONAL COMM
AMOUNT
SITE PLAN REVIEW BOAR D: Must be requested 2 days in advance
of the date Yo u wish insPec tion. All Pro.i ect conditions such as
landscaPing, Parki ng lot stri Ping, etc. mus t be completed before
requesting this insPe cti on
FINAL BUILDING: Req uested after the final plumbing, electrical,
mechanical and Fire De partment insPec tions are made and
approved. No occuPancY of the premises can be made untll a
Certiflcate of OccuPancY has been issued by the Building Division
-and posted ont reml
DATE
DATE PAID
PLANS REVIEWED BY
\\
VALIDATION
RECEIPT #:RECEIVED BY:
signature,
n,h ereithe