Loading...
HomeMy WebLinkAboutPermit Building 1991-05-28COM M ERCIAL/I N DUSTRIA- PERMIT APPLICATION 225 Fiflh Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: ASSESSORS MAP: iffi JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: ( OWNER: ADDRESS: CITY: PHON E STATE:ZIP: -1 VALUE:DEMOLISH OTHER DESCRIPTION OF WOR NEW - REMODEL ADDITIO NAME ADDRESS PHONE ADDRESS EXPI RES PH NEE ct SN ELECTRICAL: MECHANICAL: ARCHITECT: CONTRACTO PLUMBING GEN CONST. CONTRACTOR # PLUMBING NO.FEE CHARGE Single Fixture Relocated Bldg (new fix. addtl) Water Service f t. Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL NO trFtr CHA RCF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT AOD\D OFFICE USE _- 5S(TJLAND USE: ZONING HANDICAP ACCESS FLOOD PLAIN WATER HEATEFI Y OF UNITS: OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTFI. TYPEr HEAT SOURCE: SO. FT,$/SQ. FT.VALUE rc X X TOTAL VALUE OF PROJ SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY BUILDING PERMIT Loi) bl)PLU MBING DEMOLITION 5% State Su rcharqe 3.\3 5o% State Surcharge MECHANICAL FENCE VALUE $ 5% State Su rcharoe SIDEWALK FT, SUBTOTAL PERM ITS PAVI NG CURBCUT FT. SYSTEMS DEVELO PMENT tp:i bqTOTAL PERMIT FEES EXCLUDING ELECTRICAL LIGHTING POWER BUDGET: . REQUIRED INSPECTIONS V It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Reguests received before 7:00 a.m. will be made the same worki ng day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTINGS & FOUNDATIONS: cooy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be'furnished io the Buildiig Division. excavated and forms are facing materials and before erected, ail steel in place, but framing inspection' STRUCTURAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 25OO P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after ail insrab buirdins 3l::5:x.":f, il'3:I.",1,;l:r" BII3,TJJ3.L.Y5t,3ol',rrr, ,, service equipment, conduit, and vents are complete andpiping, accessories and other incirary equipment items are :X? ?,::[f,li"il:,X'JJ;[3::: El?Xf],?E]*"1[,?,o*lH:"0in place but before any tighte;ing operations. (306concrete is placed. TNSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, Oas, sanitary sewer, barriers are in place but FIREpROOFING: U.B.C.storm sewer, water and before any lath or gypsum Standards 43-g.drainage lines. To be made board interior wall covering isprior to covering or filling applied. S'ECIAL GRAD'NG,t renc hes. ,NDERFL..R: p'umbins ll::,S""=",f;m',J3[Hi"' El;flt',iiil:lL:,5Jb'i],"t electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the city's POST & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor place but before any beams are placed (2501 U'BC' insulation, decking or floor plastering is applied or before STDS' 25-10'11)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in APRONS: After forms are erected but prior to placing concrete. "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. verticals in accordance with place. UBC 2415. CURB AND APPROACH f ront tio By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. s are requested at the proper time, that project address is readable f rom thethe property, and the approved set of plans will remain on the site at all sig 1,Date I further agree to e INS thrmit card is truction. street, that times durin VALI RECEIVED BY: DATE PAID:AMOUNT RECEIVE RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDIT AL COMMENTS: SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this i nspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. PLANS FIEVIEWED BY DATE N