Loading...
HomeMy WebLinkAboutPermit Signage 1992-12-29SIGN PERMIT APPLICATION SPflINGFIELE,JOB NUMBER S 225 Fif th Street Springfield, OR SITE ADDRESS: 97 477 ,nspectiorr Line: 726-3769 Ollice: 126-3759 TAX LOTASSESSORS MAP: OWNER:PHONE: ADDRESS CITY:trOG€T€STATE: /l ZIP BUSINESS NAME, FIRM ETC DESCRIPTION OF PROPOSED SIGN(S): (please check and complete all appropriate information) Wall __ Freestanding _ Projecting _ Roof Sing le Face Double Face Billboard _ Other _ Marquee Total Height above Grade /Z 6 t( Square Footag \D ,l at Dimension from Grade to bottom of Sign Enclosure: Vertical Dimension of sign or enclosure:Horizontal Wi Electrical lnstallation: _ Y (lf yes additional electrical permi (b) Type (d) Type 10' nclosure VALUE OF SIGN z7/ & Material Sign is constructed of: List ALL existing signage and attach a photograph of each sign (a) Type h41-L_-Sq. Ftg Sq. Ftg q*d (c) Type l,t/k Sq. Ftg. Sq. Ftg. CONTRACTOR/IN STALLER: ADDRESS: CITY: CONS STATE: PHoNE: 3f 2 -6 f ",?' ZIP: TRU ON CONTRACTORS REGISTRATION NUMBER EXPIRES: EXPIRES:CITY BUSINESS LICENSE NUMBER:Z OFFICE USE Sign District: Zoning a-, 55 d) Land Use Code Sectio Approved By Ouad Area Electrical prior to energizing electrical installation Sign Permit Fee: REOUIRED INSPECTIONS: _ Site to be made prior to sign placement Footing prior to placement of concrete V orrr"hment-1-after lasteners are installed/prior to cover Final completion of sign installation DATE: Additional Comments and/or Conditions By signature, I state and agree, that I have carefully examined the completed application and do hereby certi{y that all inforrnatiort hereirl is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances o{ the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein. I further certily that only corltractors and employees who are in compliance with ORS 701.055 will be used on this proiect. I further agree to ensure that all the permit card is located at the of the sign(s). requi,r€d inspections are requested at the proper time, that project address is readable lrorn the street, that f ron{ of the property, and the approved set of plans will remain on the site at all times during the installation\/ VrW,l 't-"tv1q> Signature Validation: -l l3)Received By: qa&6t t) Date Paid: 1) llq<c-,IAmount Received Receipt Number: . c fi, 'r :' ? -{a,-r Date SIGN PERMIT APPLICATION The application on the reverse side needs to be completed entirely. lf you are the sign contractor/installer. or if you are hiring a contractor, you need to make sure that both the City of Springf ield Business License Number and the Registration Number from the State of Oregon Construction Contractors Board are listed on the application along with the expiration date of each. lf the sign you are proposing to install is illuminated, an electrical permit application also needs to be completed and signed by either a supervising electrician, limited sign electrical contractor, or if you are the business owner who also ownb the building in which you are occupying, and you will be performing the electrical installation yourself, you may sign the electrical application. lf there are existing wall and/or freestanding signs, a photograph(sl of each existing sign needs to be attached to the application. The size of each existing sign also needs to be listed on the application. PLANS To submit for a sign permit, you need to prepare two complete sets of drawings showing all dimensions, total height, and a plot plan indicating where the proposed sign will be located. lf you are installing a f reestanding sign which exceeds 20 f eet in total heiglrt, the looting detail needs to be prepared and stamped by a registered engineer or architect. Af ter the plarr review process is completed, and, iI your sign(s) is approved, one set ol plans will be returned to you. The approved sct of drawings need to be at the site when an inspection is requested for the inspectors reference. INSPECTIONS Depending on your sign(s), you may be required to request one or all of the following inspections during the installation of your sign: Sitc To be requested after indicating on the lot where the proposed sign will be located but prior to any work being performed for the installation of the sign. This inspection is required if there is a question on the location of the proposed sign. Footir.rg To be requested after excavation and the Iorms are installed, but prior to pouring concrete. lf there will be electrical conduit placed in the footing, it must also be in place prior to requesting this inspection. Attachment: To be requested when all fasteners are installed but prior to cover Electrical: To be requested after the electrical connection to the sign is made, but prior to energizing Final After all required inspections are conducted and approved and the sign installation is complete. The inspections that are required for your sign installation will be indicated on the application during the plan review process. Failure to request ANY of the required inspections could result in sign removal in order to inspect the sign at the rcqurred intervals ol work. Torequestaninspection,phoneT26-3769. Thisisa24hour recording. Ontherecordingyouwill needtoleaveyourCity Desigrrated Job Nurnber, location of where the sign is bcing installed. the type oI inspection you are requesting, and when you will be ready for the inspection. All inspections called irr to the recorder prior to 7:00 a.m. will be made the same working day, all inspections phoned in after 7:00 a.m. will be made the following work day. lf you have any questions regarding the application, required plans or inspections, please feel lree to phone the Building Safety Divisiorr at 726-3759. City of Springfield Building Safety Division 225 Fifth Street Springlield, OR 97477