HomeMy WebLinkAboutPermit Building 1993-08-25SPFIINGFIELD .tca Nulttsffi-4>/?69
INSPECTION LiNE: 726-3769
OFFICE: 726-3759
COMM ERCIAL/ IN DUSTRIAL
PERMIT APPLICATION
225 Finn Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:
h,
DTAX LOT:
ZIP:STATE:
ADDRESS
CITY:
DESCRIPTION OF WORK:
NEW
--
REMODEL r ADDITION DEMOLISH CTHER
coNsT.
CONTRACTOR'S NAME . ADDRESS CONTBACTOR # EXPIRES PHONE
MECHANICAL:
-
PHONEADDRESSNAME
ELECTRICAL:
G ENERAL:
PLUM BI NG
Single Fixture
Relocated Bldg.
(new f ix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICAL
NOI FFF EHA RGF
Furnace/burner & vent
< 100,c00 ETUs
Furnace/burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
i Stationary evap.I cooler
Vent Fan/Single
ductI Vent System apart
I from AC or htg.
I
I
Mechanicai exhaust
hocd and duct
I
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE _
ZONING:
HANDICAP ACCESS:
FLOOD PLAIN
I-IGHTING POWER BUDGET:
WATER HEATER:
CONSTR. TYPE:
HEAT SOURCE:
LAND USE:
/ OF UNITS
OCCY GROUP:
* OF STORIES:
OUAD AREA
, OF BLDGS
SO. FT.$/SQ. FT.VALUE
X
Y
SO. FTG MAIN
SO. FTG ACCESS
SO, FTG OTHER
RCPT#D^rE 3-29-27 av
BUILDING PEBMIT PLUMBINGEO DEMOLIT
</2PLAN CHECK FEE ?, 5
5% State
Surcharee
MECHANICAL
5% State
Su FT.
VA
5% State
FENCE
SIDE'I/ALK SUBTOTAL
PEFMITS
PAVI NG SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDII.IG ELECTRICAL
2^>;e
CURB'ltir
FT.
4 ?/-_-,
PHoNE: :i \* 7/>
NO trtrtr EH A FIGF
TorAL VALUE oF PRoJEcr 7P- -8
*2,l
- REQUIRED TNSPECTIONS -
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated.iob nrrriiber, job address, type of inspectir:n requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made af ter 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
priar to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SpECIAL ;NSpECT1ONS: tn accordance
ELECTRICAL & arld approved. Section 306 0f the state Specialtv Code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during
CURTAIN WALLS construction of the follovrlng work. A
FOOTINGS & FOUNDATIONS: F15Fh' A^E. copy of the special testing reports shall
To be made after trenches are Fii?EPLACE: Prior to placing be furnisned to the Builcling Division.
excavated and forms are facing materials and before
erected, all steel in plac.e, but framing inspection' i --- srRUcruRAL CoNCRETE: ln
prior to placing concrete. f FRAMING: To be made after excess of 2500 P.S'|. (306 a.1)
coNcRErE SLAB: ro be U:;;:l;iXJ'i['Jlfl;'X,? ," srRUcruRAL wELDS:
made after all inslab building place aid all pipes,ihimneys Performed on the iob. (2722 i)
service equipment, conduit, and vents are'complete andpiping, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING:
ancillary equipment items are and meihanical are approved. During all bolt installation and
in place but before any tightening operations. (306
concrete is placed. TNSULATION & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON
electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.
storm sewer, water and before any lath or gypsum Standards 43-8.
drainage lines. To be made board interior wall covering is
prior to covering or filling applied. SpEC1AL GRAD;NG,trenches.
,NDERFL..R: prumbins l:::,S".'"'f;m',J3l:[]"' 5l:ixT:]Jil:,5Jb'i],"i,
electrical, mechanical. To be according to plans. chapter 29)
Iiii'"'fl1?,:lLl::tjl;,tl:".?t ,(n LArH 4ND/.R GYPsuM GLU'LAM BEAMS: rnspection
f loor sheathing. BOARD: To be made after all Certif icate by an approved
lathing and gypsum board, agency' furnished to the City's
posT & BEAM: To be made interior and 6xierior, is in Building Division before
prior to installation of floor place but before any beams are placed' (2501 u'Bc'
insulation, decking or floor plastering is applied or before STDS' 25-10'11)'
sheathing.
vvvrrrrrv gypsum board ioints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR INSULATToN & finished' a'7)
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
anY roof covering.
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
-
Required for all concrete
paving within street right of
way, to be made after all
excavating comPlete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but Prior to Placing
concrete.
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By Signature, l state and agree, that l have carefully examined the completed application and do
herein is true ano correct,"anj I f urther certify that any and all work performed shall be done in
of tho city of springfieid, and the Laws of thqstate of oregon pertainlng to the work described
will be made of .ny "trr"iri" *itnout permission of the Building Safety Division' I further certify th
who are in compliance with oRs 701.055 will be used on this project'
35--'f-Date
hereby certify that all information
accordance with the Ordinances
herein, and that NO OCCUPANCY
at only contractors and emPloYees
adabre ro m ehroaddectrESSsrotihatdtetheatffi€,Puesppereq
alalremonnSIheteetoNSahearovedpandpprtv,
-f,<-
no areSectiudrenSrealhatpreentoSUreqfuhertag
h e f rontsocatdLedrmcardhatethpeStreet,.4cttrulonnrImestiudscons
xtUnateSis
VALIDATION
4-29 9Eq-r>
a2AMOUNT RECEIVED:
RECEIVED BY:
DATE PAID
RECEIPT #:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All proiect conditions such as
Lnascaping, parking lot striping, etc. must be completed before
requesti ng this insPection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
certiticate of occupancy has been issued by the Building Division
and posted on the Premises.
-+
ADDITIONAL COMMENTS: -
DATE /--,PLANS REVIEWED BY
s )
ss/r t'
e'
c{
-'L
2l
Gr^{.r5 3' }r5L
_TJ
I
rF
'!.\
\_t,
t
s
L
11"'.t
:
N
S.
te€T
4x
trlad 1
_{_
T bD)
u rl2l Jorg
,,2/b,a Jos\3 ai L'\'o?
-!\d -o\J
(^)
o.\-
L
,:
L,
iF
J.
rP
{
,r
P+\L
iI
II
-l