HomeMy WebLinkAboutPermit Building 1993-08-30COMM ERCIAL/ IN DUSTRIAL
PERMIT APPLICATION
225 Fi{h Street, Springf ield, Oregon 97477
JoB NUMBER ?7r?%
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT
SPRI}lGF3ELO
,h,
Z
z_
LOCATION OF PROPOSED WOFIK:
ASSESSORS MAP:
STATE:
PHONE:
ZIP:%/a7
-3>>
CITY:
ADDRESS
OWNER
NEW
-
REMODEL ADDITION DEMOLISH OTHER VALU
DESCRIPTION OF WORK
PHONEADDRESSNAME
PHONEEXPIRESAD
z,
CONTRACTOR'S NAME
ARCHITECT:
GENERAL:
CONST.
CONTRACTOR #
FEE CHARGENO.
Single Fixture
Relocated B
ew lix. addt--WateiEerviE
ft-sa;lGry Sewer ft- Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
NHAFIGFFFFNO
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
EuspenOeO wall or f loor
mounted unit heater
nt
SC
ance
Stationary evap.
cooler
-TentFEnT-ingle
duct
Vent
f rom
Systern apart
AC or htg.
-Mecnanlcal exhaust
hood and duct
$10.00Permit lssuance
TOTAL PERMIT
ZONING
- OFFICE USE _'IANDICAP ACCESS
trLOOD PLAIN
I-IGHTING POWER BUDGET:
WATER HEATER:
LAND USE:
OCCY GROUP:
I OF STORIES:
OUAD AREA:
* OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
C OF UNITS:
VALUE$/SQ. FT.SO. FT.
ISO a_eTOTAL VALUE OF PROJE
x
X
X
SO. FTG MAIN
SO. FTG ACCESS
SO. FTG OTHER
RCPT#PLAN CHECK FEE BYDATE
BUITDING PERMIT ?{o>PLU M BI NG DEMOLITION
5% State
Su rch arge /.2f 5% State
Surcharge
MECHANICAL FENCE
VALUE S
5% Slate
Su rcharo e
SIDE\r'JALK
FT.
SUBTOTAL
PEHI','liTS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
26-2rTO-TAL PEBMIT FEES
E}iCLUD I I.IG ILECT FIICAL
PLUMBING:
MECHANICAL:
ELECTRICAL:
REQUIRED INSPECTIONS
V
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be readyfor inspection' Flequests received before 7:00 a.m. will be made the same wcrking day, requests made after 7:00 a.m. will be madethe following work day.
SITE INSPECTION: To be ROUGH PLUMBING, pAVtNG: After gravet is inmade after excavation, but ELECTRICAL & place but priorlo placingprior to setup oJ forms. MECHANICAL: No work is to asphalt or concrete.
be covered untll these
UNDERSLAB pLUMBING, inspections have been made SpEC;AL INSpECTIONS: In accordanceELECTRICAL & and approved. Section 306 of the Statc Speciatty CodeMECHANICAL: To be nrade
^TTr^ hb^Ea a special inspector shall be employedbefore any work is covered. ATTIC DRAFT STOPS & by the Ownei/ Contractor duringCURTAIN WALLS constructiorr of the follow,rng work. A
FOOTINGS & FOUNDATIONS: _ r,nFhi ^AF. copy of the special testing reports shall
To be made after trenches are FiREPLACE: Prior to placing be furnished io the Buildiig oivision.
excavated and forms are facing materials and before
erected, all steel in place, but framing inspection'
prior to prr"in!-"onJ;;i".' - -'
{ FRAMTNG: ,o ou ,,,"0" ,,,u,. :]}'":'"Yit5r"":J:EEI=j,'i
coNcRETE SLAB: To be the roof' all framing' fire;;;;;ita;, insrab buirdins 3i::5::..:ff |ffi:I'J,H;:r" ;$:,"J"T3"t,Y5ilTirr2 uservice equipment, conduit, and vents are complete andpiping, accessories and other
lncir-ary equipment items are :X'.H::[fligi':,.X'JJ;[i:l: Bl?:f],ffi]?T*B,."THX"o
concrete is placed. INSULATIoN & vApoR a.6)
BARPIEI: To be made after aliUNDERGROUND: Plumbing, insulailon and required vapor SpRAYED dNelectrical, gas, sanitary sewer, barriers are in place but FlREpRooFlNG: U.B.c.storm sewer, water and before any lath or gypsum standards 43.8.drainage lines. To be made board interior wall iovering isprior to covering or filling applied.trenches. SPECIAL GRAD|NG,
,NDERFL..R: p,umbins [l?:,fl"":: m'J3[,Y1"' il!fifiii-t[?,5Jb'i],";electrical, mechanical. To'be according to plans. Chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection
floor sheathing. BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency, furnished to the City's
pOST & BEAM: To be made Interior and exterior, is in Building Division before
prior to installation of floor place but before any beams are placed. (2501 U.BC.
insulation, decking or floor plastering is applied or before STDS. 25-'10J1).
sheathing. - Sypsum board joints and
fasteners are taped and STRUCTURAL MASONRy: (306
FLooR rNsuLATroN & finished. a.7)
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHE.ATHING AND
NAILING: Prior to installing
any roof covering.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
'ln addition to the inspec-
tions specified, the BuildingOfficial may make or require
other inspections of any
construction work to ensurecompliance with the Building,
City or Development Code.
en
rm
re that all required inspections are requested at the proper time, that project address is readable from theproperty, and the approved set of plans will remain on the site at all
Sig n atu re Dale 6'30-
tatS ande atth h carefave U mexaBygnure,ree,ag ned eth oc d catv o an dn od erehmpleteplap rtie ha a nbyty rmati on
dan rthu er ertnhereiSrUanecdrreoct hat aland worktyany edform alsh be od ne npe rdo an e h he Ord nancethcnofelfianddeth^tLaws eth S e ofvSpris n n tho e rkOregonpertaiwo de nSC dbe e reth ansn,A Nhat (Jo U PA NCYbeemadofrucstretuithoutonSSIhanyBurdiSafetDvtstn.permi o fu errth ert thatngv on on 'actr torstyv m oyeeplhoarecomnancethRo701Sp.055 ube sed thn s ec t.proj
card
tion.
is located at the front of the
I further agree
street, that the
times during co
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECH.ANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. AII project condition! such aslandscaping, parking lot striping, etc. must be completed beforerequesting this inspection.
FINAL BUILDING: Requestecl af ter the final plumbing, electrical,mechanical and Fire Department inspections are made ancjapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Builcling Divisionand posted on the premises.
ADDITIONAL COMMENTS
PLANS REVIEWED BY
AMOUNT BECEIVED: Z4:-><DATE PAID:
DATE
VALIDATI
RECEIPT *:
of
and
il
RECEIVED BY: