Loading...
HomeMy WebLinkAboutPermit Miscellaneous 1982-01-01225 Nof,h sth Steet Springlield, Orego^ 97 477 IT 15 THE RESPONSIBILITY OF TI1E PEM4IT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT TI1E PROPER TI}'18, THAT EACII ADDB,ESS IS READABLE FRO},I T}iE STREET, AND THAT TIIE PER}.,[IT CARD IS LOCATED AT TIIE FRONT OF THE PROPERTY, BUILDING DIVISION APPF.OVED PLANS MUST BE ON JOB SI,TE AT ALL TI}TES. PROCEDLIRE FOR REQUESTING IIISPECTIONS; Ca11 726-3769 (recorder) state_you CITY DESIGNATED JOB NIIMBER, job address, type of inspection requested and rrhen_yorr-wiIl_be-ready^for_ the insp_ecticn. _Contractors6. or*"r" narne"ind phone number. Iiequests received before 7:00 am will be rnade the same day, requests received after 7:00 am."rill- be nade the fo1-lowing work day. Your City Designated Job }lumber Is e 2o331 Job Address LC €67* SPRTI'GFIEI-D Owner: -tequired lnspe ions.. 7 za:-Szt \ CTIY OF SPRINGF'IELD rr,ith the ilding Code a special (306 a.11 Contractor 5a:<-,F Phone: Phone : SITE INSPECTION: To be made after excavation, but prior to setup cf fcrms. LJNDERS LAB f LUI\,BIXqr ELECTP.I CAL MECHANICAL: Tc be nade befcre any h'or covered CONCRETE SLAB INSPECTION: TO bC nade after all inslab bui1ding service equi.pnent, conduit, piping, accessories and other aacillary equiprnent items are in place but before any concrete is poured. FOOTINGS 6 .FOINDATICNS: To be made after trenches are excavated and forms are erected, all steel in p1ace, but prior to pouring concrete UNDERGROpN.D: Plunbing, Electrical, Gas, Sanitary Sewer, Storm Sewer, Water anC Drainage lines. To be nade prior to covering or filling trenches. UNDERFLoOR:, Plumbing, Electrical, Mechanical. To be nade prior to installation of floor insulation, decking or floor sheathing, POST 6 BEAI'I: To be nade prior to installation of floor insulation, decking or floor sheating'. FLOCR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or flcor sheating. I{ASONRY: Steel location, bond bearns groutira or verticals in accordance with U,B.C. Secticn 2415. ROCF SIIEATHIIJG AI'ID NAILING: Prior@ RCUGH PLUT,IBING, ELECTTI.ICAL E I.IECHANCIAL: No worl< is to b, ATTiC DRAFT STOPS 6 CURTAIN WALLS PECIAL INSPECTIONS: In t w FIREPTACE: Prior to placing facing naterials and before franing i inspection, INSULLTION 6 VAPOR UTBRIER: To be rnade after all insulation and required vapor barriers are in place but before any lath or glpsurn board interior wal1 covering is applied. FRAMING: To be made after the roof, Eff-ilraning, fire blocking and bracing are in place and all pipes, chimneys and l'ents are complete and the rough electrical, plumbing and heating wires, pipes and ducts are approved. FIRE & SEPARATION WALL: Located E ccnstructeC according to plans, LA'I}I AND/OR GYPSIJIVI BOARD INSIIIIION To be nade after all lathing and g)?sum board, interior and exterior, is in place but before any plasteri is applied or before gypsum boardjcints and fasteners are taPed and finished. WO0DSTo\IES: After installation is cornpGGA SIDEWALK G DRIVEWAY: Required for all concrete paving within street right-of-way, to be made after all excavating conplete 6 fcrn work & sub-base material in place. CURB AND APPRoACH APRON: After forns are erected but Prior to Pouring concrete. PARKING LOT: After gravel is in place but prior to Plac ing asphalt inspector shatl be enployed by the Ovmer/ tor during construction of the fcllowing work. A ccpy of the special esting reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 3000 P.S.I. (306 a.1) STRUCTURAL lrtELDS: Preforrned on the16-(fi7r-n- HIGH STRENGTH BOLTING: During all -bolt installation an? tighting operations (306 a.5) SPRAYED ON FIREPROOFING: (U.B.C StanCards 43-8) SPECIAL G84!lN!, rIlAyAIl_QI_lNq FILLING: During earthwork. & Chapter 29) GLU-LAM BEA.I.,IS: E an approved Inspection Certificate, agency, furnished to e covered or concrete the Cityts Building Division before beams are placed. (2501-U.B.C. STDS 2s-10,11) . * In addition to the inspections specified hereon, the Building 0fficial nay make or require other inspections of any construction work to ascertain compliance with the Building, City or Zoning Codes.until these inspections have been made and approved C ITY'S SITE PLAN RE\TIEW BOARD INSPECTION: MUSI bE TCqUCStCC 2 dAYS iN AdVANCC Of thE dAtC YCU wish inspec'tio:r. A11 project conCitions such as landscaping, parking lot striping etc. must be contpleted befcre requesting this inspection FIN.C,L PLUMBING FINAL ELECTRICAL FINAL I\{ECHANICAL FINAL FIRE DEPARTIIIE}IT FINAL BUILDING Department insp a Certificate c Must be requesteC after the final Plumbing, Electrical, Ivlechanical and Fire ections are made and approved. No 0ccupancy of the prenises can'be made until f 0ccupancy has been issued by the Building Divisicn and posted on the premises SICNA'DATE *ALL MANH0LES AND CLEANOUTS T1UST BE ACCESSIBLE, ADJUSTI*IENT TO BE MADE AT NO COST TO THE CIfi r tr tr tr