Loading...
HomeMy WebLinkAboutPermit Building 1992-02-12SPRINGFIELI) RESIDENTIAL PER]VIIT APPLICATION lnspections: 726-3769 Office: 726-3759 LOCATION OF PFIOPOSED WORK: ASSESSORS MAP:03- 35'2 LOT:BLOCK: V,zYr'// Ait, JOB NUMBER 225 Fifth Street Springf ield, Oregon 97 477 TAX LOT lz6oa lz 4a I ) PHON E: STATE:ZIP:CITY: ADDRESS: OWNER: NEW - REMODEL ADDITION DEMOLISH OTHER DESCBIBE WOFIK EXPIRES PHON E4-/T ffi StZrlS,z/n/q_ Z 7f6-q@ CONTBACTOR'S NAME MECHANICAL: ELECTRICAL: CONST, J CONTRACTOR /_- / ADDRESS ( orvsr /,Eac?f/'y/GENERAL: PLUMBING RANGE: r OF BDRMS: _ OFFICE USE _ LAND USE: ZONING CODE: FLOOD PLAIN: SOUARE FOOTACE: - SECONDARY HEAT: WATER HEATER: r OF UNITS: OUAD AREA: r OF BLDGS: OCCY GROUP: r OF STORIES: CONSTR. TYPE: HEAT SOURCE: To request an inspection, you must call 726-3769. This is a 24 hour recording. All inspections requested before 7:00 a.m. will be made the sa;ne working day, lnspections requested after 7:OO a.m. wlll be made the following work day. REQUIRED INSPECTIONS [l Temporary Electrictl Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover Underslab Plumbing/ Electrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Fireplace - Prior to facing materials and framlng lnsp. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting.Framing - Prior to cover. Foundation - After forms are erected but prior to concrete placement. Other Wall/Ceiling lnsulation - Prior to cover. Underground Plumbing - Prior to filling trench.[-l DrVwalt - Prior to taping MOBILE HOME INSPE TIONS Underlloor Plumbing/ Mechanical - Prior to insulation or clecking.Wood Stove - After installation. Posl and Beam - Prior to floor insulation or decking.lnsert - After flreplace approval and installatlon of unit. Blocking and Set.Up - When all blocking is complete. Floor lnsulation - Prior to decking.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Connections - When home has been connected to waler and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Slorm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Water Line - Prior to filling trench.I Fence - When completed Slreel Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. Rough Plumbing - Prior to cover. SUBDIVISION: E tl E r E E E tl Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - - lnterior - Corner - Panhandle - Cul-de-sac Setbacks P.L.HSE GAR ACC N S E rHE PROPOSED WORK IN THE--Hl-sronrcAl Drsrnrcr, oR oN THE HISTORICAL REGISTER? - lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED; VALUE KcoF l04,s (A) BFODP X S/SQ. FT. Total Value Building Permit Fee State Surcharge Total Fee ?.zb \d,13 BUILDING PERMIT ITEM SO. FT. Main Garage Carport BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT 'fhis permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Fleviewed By Date Receipt Numbe Plan Check Fee Date Paid Received By; SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (c) N0 FT. FT. FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS C'L5 ril6 Wood Stove/ lnsert/ Fireplace Unit Dryer Vent (D) N0Vent Fan Mechanical Permit lssuance State Surcharge Total Permit MECHANICAL PERM!T Furnace Exhaust Hood I further agree to ensure that all required inspections are requested at the proper time, that each address is readable ta33 L/ 7z- r) oo5-t C?'VALIDATION RECEIPT NUMBER DATE PAID it card is located at the front set of plans will remainp construct ionon the site Date sis AMOUNT RECEIVED RECEIVED BY from the street, that of the property, and, MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) \oq,19 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I