Loading...
HomeMy WebLinkAboutPermit Building 1992-02-10COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fitfi Street, Springfield, Oregon 97477 SPRINGF]ELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK zffi -M/14///9* ASSESSORS MAP:rAX Lor: C\SO \ NEW - REMODEL ADDITION DEMOLISH OTHER PHONE: STATE:2747-zZIP: VALUE: o3 77/7 OWNER: ADDRESS CITY: DESCRIPTION OF WORK ELECIRICAL: NAME ADDRESS PHONE EXPI RES PHONEADDCONTRACTOR # CONST. CONTRACTOR'S NAME ARCHITECT MECHANICAL GENERAL: PLUMBING '+ NO.. FEE CHARGE Single Fixture Relocated Bl (new fix. add dg. t l) Water Service ft Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT $10.00 >100,000 BTUs pended wall or oor t an ng or ht ex au st Floor furnace and vent Permit lssuance TOTAL PERMIT Furnacelburner & vent BT Furnace/burner & vent hood and duct mounted unit heater ntp separate tationary evap. cooler duct aVent from _ OFFICE USE _ LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER: OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SO. FT.$/SQ. FT.VALUE PLAN CHECK FEE RCPT# s DATE TOTAL VALUE OF PROJ X X SO. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER ?e.zz BUILDING PERMIT 4/. se PLUMBING DEMOLITION 5% State Su rc haroe 2-23 5% State Su rcharge MECHANICAL FENCE VALUE $ 5% State Su rch arq e SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL fu'j^ \7 REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3765 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRICAL & and approved. Section 306 0f the state specialty code MECHANICAL: To be made _ a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: aAE. r copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steet in place, but framing inspection' STRUCTURAL CONCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.1) coNcRETE sLAB: To be the roof' all framing' fire made arter a, insrab buirdins ||!:l::.':l 3ffi:It"f,Xl:r" F:RS'T""f3l,H5tT',rrr, ,, service equipment, conduit, and vents are complete and :#1,?;""".',:;il:? ?['*:'::i :X? H::[f,it"ji':,1'iJ;[3:1: Bl?,lf],?E]nol[,?P,,'I]X"oin place but before any tightening operations. (306 concrete is placed. INSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or f illing applied. SPECIAL GRADING, t renc hes. ,NDERFLo.R: p,umbins [l?:,S".?'f;m'J3[H]"' il:l.Tiiil-:li:'5J:'j]'"i, electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the City's poST & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 u'Bc' insulation, decking or floor plastering is applied or before STDS' 25-1011)' sheathing. gypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'71 VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING ANO NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ADDITIONAL COMMENTS: FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this insPection.FINAL ELECTRICAL X FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL MECHANICAL FINAL FIRE DEPARTMENT PLANS REVIEWED BY oert Z-/a-22 By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY ure without permission of the Building Safety Division. I further certify that only contractors and employees ure that all required inspections are requested at the proper time, that tion com rther agree to treet, that the mes during ans will .J?6t*Si of the City o' will be made f Springfield, st ru ct with ORS 701.055 will be used on this projectwho is readable from the n on the site at alls located of the property, and the approved set DATE PAID: RECEIVED VALIDATION AMOUNT RECEIVED: RECEIPT *: